LawGrids logoLAWGRIDS.ORG

Form V, Tamil Nadu Combined Development and Building Rules, 2019: FORM - V

Tamil Nadu Combined Development and Building Rules, 2019 - Form V

Text of form V

FORM - V

FORM - V Affidavit by the Applicant (see rule 3(3)) This deed of undertaking executed at ……………on the………………… day .................................. of …………… 20……. by Thiru/Tmt/Selvi………….............................. Son/Daughter of………………….aged……………. residing at................................ ...................No.………………………………… in favour of the Executive Authority,—————— —having office at ———————————— witnesseth as follows:- 2. I have applied for the grant of permission to operate the swimming pool at………............................................premises No.…………………………………………………by submitting an application in accordance with the norms prescribed in the Tamil Nadu Urban Local Bodies (Regulation and Monitoring of Swimming Pools) Rules, 2015. I am associated with the swimming pool as Land Owner/Power of Attorney Holder/lease holder. I assure that I shall operate the swimming pool only in accordance with the said rules and if any deviation of the said Rules is later on found, I agree to abide by the action taken by the Executive Authority. 3. I hereby undertake that, I am, jointly and severally responsible with the Land Owner/Power of Attorney Holder/Lease Holder to carry out the operations in accordance with the conditions laid down in the permission so granted and also for payment of necessary charges levied from time to time by the Authority and also liable for penal provisions for developments made in contravention of the rules and these presents. 4. This deed of undertaking is executed by me on the…………………… day................................................ of…………………20…………with the full knowledge of the contents of this document. DEPONENT Witnesses: 1. 2. Duly attested by the Notary Public SEAL: 190 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY FORM – VI Permission to Operate Public Swimming Pool (see rule 3(4)) From The Executive Authority , …………………… To (Name and address of the Owner / Occupier of the Land / Power of attorney holder / Lease Holder) * Sir, Permission is hereby accorded for the operation of swimming pool in the ————— ————— in S.No.———— of Block No………….of Revenue Division No………….. subject to the conditions stipulated below and the provisions contained in the Tamil Nadu Urban Local Bodies (Regulation and Monitoring of Swimming Pools) Rules, 2015. If any deviations or violations there of are found, strict action shall be taken as per Rule 8 of the said Rules and the permission granted herein to operate the swimming pool will be suspended. Signature of the Executive Authority This permit is subject to the following conditions:- (i) Every person operating the swimming pool shall follow all the rule provisions contained in the said Rules. (ii) In case of violation of any of the provisions of the said Rules, the Executive authority shall not permit operation of the swimming pool. TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 191 192 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY ANNEXURE – II (see rule 19 (2) (i) ) Minimum distance indicated < 0.5 – 1 3 A – End wall to Tip of Board 1 1.5 1.5 B – Centre of board to sidewall or adjacent board 3 3 3.6 C – Centre of board laterally to point of required depth 1.2 1.2 1.8 D – Depth at end of board and for beyond 3.6 m 2.8 3 3.6 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 193 ANNEXURE – III (see rule 19 (2) (ii) ) LONGITUDINAL CROSS SECTION 194 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY THE TABLE Dimensions of swimming pools with diving facilities in excess of three meters in height Sl.No. Dimensions Designation 5m 7.5m 10m Platform Platform Platform (m, Min) (m, Min) (m, Min) (1) (2) (3) (4) (5) (6) i Length 6.0 6.0 6.0 ii Width 1.5 1.5 1.5 iii From Plummet: A 1.5 1.5 1.8 back to pool wall iv Back to platform directly below - 1.5 1.5 v From Plummet to pool wall at side B 3.9 4.5 5.2 vi From plummet to adjacent plummet C - - 3.6 vii From plummet to pool wall ahead D 10.5 11.0 13.7 viii On plummet from board to ceiling overhead E 3.6 3.6 3.6 ix Clear overhead behind and each side plummet F 2.7 3.0 5.0 x Clear overhead ahead of plummet G 5.0 5.0 5.0 xi Depth of water at plummet H 4.3 4.5 5.2 xii Bottom distance ahead of plummet J 6.0 8.0 12.2 xiii Bottom depth ahead of plummet K 3.3 4.0 4.5 xiv Bottom distance each side of plummet L 3.6 4.0 4.3 xv Bottom depth each side of plummet M 4.3 4.5 5.2 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 195 Annexure – XXI [See rule 65] Installation of Closed Circuit Television units in public buildings 1. Definitions :- (1) In these Rules, unless the context otherwise requires :- a) “Commissioner” means the Commissioner of a Municipal Corporation or a Municipality; b)“ Executive Authority” means the executive authority of a Municipality or a Town Panchayat; c) “public building” means, any building where public have an access for any purpose and used as a - (i) higher secondary school or a college or a University or other similar educational institutions (including private institutions) ; (ii) hostel where more than 100 persons reside; (iii) hospital, nursing home, dispensary, clinic, maternity centre or any other similar institution, having a floor area of 500 square metre and above; (iv) boarding and lodging house or a star hotel; (v) choultry or marriage hall; (vi) cinema theatre, amusement park, swimming pool, recreation centre, motion picture house, assembly hall, auditorium, exhibition hall, museum, skating rink, gymnasium, dance hall, recreation pier, stadium or bar; (vii) market for the display and sale of merchandise, shop or a store either wholesale or retail having a floor area of 500 square metre and above; (viii) bank, ATM Counter, Insurance company; (ix) jewellery shop; (ix) shopping mall, a building providing multiple services or facilities to the public like shopping, cinema theatres, restaurants, etc., for example a multiplex or a shopping complex; (x) petrol filling station; 196 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY (xi) industry carrying the activities of production, manufacturing and services where more than 100 persons are employed; (xii) institution of information technology services, radio broadcasting station or television station; (xiii) place of religious worship or a place of religious, political or social congregation by the public or any class or section of the public, where more than 500 persons assemble at a time; (xiv) office of the Central Government or any State Government or any local authority or any body corporate owned or controlled by the Central Government or any State Government, where more than 100 persons are employed or having a floor area of 500 square metre and above ; (xv) office of any Quasi-Governmental organization or any Government undertaking controlled by the Central Government or any State Government, where more than 100 persons are employed or having a floor area of 500 square metre and above; (xvi) library, lecture room, public concert room, hotel, coffee house, eating house, club or a club room, having a floor area of 500 square metre and above ; (xvii) Bus Station or a Bus Terminal ; and d) “urban local body” means a Municipal Corporation, a Municipality or a TownPanchayat . (2). Words and expressions used but not defined in these rules shall have the meanings respectively assigned to them in the Acts. 2. Provision of Closed Circuit Television Units .- (1). In every public building, within the territorial area of an urban local body, Closed Circuit Television units shall be installed by the owner or occupier of that building in the manner specified below : Provided that, in a building, where public have an access or gather in large numbers and not covered under clause (c) of rule 1 or in any other place where the public gather in large numbers for religious, social, political or any other purpose, Closed Circuit Television units shall be installed by the owner or occupier of that building or place, if required by the District Collector, on the recommendation of a police officer not below the rank of Deputy Superintendent of Police or Assistant Commissioner of Police, or otherwise, to do so, for the purpose of crime control or for maintaining public order and peace or for any other reasons, to be recorded in writing, within a reasonable time given by the District Collector. 2) In every public building, Closed Circuit Television units shall be installed at the rate of one unit for every 300 square metre of floor area and part thereof. 3) The Closed Circuit Television units shall be installed at suitable vantage points such as entry points, exit points, corridors, reception area, etc., in such a manner that the movement of the public can be closely surveilled. 4) Every person intend to construct or reconstruct a public building shall make necessary provision in the building plan itself for the installation of Closed Circuit Television units in the manner prescribed in sub-rules (1) and (2), while making application to the Commissioner or the Executive Authority of the urban local body concerned for granting of permission for the execution of that work. 5) The Commissioner or the Executive Authority of the urban local body concerned shall, before giving permission for the construction of a new public building or reconstruction of an existing building as a public building ensure that necessary provisions have been made in the building plan for the installation of Closed Circuit Television units in the manner as prescribed in sub-rules (1) and (2). TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 197 6) In all existing public buildings, Closed Circuit Television units shall be installed in the manner as prescribed in sub-rules (1) and (2) by the owner or occupier of the building within a period of 6 months from the date of coming into force of these rules. If the Closed Circuit Television units are not installed within such time limit, the regular type Trade or Business License issued by the competent authority under the relevant statutes to the owner or occupier of that building may, at any time, be cancelled or suspended. The Commissioner or the Executive Authority of the urban local body shall ensure that the Closed Circuit Television units have been installed in such buildings in the manner as prescribed in sub-rules (1) and (2). 7) Where a building, which is not used as a public building, is proposed to be used as a public building, Closed Circuit Television units shall be installed in such building by the owner or occupier, before such change of use and the concerned licensing authority competent to permit such business, trade or profession shall permit to carry out such change of use in the building only after ensuring that Closed Circuit Television units have been installed therein in the manner as prescribed in sub-rules (1) and (2). 8) The Commissioner or the Executive Authority of the urban local body concerned shall, while receiving the notice of completion of construction or reconstruction of a public building, to be given by the owner of that building, shall ensure that the Closed Circuit Television units have been properly installed in such building in the manner as prescribed in sub-rules (1) and (2). 198 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY Annexure – XXII [See rules 35 (5) and 63 (1)] Rainwater Conservation Water Conservation: A. Rain Water Harvesting Effective measures shall be taken within each premises (roof top and campus) for conservation of rainwater, and RWH structures to the following standards shall be provided; the same shall be shown in the plan applied for planning permission. a) Non High Rise Buildings – Buildings of height up to 12m Following are the recommended designs that can be adopted in the non High Rise Buildings ie., Independent Houses and Apartments with Ground + two floor or Stilt + 3 floors and not more than 16 dwelling units). (i) In plots that are being developed/buildings with a dug (source) well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter and the overflow to be diverted to the source well. The rain falling on the driveway or paved setback areas (around campus) and from rooftop pipes that are not connected to the sump or source well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. (Drawing 1A & 1D). (ii) In plots to be developed/buildings without an open well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter and the overflow to be diverted to a recharge well. The rain falling on the driveway or paved setback areas and from rooftop pipes that are not connected to the sump or recharge well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. ( Drawing 1B & 1D) (iii) In plots to be developed/buildings where the setback area is very small, not enough to dig a recharge well or sewers, water line, electrical cable running below, rooftop water brought down by pipes should be led to percolation pits, one per pipe. (Drawing 1C) b) Non High Rise Buildings more than 12m height and upto 18.3m heighrand Industries and Institutional Buildings In case of Non High Rise developments, Industries, Institutional Buildings as mentioned in all the above cases, rooftop water can be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter that is available in the market and the overflow to be diverted to either a dug (source) well or a recharge well depending on the availability of a source well. Depending on the need and relevance any combination of the above methods can be chosen. (i) In the above mentioned categories, rain falling on the setback areas as well as some of the rooftops will flow on the driveway itself and runoff to the streets and get wasted. This runoff should be intercepted by means of a bump/speed breaker arrangement constructed in one or more locations within the premises and discharged into suitably designed recharge well (s) located nearby. (Drawing 3A.) TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 199 (ii) Rain falling on the setback areas as well as some of the rooftops will flow into the storm drains constructed along the periphery of the building, whose slope will always be towards the gate(s) in order to discharge the runoff onto the street. This flow within the drain can be intercepted inside the drain by a baffle wall and injected into several recharge wells located close to the drain. (Drawing 3B.) c) High Rise Buildings (Residential/Commercial) (i) In plots that are being developed/buildings with a source well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or an Special filter that is available in the market and the overflow to be diverted to the source well. The rain falling on the driveway or paved setback areas or from rooftop pipes not connected to the sump or source well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump and led to a recharge well. ( Drawing 2A & 2D) (ii) In plots to be developed/buildings without an open well, rooftop water to be diverted to a sump for immediate use (if that is relevant), through a first flush cum pebble-sand filter combination or a Special filter that is available in the market and the overflow to be diverted to a recharge well. The rain falling on the driveway, paved setback areas, and from rooftop pipes that are not connected to the sump or recharge well to be intercepted near the gate(s) either by means of a gutter (provided with a perforated lid) or a bump/speed breaker arrangement and led to a recharge well. (Drawing 2B, 2C & 2D) B. Recycling Of Grey Water: Effective measures shall be taken within each premise for recycling of Grey water (water used for washing of cloths and bathing) and structures to the following standards shall be provided, the same shall be shown in the plan applied for Planning permission. The methodology for the recycling of Grey water for the uses of Ground water recharge (Drawing 4) and flushing of toilet (Drawing No.4B). Prepare a soil bed of garden soil whose area should be at least 2.5 sq ft per each individual. Lay the water-loving plant at a distance of one foot from each other laterally and longitudinally. The soil area need not have a regular shape. It can have any shape as long as the requisite area is provided. But the level of the soil bed should be uniform so that the grey water will spread over the entire bed and soil over the entire area is available for cleaning the water. If there are slopes, water will tend to flow more in the lower areas alone and the purification will be incomplete. The plants must receive at least moderate amount of sunlight so that they will grow in a healthy manner. The plants should be watered with fresh water for two or three weeks till they take root and are stabilised and then the grey (used) water should be diverted to it in progressively increased volumes over a week. Thereafter, the process is practically self- sustaining. (Drawing 4A) If the treated water is to be physically recovered, a sump has to be built for this purpose. The treated water can then be pumped to the relevant compartment of the over- head tank or to an exclusive tank, for flushing. If there is excess of treated water, the overflow can be connected to a suitable water recharge structure. (Drawing 4B) 200 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 201 202 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 203 204 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 205 206 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 207 208 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 209 210 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 211 Annexure XXIII [See rule 20 (6)] Completion Certificate Norms 1) The following guidelines are issued for the purpose of treating the building as completed for issue of completion certificate a) In respect of commercial buildings, the following items should have been completed in all respects. However, interior completion works, fixtures, flooring and partition need not be insisted. (i) Terrace Floor with weathering course including parapet wall (ii) Lift Machine Room, OHT and Stair-case Head room (iii) Electrical installations (switch boxes and fixtures not to be insisted) (iv) Sanitary and water supply installations (fixtures not to be insisted) (v) Sump for water storage (vi) Outer plastering of the building (vii) Frames for joinery (viii) No dowel rods left out in the building for vertical or horizontal expansion (ix) Completion of Internal Plastering and Flooring need not be insisted b) In case of residential buildings, the following items shall have been completed in the said project to consider it for issue of Completion Certificate (i) Terrace Floor with weathering course including parapet wall (ii) Lift Machine Room, OHT and Stair-case Head room (iii) Electrical installations (switch boxes and fixture not to be insisted) (iv) Sanitary and Water Supply installations (fixtures not to be insisted) (v) Sump for Water storage (vi) Outer plastering of the building (vii) Frames for Joinery (viii) Kitchen (Provision on Modular Kitchen is permitted provided provision for water supply / drainage is made) (ix) Internal partition walls (x) No dowel rods left out in the building for vertical or horizontal expansion (xi) Completion of Internal Plastering and Flooring need not be insisted. 2) Completion Certificate Norms a) Norms for Non High Rise buildings with GF + 2F or Stilt + 3F subject to a maximum of 12m height with 16 dwellings or up to 300 square meters of commercial building shall be regulated according to the table below: Sl. No Parameters Norms 1. Dimension of the Building The increase in the dimension of the building shall not exceed 0.30 mts in length and 0.30 mts in width. 2. Set Backs The reduction in setbacks is allowed on all sides by 0.30 mts, subject to availability of minimum set back of 1.20 mts. in the event of prescribed minimum setback being 1.5m and by 0.20 mts subject to availability of minimum set back of 0.80 mts. In the event of prescribed minimum setback being 1.0m 212 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 3. Height of the Building Increase in height of the building is permitted not exceeding 3% of the building height approved as long as such increase does not exceed 12m and does not constitute an additional floor. In case of Institutional building if it does not exceed 18.30 mts. 4. FSI Tolerance Limit FSI Tolerance limit will be maximum of 15 sq.m over and above the permissible FSI. 5. Over Head Tank Change in the location/ Architectural orientation permissible. In case of increase in the size of the over head tank necessary fees to be collected. 6. Inter connection between two flats Permissible as long as it satisfies parking requirement. 7. Change in the position of the columns and introduction of new columns in the stilt floor Permissible as long as it does not affect minimum parking lots required as per approved plan is left as car parking space. Movement and parking of required number of cars on ground can be taken irrespective of certain deviations from the approved plan, subject to conformity to DR provision relating to Parking and Driveway. 8. Non FSI area Change in location of incident use as long as within non-FSI area permissible limit. 9. Variation between document dimension and site dimension If on site measurements area are less than originally approved from PLR line, but even, this lesser set backs on the site confirm to these rules. 10. Entrance Arch / Pillar As per the provision of these rules. 11. Pergola Permissible for elevation purpose in the terrace not exceeding 10 % area of the respective floor Pergola projections in other places will be treated as architectural features, as per the provisions of these rules. 12. Rain Water Harvesting Should be provided. 13. Compound wall constructed including the land left for road widening Not permissible. Permanent compound wall to be constructed as per the approved plan after leaving the street alignment or road widening portion. TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 213 b) Norms for Non High Rise buildings upto 18.30m height and exceeding 16 dwelling units and exceeding 300 square meters of commercial building shall be regulated according to the table below:: Si. No. Parameters Norms 1. Dimension of the building The increase in the dimension of the building shall not exceed 0.30 mts. In length and 0.30 mts. in width. 2. Set Backs / Distance Between Blocks. 0.30 mts. reduction in setbacks is allowed on all sides, subject to availability of minimum set back of 1.20 mts. in the event of prescribed minimum setback being 1.5m and by 0.20 mts subject to availability of minimum set back of 0.80 mts. In the event of prescribed minimum setback being 1.0m 3. Height of the Building Increase in height of the building is Permitted not exceeding 3% of the building height approved as long as such increase does not exceed 18.30 mts. and does not constitute an additional floor. In such cases, additional setback for the additional height increase shall not be insisted. 4. FSI Tolerance Limit FSI Tolerance limit will be 0.03 of FSI or 50 Sq.mt. floor area whichever is higher over and above the permissible FSI. 5. OHT Change in the location/orientation permissible. In case of increase in the size of the OHT, development charges to be collected. 6. Inter connection between two flats Permissible as long as it satisfies parking requirement. 7. Change in the position of the columns and introduction of new columns in the stilt floor. Permissible as long as it does not affect minimum 3.00 mts. driveway for vehicular movement and the no. of minimum parking lots required as per approved plan is left as car parking space. Movement and parking of required number of cars on ground can be taken irrespective of certain deviations from the approved plan, subject to conformity to TNCBR provision relating to Parking and Driveway. 8. Non FSI area Change in location of incidental use within non-FSI area permissible limit. 9. Variation between document dimension and site dimension If on site measurements are less than originally approved from PLR line, but even this lesser set backs on the site conform to these rules- Permissible. 10. Entrance Arch / Pillar As per the provision of these rules. 214 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 11. Pergola Permissible for elevation purpose in the terrace not exceeding 10% area of the respective floor. 12. Rain water harvesting Should be provided. 13. Compound Wall constructed including the land left for road widening. Not permissible. Permanent compound wall to be constructed as per the approved plan after leaving the Street Alignment or Road widening portion. However, the land left for road widening may be utilized for landscaping with temporary grill / barbed wire fencing, with or without Dwarf wall not exceeding 0.60 mts. height. 14. Fire license As per the provisions of TNCBR 15. OSR land As the OSR space is vested with competent authority or Local Body, no structure shall be constructed or erected on OSR land. 16. Structures permitted in the set back area Access steps to Ground floor and ramps, (without affecting ventilation of Basement Floor) closed Well, Water and Sewage Treatment Plant, Generator, Box type transformers are permitted in the set back area subject to availability of minimum driveway of 3.00 mts. and parking requirements as per the approved plan. 17. Structures permitted in the Terrace Floor AC Plant and Two toilets in every block are permitted in the Terrace Floor Architectural feature in the periphery on the top most floor (Terrace Floor) up to 3.00 mts. height is permissible subject to the condition that the portion constructed over allowable 1.5 mts. height parapet wall shall be non continuous with solid portion not exceeding 50% of the surface area. 18. Installation of Solar Energy System 1/3 rd area of the total terrace area to be reserved for erecting Solar Photo Voltaic Panels. The approximate space required for erecting Solar Voltaic Panel is 10 sq.mt for generating 1 KW of electricity. c) Norms for High Rise buildings shall be regulated according to the table below:: Si. No. Parameters Norms 1. Dimension of the building The increase in the dimension of the building shall not exceed 0.30 mts. in length and 0.30 mts. in width. TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 215 2. Set Backs / Distance Between Blocks. The reduction of 0.30 mts. In the set back space is permissible on all sides, subject to availability of minimum 6.70 mts., for the buildings of within 30 mts. height. With increase in height above 30 mts. corresponding increase in setback to be insisted. 3. Height of the Building Increase in height of the building is permitted not exceeding 5% of the building height approved as long as such increase does not constitute an additional floor. In such cases, additional setback for the additional height increase shall be insisted on pro- rata basis. (For instance, for a 30 mts. height building with 5% increase in height the additional set back insisted will be 0.25 mts.) However, the total height should be within the height permitted by AAI / IAF. 4. FSI Tolerance Limit FSI Tolerance limit will be 0.03 of FSI or 50 Sq.mt., floor area whichever is higher over and above the permissible FSI. 5. Architectural projection & service ducts Service ducts upto 1.0 mt. here and there and not to the entire width and length of the building and Architectural projection upto 0.60m. in width where it is continuous and upto 1.0 mt. where it is dis- continuous are permissible, subject to availability of minimum clear set back of 6.70 mts. where required set back is 7.0 mts. and minimum clear set back of 7.70 mts. where required set back is 8.0 mts. and minimum set back of 8.70m. where required set back is 9.0 mts.and so on 6. OHT Change in the location/orientation permissible. In case of increase in the size of the OHT, development charges to be collected. 7. Inter connection between two flats Permissible as long as it satisfies parking requirement. 8. Change in the position of the columns and introduction of new columns in the stilt floor. Permissible as long as it does not affect driveway of minimum 3.00 mts. for vehicular movement and the no. of minimum parking lots required as per approved plan and left as car parking space . Movement and parking of required number of cars on ground can be taken irrespective of certain deviations from the approved plan, subject to conformity to TNCBR provision relating to Parking and Driveway. 9. Non FSI area Change in location of incidental use within non-FSI area permissible limit. 10. Variation between document dimension and site dimension If on site measurements are less than originally approved from PLR line, but even this lesser set backs on the site conform to these rules - Permissible. 216 TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY 11. Entrance Arch / Pillar As per the provision of these rules. 12. Pergola Permissible for elevation purpose in the terrace not exceeding 10% area of the respective floor. 13. Rain water harvesting Should be provided. 14. Compound Wall constructed including the land left for road widening. Not permissible. Permanent compound wall to be constructed as per the approved plan after leaving the Street Alignment / Road widening portion. However, the land left for road widening may be utilized for landscaping with temporary grill / barbed wire fencing, with or without Dwarf wall not exceeding 0.60 mts. height. 15. Fire license Compliance Certificate from DF&RS is required. 16. OSR land As the OSR space is vested with competent authority/ Local Body, no structure shall be constructed / erected on OSR land. 17. Structures permitted in the set back area Access steps to Ground floor and ramps, (without affecting ventilation of Basement Floor) closed Well, Water and Sewage Treatment Plant, Generator, Box type transformers are permitted in the set back area subject to availability of minimum set back of 6.7 mts. and satisfying the parking requirements. 18. Structures permitted in the Terrace Floor AC Plant and Two toilets in every block are permitted in the Terrace Floor. Architectural feature in the periphery on the top most floor (Terrace Floor) up to 3.00 mts. height is permissible subject to the condition that the portion constructed over allowable 1.5 mts. height parapet wall shall be non continuous with solid portion not exceeding 50% of the surface area. 19. Installation of Solar Energy System 1/3 rd area of the total terrace area to be reserved for erecting Solar Photo Voltaic Panels. The approximate space required for erecting Solar Voltaic Panel is 10 sq.mt for generating 1 KW of electricity. PRINTED  AND  PUBLISHED  BY  THE DIRECTOR  OF  STATIONERY  AND  PRINTING, CHENNAI ON  BEHALF  OF  THE  GOVERNMENT  OF  TAMIL  NADU HARMANDER SINGH, Principal Secretary to Government. TNCDBR 2019_Gazette_43_Ex_III_1a_04.02.2019.pdf 43_Ex_III_1a(Pages 1-192)19-2-19 43_Ex_III_1a-CTP-19-2-19 (193-216)

Previous and next

All provisions of Tamil Nadu Combined Development and Building Rules, 2019

Questions people ask

Is form V of Tamil Nadu Combined Development and Building Rules, 2019 still in force?

No repeal of Tamil Nadu Combined Development and Building Rules, 2019 is recorded.