Rule 62, Tamil Nadu Combined Development and Building Rules, 2019: Telecommunication Structure
Tamil Nadu Combined Development and Building Rules, 2019 - Rule 62
Text of rule 62
Telecommunication Structure
62. Telecommunication Structure.—(1) Structures may be.—
(a) Steel fabricated tower or antenna’s on steel pole;
(b) Pre-fabricated shelter of fiberglass or P.V.C. on the building roof
top/terrace for equipment;
(c) Masonry Structure or Shelter on the ground for equipment;
(d) D.G. Set with sound proof covers to reduce the noise level.
(2) Location: The Telecommunication Infrastructure shall be either placed on
the building rooftop or on the ground or open space within the premises
subject to the following regulations:
(a) Base Trans Receiver Station (BTS) Towers and installation of equipment for
Telecommunication Networks:
(i) BTS structures are not considered as buildings and only structures for
telecommunication. It can be allowed either on a plot or on top of a
building.
(ii) When proposed in a plot, it shall have proper access, which may be a
private access.
(iii) When the proposed BTS tower is on a roof top, for the purpose of deciding
on the height of the building defined in these rules, it shall not be taken
into account, hence the question of additional setback if any for the
building does not arise.
(iv) It shall not be located either within a Heritage precinct or on a heritage
building listed for conservation.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 73
(v) BTS room size shall not exceed 15 sq.m. in floor area and 3 m in height.
(vi) Height of these structures shall conform to the regulations of the Civil
Aviation Department, Indian Air Force and Director of Fire and Rescue
Service.
(vii) Building over which BTS towers proposed shall be structurally strong to
take the load of these structures including the wind load to be certified
by the Registered Structural Engineer.
(viii) These BTS structures shall be sound and safe.
(ix) The generator shall not cause noise or air pollution.
(x) The service provider shall pay the fees as may be uniformly fixed by the
Government and notified from time to time.
(3) Requirement: The Service provider shall have obtained necessary permission from
the Standing Advisory Committee on Radio Frequency Allocation” (SACFA) issued by
Ministry of Telecommunications before seeking Building Permit for the
telecommunication structures.
(4) - (a) Every applicant will have to produce the structural safety & stability certificate for
the above structures and for the building over which it will be erected from the
Registered Structural Engineer (SER) and it shall be the liability of both the owner
and the SER.
(b) Applicant has to produce or submit plans of structure to be erected.
(c) Projections: No Pager and/or Telephone Tower shall project beyond the existing
building line of the building on which it is erected in any direction.
Previous and next
All provisions of Tamil Nadu Combined Development and Building Rules, 2019
Questions people ask
Is rule 62 of Tamil Nadu Combined Development and Building Rules, 2019 still in force?
No repeal of Tamil Nadu Combined Development and Building Rules, 2019 is recorded.