Rule 28, Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation & Storage) Rules, 2019: Execution of lease
Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation & Storage) Rules, 2019 - Rule 28
Text of rule 28
Execution of lease
28. Execution of lease.—
(1) Where a mineral concession is granted under the rules the formal
lease deed shall be executed by the Collector in Form “B” within 180
days of the order sanctioning the lease and if the person to whom
such mineral concession has been granted fails to submit the
required documents for execution within the aforesaid period the
order sanctioning the lease shall be deemed to have been revoked,
and in that event the application fee and the security deposit shall be
forfeited.
Provided that no lease shall be executed unless the person to
whom such lease has been granted submits the mining plan and
environment clearances as required under these rules.
Provided further that where the Collector is satisfied that the
person to whom such lease has been granted is not responsible for
the delay in execution of the formal lease, he may permit the
execution of the formal lease even after the expiry of the aforesaid
period of 180 days.
(2) The date of the commencement of the period for which a mineral
concession is granted shall be the date on which the mining lease
deed is executed under sub-rule (1) and the lessee shall be liable to
pay rent/royalty from the date of the execution of the mining lease.
(3) The lease dead has to be duly registered by paying proper stamp
duty and registration fees.
(4) No claim for extension of lease period shall be entertained for any
delay.
CHAPTER – V
SETTLEMENT OF SAND
29 (A) (1) Mode of Settlement.—The settlement of sand as minor
mineral shall be done by public auction-cum-tender through
e-bidding mode in favour of the highest bidder by the
Collector/any officer so authorised by the State Government.
(a) The State Government shall issue a notification regarding
mode & detailed procedure for settlement of sandghats from
time to time as and when required.
(b) The highest bidder shall deposit 10% of the auction amount
immediately after the auction, following which an in-principle
sanction order shall be issued in his favour by the
Collector/ any officer so authorised by the State Government.
(c) The highest bidder shall submit the required documents
within the prescribed time limit as referred to in the prevailing
notification issued by the State Government in this regard,
following which the work order shall be issued in his favour by
the Collector/ any Officer so authorised by the State
Government.
(d) The successful bidder or the Government/ Corporation as the
case may be shall submit a mining plan prepared for the
respective sandghats and shall be approved by the Director or
any person / officer authorised in this regard.
(e) The successful bidder or the Government/ Corporation as the
70 ॢबह�र गजट
[स�ध�रण�� 17171717 िसत� बिसत� बिसत� बिसत� बरररर 2019201920192019
case may be shall obtain environmental clearance from the
competent authority as per the prevailing Environmental
Impact Assessment notification of the Ministry of
Environment, Forest & Climate Change, Government of India
and as per the provisions of the Environment Protection Act.
(2) Restricted areas for sand quarrying.—
(i) The quarrying of sand shall be prohibited within 300
(three hundred) meters on both sides of any railway
bridge or any bridge falling under any National
Highway/ State Highway and shall be prohibited within
100 (one hundred) meters of both sides of any other
bridge. However the prohibited zone in respect of any
particular bridge may be extended by the State
Government through a notification in this regard, if so
required for reasons of safety.
(ii) No quarrying shall be permitted within 50 (fifty) meters
of any public place i.e. Cremation ghat or any religious
place etc.
(iii) No quarrying shall be permitted within 5 (five) meters
from both banks of the river.
(iv) The quarrying of sand shall be prohibited within 100
(one hundred) meters upstream and downstream from
any dam/ weir or any other structure erected for
irrigation purpose.
(v) Sandghats should preferably be located on the river
side of embankment. For low embankment less than 6
metres height, quarrying should not be done within 25
metre from toe/heel of the embankment and depth of
mining should not be more than 1.00 metre. In case of
higher embankments, the distance should not be less
than 50 metre and depth of mining should be
maximum 1.50 metre and at a distance of 75 metre or
more mining depth should be maximum 2.00 metre. In
order to obviate the development of flow parrallel to
embankment, crossbars of width eight times the depth
of mining pits spaced at 50 to 60 metres center to
center should be left in the mining pits.
(vi) The irrigation outlet shall be maintained at the same
level as that of the riverbed and in no case the river bed
level shall be permitted to be below the irrigation outlet
level. No quarrying shall be permitted around the
infiltration well/ intake well up to a distance of 5
meters.
(vii) The extraction of sand shall be permitted only after
obtaining a No Objection Certificate from the Water
Resources Department in the case of rivers where from
irrigation channels are out flowing.
(viii) No quarrying of sand shall be permitted in any private
land owned by any person unless the settlee obtains
the consent of the concerned land owner /raiyat.
(ix) No quarrying of sand shall be permitted in any area
which the State Government notifies as a restricted area.
71 ॢबह�र गजट
[स�ध�रण�� 17171717 िसत� बिसत� बिसत� बिसत� बरररर 2019201920192019
(3) Maximum depth of Sand Mining.—The maximum depth of
mining in the river bed shall not exceed 3 (three) meters
measured from the unmined bed level at that point of time or
the water level whichever is less. All such pits formed during
the course of excavation shall be filled on a regular basis.
(4) Fixation of Minimum Reserve Value.—
(i) The minimum reserve value shall be fixed as decided by
the Department.
(ii) If no bidder turns up during the auction process on the
fixed minimum reserve value, even after three attempts,
the minimum reserve value shall be revised by the
departmental technical committee on the basis of sand
reserve in the concerned area, other local/ technical
conditions and recommendation received from district
level committee headed by Collector. A re-auction of the
said reach/sand block/sand ghat shall be conducted
on the basis of revised minimum reserve value after
taking approval of the State Government.
(5) Failure on the part of the successful bidder.—In case the
successful bidder fails to deposit the required security deposit
along with other payable taxes within the prescribed time limit
as referred to in the prevailing notification of the State
Government in this regard, his security deposit shall be
forfeited and a fresh settlement process for the concerned
sandghats through public auction shall be initiated.
29 B Payment of Security Deposit.—
(1) Every settlee of sand as minor mineral shall deposit the
amount equivalent to 10 (ten) percent of auctioned / tendered
amount as security for due observance of the terms and
conditions of settlement which shall be refunded after the
expiry of the period of settlement / adjusted with the last
installment of the settlement by the Mining Officer (as defined
in the rules).
(2) Award of Concession and Signing of Deed.—The successful
bidder shall be awarded the concession to mine sand for a
period of 5 years. The successful bidder shall execute the
settlement deed in form ‘B’ as prescribed in this rule or a
form as near thereto before starting work. In case the approval
of mining plan and the environment clearance have not been
obtained, successful bidder shall obtain the same before the
execution of settlement deed.
(3) Mode of Payment of Royalty / Settlement Amount.—
(i) The settlee shall make payment of the settlement
amount as laid down in the Tender Document.
(ii) In case the royalty computed on annual basis for the
mineral extracted exceeds the annual settlement
amount, the settlee shall be liable for payment of
excess royalty for the additional quantity as extracted
in addition to the settlement amount.
(4) Default in Payment-In case of default in payment of any
installment within prescribed date, a simple interest at the
rate of 24 percent per annum shall be charged.
72 ॢबह�र गजट
[स�ध�रण�� 17171717 िसत� बिसत� बिसत� बिसत� बरररर 2019201920192019
29 C. Observance of terms & conditions of mining plan/
environmental clearance.—The settlee shall observe the terms
and conditions of the mining plan as well as the terms and
conditions laid in the Environmental Clearance pertaining to
the concerned settlement.
29 D. Deployment of Machinery in sandghats.—The settlee shall
follow stipulations enumerated in Sustainable Sand Mining
Management Guidelines, 2016/conditions specified in
Environmental Clearance.
29 E. Online Sand Portal.—The Settlee shall make sale of sand to all
consumers (small, medium or large) either through online or
offline mode. All transactions/payments, excavation, production
/ transportation, stocking details shall be captured through the
departmental online real time monitoring system. Sale of sand
shall be controlled by electronic documentation linked to a
central documentation monitoring facility and all lessee shall
upload a monthly progress report on the departmental portal
without fail.
29 F. Installation of Weighbridges.—Each sandghat may have an
electronic weigh-bridge, integrated with central server. However
for adjacent sandghats, department may allow use of common
weighbridge. Any vehicle found carrying sand without proper
weighment slip/ e-challan shall be liable to be seized under the
provisions of the Mines and Minerals (Development and
Regulation) Act, 1957 or the rules made there under.
29 G. Government’s Right to undertake De-silting.—The
Government reserves the right to take up desiltation projects, in
such allocated mining blocks, to maintain the river flow,
safeguard the embankments and habitations along the rivers on
account of geo-technical and hydrological considerations. The
department shall issue guidelines for disposal of sand excavated
in the process of De-silting.
29 H. Removal of subsoil sand from raiyati land.—The settlee
may remove subsoil sand from raiyati land after taking consent
and adequately compensating the land owner. Such proposals
shall be included in mine plan and due environmental clearance
from concerned competent authority of MoEF & CC has to be
obtained before starting mining operations.
29 I. No objection from Water Resources Department.—In case
of lifting sand from any sandghat if any natural water course /
irrigation canal falls in between the link road and the sandghat
then the settlee may erect temporary structure for
transportation of sand with prior permission of water resources
department. Such application for prior permission shall be
submitted by the settlee before the concerned Chief Engineer
of Water Resources Department. If no decision is communicated
in this regard to the settlee within one month from the date of
application then it will be deemed that the concerned
Department has no objection in the proposal.
Previous and next
Questions people ask
Is rule 28 of Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation & Storage) Rules, 2019 still in force?
No repeal of Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation & Storage) Rules, 2019 is recorded.