Regulation 8, The Karnataka Installation of new Telecommunication Infrastructure Tower Regulations, 2019.: Basic requirements to erect Telecommunication Infrastructure Towers
The Karnataka Installation of new Telecommunication Infrastructure Tower Regulations, 2019. - Regulation 8
Text of regulation 8
Basic requirements to erect Telecommunication Infrastructure Towers
8. Basic requirements to erect Telecommunication Infrastructure Towers.- (i) Set Backs
of Room or Tower:
(a) The minimum setback for the accessory room or ground based tower shall be as required
under the approved zoning Regulations of Local Planning Areas subject to the condition that it shall
be a minimum of 3m all-round, after leaving the road widening portion if any. If it is roof top
installation, the tower shall have minimum 3m distance from the boundary of the building edge;
(b) In addition to the distance specified above, set back required for road widening proposed in
any of the Master Plan or Zonal Development Plan or Town Planning Scheme or Road Development
Plan or any other scheme sanctioned by the Government or Execution Authority shall also be
provided.
Provided that no portion of the telecommunication Infrastructure tower pole structure or
accessory room shall project or over hang into the neighbouring plots.
5
Provided further that additional distance from boundary abutting the road and other
boundaries of the plot proportionate to increase in height shall not be necessary for the
telecommunication Infrastructure tower or pole structures or accessory rooms or for the building
over which they are proposed.
(ii) Accessory rooms:
(a) Accessory rooms such as Equipment rooms, shelters or Generator rooms essential for the service
shall be permitted along with a telecommunication tower or telecommunication pole structures or
separately, if a request is made in the application and plans or drawings of the rooms are attached
either along with the application for permit or separately;
(b) The cabin may be made with any material but the area of such cabin shall not exceed 15 Square
Meters;
(c) Installation of electricity generator may be allowed if the generator is covered with insulated
sound-proof cabin;
(d) Every construction or installation of ancillary necessary for the telecommunication system shall
conform to the relevant rules applicable to such construction or installation and license or permit
required under such rules shall also be obtained.
(e) The telecommunication tower or ancillary structures shall not prevent or block the access, exit or
entry or reduce the width of such access, exit or entry of building or in no way badly affect the safety
measures or amenities provided in the building in which it is erected.
(iii) Sharing of Sites: The Telecom Operators may share the towers for fixing their respective
antennas. The same are however, required to adhere to the prescribed technical requirements, so as
to curtail multiplicity of towers as well as to optimize the use of the existing ones. As sharing of
antennas on a single tower increases the effects of EMR (Electromagnetic radiations) manifold the
height of the tower shall be increased.
(iv) Installations:
(a) In order to avoid any eventuality due to thunder storm, lightning conductors shall be
installed.
(b) Silent Generator set installed at the tower site to cater to the power requirements of the
antenna shall conform to the noise and emission norms as prescribed by the Karnataka
State Pollution Control Board.
(v) Protective Wall:
(a) Every tower erected on the ground and through which electric power is transmitted or passed
shall be provided with protective wall or grill at a distance of one meter from any point of the
base.
(b) The wall or grill shall have a minimum of 1.20m height and shall be kept under lock and key, if
provided with door.
(vi). Protection from lightning: Every telecommunication Infrastructure tower shall be provided
with sufficient protection against lightning, conforming to I.S. 2303-1969-Code of Practice, as
amended from time to time.
(vii). Warning lights:
(a) Every telecommunication tower shall be provided with two Aviation Warning Lights (ANL) each at
40m and 70m height from the ground level and one at the top, the two lights at 40m height shall be
fixed in one set of opposite corners and that at 70m height shall be fixed at the other set of opposite
corners.
(viii). Damage and liability: The applicant and owner shall be responsible for the structural
stability of the telecommunication Infrastructure tower and the building in which it is erected and
for any damage caused due to inadequate safety measures.
(ix). Building to be authorized: Erection of any telecommunication Infrastructure tower or pole
structures or accessory rooms shall be permitted only on buildings with valid permissions and
Occupancy Certificate obtained from the Local Body (not required in such cases where exemption
has been provided by the Local Body as per the provision of Act and Rules);
6
(x) Completion Certificate:
(a) After completion of the work of the telecommunication tower or pole structure and accessory
rooms as per permit, the applicant and the engineer shall submit to the Sanctioning Authority
completion certificate as in Appendix-A along with a certificate of structural safety or stability of the
tower and the building, if the tower or pole is constructed over a building.
(b) The Sanctioning Authority shall, if satisfied that the work has been completed as per permit,
issue use certificate as in Appendix-B allotting a number, on the basis of which the authorities
concerned shall allow power connection, etc. for use of the service.
(xi). Unauthorized Telecom Infrastructure Towers: The Sanctioning Authority shall take
necessary action on unauthorized Telecom Infrastructure Towers erected without valid permissions
or Completion Certificate, as per the Act provisions duly following the procedure.
Provided that the Radiation norms given by the Department of Telecommunications (DOT)
have to be strictly followed by all Tower Infrastructure Service Providers and limit the Power
Emissions or Radiations. All the complaints regarding radiation and radiation related technical
details are being dealt by Telecom Enforcement Resource and Monitoring (TERM) cell of Department
of Telecommunications (DOT) and any citizen can approach the concerned TERM Cell of Department
of Telecommunications (DOT) with regard to grievance on any issues relating to radiation.
Previous and next
Questions people ask
Is regulation 8 of the Karnataka Installation of new Telecommunication Infrastructure Tower Regulations, 2019. still in force?
No repeal of the Karnataka Installation of new Telecommunication Infrastructure Tower Regulations, 2019. is recorded.