Rule 9, Tamil Nadu Combined Development and Building Rules, 2019: Inspection
Tamil Nadu Combined Development and Building Rules, 2019 - Rule 9
Text of rule 9
Inspection
9. Inspection.— (1) General Requirements.— (a) Generally all development works for
which permission is required shall be subject to inspection by the competent authority
or an official nominated by the competent authority, as deemed fit, before issue of
permission and also during construction.
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 19
(b) The competent authority may cause inspection for such developments where its
risk assessment deems it fit for inspection. In all cases inspection shall be
carried out by professionals to be empanelled by the competent authorities. The
qualifications and other conditions for empanelment of professionals for
carrying out inspection shall be prescribed by the Government from time to
time.
(c) A single joint site inspection shall be carried out by all the concerned authorities
for issue of planning permit or building permit or completion certificate)
(d) The applicant shall permit authorized officers of the competent authority to
enter the site at any reasonable time for inspection for the purpose of enforcing
these rules.
(e) The applicant shall keep a copy of the approved plan at the premises where the
development is permitted to be carried out.
(f) Before commencement of the building work at site for which building
permission has been granted, the owner shall within the validity period of
Building Permission give notice to the Authority, of his intention to start the
work at the building site in Form 2 in Annexure - XIV.
(2) During Progress of Construction.—Minimum Stages for recording progress,
checking and issuing continuance certificate (For non High Rise Buildings above
12.0 m in height)
(i) Plinth,
(ii) Last storey.
(b) At each of the above stages, the owner or developer through the Registered
Architect or Registered Engineer shall submit to the designated officer of the
competent authority a progress certificate inForm 3 and 4 in Annexure - XIV
and the structural Inspection Report inForm 9 in Annexure - XIV. This progress
certificate shall be signed also by the Registered Architect or Registered
Engineer on record, Construction Engineer on record and structural engineer on
record. The Structural Inspection Report shall be signed by the Registered
Structural Engineer on record.
(c) On receipt of the progress certificate from the owner or registered developer,
through the Registered Architect or Registered Engineer it shall be the duty
of the competent authority, to check any deviation from the approved plan
and convey decision within 15 working days to the owner or
developer for compliance.
Previous and next
All provisions of Tamil Nadu Combined Development and Building Rules, 2019
Questions people ask
Is rule 9 of Tamil Nadu Combined Development and Building Rules, 2019 still in force?
No repeal of Tamil Nadu Combined Development and Building Rules, 2019 is recorded.