Annexure III (C), UPERC (Rooftop Solar PV Grid Interactive Systems Gross/net Metering ) Regulations, 2019: ANNEXURE-III (C)
UPERC (Rooftop Solar PV Grid Interactive Systems Gross/net Metering ) Regulations, 2019 - Annexure III (C)
Text of annexure III (C)
ANNEXURE-III (C)
ANNEXURE-III (C)
Inter connection agreement (Net Billing / Net Feed-in Arrangement)
This Agreement is made and entered into at (location)…………. on this (date)
……………..................day of (month)……...year between
The Eligible Consumer / First Party / Third Party Owner by the
name of …………………………owning or leasing or having commerce rights to
the premises at (address) …………………………………………………….as first party /
Eligible Consumer.
AND
Distribution Licensee (herein after called as Licensee) and represented by ………………………
(Designation of office) and having its registered office at (address)
………………………….as second party of the agreement.
And whereas, the……….……….……….………. (Name of the Licensee) agrees to provide
grid connectivity to the eligible consumer for injection of the electricity generated from
his RSPV plant of capacity ……….. kW into the power system of Licensee and as per
conditions of this agreement and RSPV Regulations / Orders issued by the Uttar Pradesh
Electricity Regulatory Commission.
Both the parties hereby agree to as follows–
1. Eligibility–
1.1. Eligibility for Net Billing / Net Feed-in arrangement has been specified in the UPERC
(Rooftop Solar PV Grid Interactive System Gross / Net Metering) Regulations, 2019 (First
Amendment / Addendum) (hereinafter referred to as RSPV Regulations, 2019) (First
Amendment). Eligible consumer is required to be aware, in advance, of the standards and
conditions his system has to meet for being integrated into grid / distribution system for
net billing / net feed-in.
2. Technical and Interconnection Requirements–
2.1. The eligible consumer / First Party agrees that his Rooftop Solar PV generation plant and Net
Billing / net Feed-in system will conform to the standards and requirements specified in these
Regulations and in the following Regulations and codes as amended from time to time.
i. Central Electricity Authority (Technical Standards for connectivity of
the Distributed Generating Resources) Regulations, 2013 and subsequent
amendments thereof;
ii. Central Electricity Authority (Installation and Operation of Meters)
Regulation, 2006 and subsequent amendments thereof;
UPERC RSPV Regulations, 2019 (with amendments)
33
Uttar Pradesh Electricity Regulatory Commission
iii. Central Electricity Authority (Measures of Safety and Electricity Supply)
Regulations, 2010 and subsequent amendments thereof;
iv. UPERC Electricity Grid Code, 2007 and subsequent amendments thereof;
v. UPERC (Grant of Connectivity to intra-State Transmission System
Regulations, 2010 and subsequent amendments thereof to the extent specified in
the UPERC RSPV Regulations, 2019;
vi. UPERC Supply Code Regulations, 2005 and subsequent amendments thereof;
vii. Any other provisions applicable to the electricity consumer of the Distribution
Licensee.
2.2. Eligible consumer / First Party agrees that he has installed or will install, prior to connection
of Photovoltaic system to Licensee’s distribution system, an isolation device (both automatic
and inbuilt within inverter and external manual relays) and agrees for the Licensee to have
access to and operation of this, if required and for repair & maintenance of the distribution
system.
2.3. Eligible consumer / First Party agrees that in case of a power outage on Licensee’s system,
photovoltaic system will disconnect/isolate automatically and his plant will not inject power
into Licensee’s distribution system.
2.4. All the equipment connected to distribution system shall be compliant with relevant
International (IEEE / IEC) or Indian standards (BIS) and installations of electrical equipment
must comply with Central Electricity Authority (Measures of Safety and Electricity Supply)
Regulations, 2010.
2.5. Eligible consumer / First Party agrees that Licensee will specify the interface /
interconnection point and metering point.
2.6. Eligible consumer/First Party and Licensee agree to comply with the relevant CEA and
UPERC Regulations in respect of operation and maintenance of the plant, drawing and
diagrams, site responsibility schedule, harmonics, synchronization, voltage, frequency,
flicker etc.
2.7. Due to Licensee’s obligation to maintain a safe and reliable distribution system, eligible
consumer / First Party agrees that if it is determined by the Licensee that eligible
consumer’s photovoltaic system either causes damage to and / or produces adverse effects
affecting other consumers or Licensee’s assets, eligible consumer / First Party will have to
UPERC RSPV Regulations, 2019 (with amendments)
34
Uttar Pradesh Electricity Regulatory Commission
disconnect photovoltaic system immediately from the distribution system upon direction
from the Licensee and correct the problem at his own expense prior to a reconnection.
3. Clearances and Approvals–
3.1. The eligible consumer / First Party agrees to obtain all the necessary approvals and
clearances (environmental and grid connection related) before connecting the photovoltaic
system to the distribution system.
4. Access and Disconnection–
4.1. Licensee shall have access to metering equipment and disconnecting means of the
solar photovoltaic system, both automatic and manual, at all times.
4.2. In emergency or outage situation, where there I s no access to the disconnecting means,
both automatic and manual, such as a switch or breaker, Licensee may disconnect
service to the premises of the eligible consumer.
5. Liabilities–
5.1. Eligible consumer/First Party and Licensee will indemnify each other for damages or
adverse effects from either party’s negligence or intentional misconduct in the connection
and operation of photovoltaic system or Licensee’s distribution system.
5.2. Licensee and eligible consumer/First Party will not be liable to each other for any loss of
profits or revenues, business interruption losses, loss of contract or loss of goodwill, or for
indirect, consequential, incidental or special damages, including, but not limited to, punitive
or exemplary damages, whether any of the said liability, loss or damages arise in contract, or
otherwise.
5.3. Licensee shall not be liable for delivery or realization by eligible consumer / First
Party for any fiscal or other incentive provided by the Central/State Government beyond the
scope specified by the Commission in its relevant Order.
5.4. The Licensee may consider the quantum of electricity generation from the Rooftop
Solar PV system towards RPO.
6. Commercial Settlement–
6.1. All the commercial settlement under this agreement shall follow the RSPV
Regulations, 2019 (First Amendment) issued by the UPERC.
7. Connection Costs–
7.1. The eligible consumer / First Party shall bear all costs related to setting up of
photovoltaic system including metering and interconnection costs. The eligible consumer
UPERC RSPV Regulations, 2019 (with amendments)
35
Uttar Pradesh Electricity Regulatory Commission
agrees to pay the actual cost of modifications and upgrades to the service line required to
connect photovoltaic system to the grid in case it is required.
8. Termination–
8.1. The eligible consumer / First Party can terminate agreement at any time by providing
Licensee with 90 days prior notice.
8.2. Licensee has the right to terminate Agreement on 30 days prior written notice, if
eligible consumer / First Party commits breach of any of the term of this Agreement and
does not remedy the breach within 30 days of receiving written notice from Licensee of the
breach.
8.3. Eligible consumer / First Party shall upon termination this Agreement,
disconnect the photovoltaic system from Licensee’s distribution system in a timely manner
and to Licensee’s satisfaction.
In witness, where of, Mr. ……………………………………..…… for and on behalf of (Eligible
consumer) / (First Party) and Mr. ……………………………………….…… for and on behalf of
(Licensee) sign this agreement in two originals.
Eligible Consumer / First Party / Third Party Distribution Licensee
Name……………………………… Name……………………………
Address…………………………… Designation……………………..
Service connection no. Office Address………………….
By the Order of the Commission,
SANJAY KUMAR SINGH,
Secretary.
Previous and next
Questions people ask
Is annexure III (C) of UPERC (Rooftop Solar PV Grid Interactive Systems Gross/net Metering ) Regulations, 2019 still in force?
No repeal of UPERC (Rooftop Solar PV Grid Interactive Systems Gross/net Metering ) Regulations, 2019 is recorded.