Rule 11, Acquisition of Right of User in Land Rules, 2018: Right of entering for inspection etc
Acquisition of Right of User in Land Rules, 2018 - Rule 11
Text of rule 11
Right of entering for inspection etc
11. Right of entering for inspection etc.- (1) After handing over the possession of land
to the land owner / occupier, the Corporation who laid the Water, Gas or Drainage
Pipelines the persons authorized by the Corporation shall have the power to enter in the
land and do the work as found necessary for inspection, maintenance, repair, replacement
or removal of the Water, Gas or Drainage Pipelines.
(2) If the land owner or occupier refuses to sign any form, which he or she is required to
sign under these rules, the same shall be signed by the Completent Authority, provided
the procedure under these rules has been followed.
12. Cost of acquisition of right of user by requisitioning body
(1) The establishment charge and contingency cost for the right of user by requisitioning
body / corporation shall be 5 percent of the total value of compensation assessed under
rule 7.
(2) The requisitioning body / corporation shall deposit the establishment charge and the
contingency cost, as calculated under rule 12 (1) by way of bank draft to the Collector
and the Collector shall deposit the cost of user land in the Deposit account in the district
treasury or in a scheduled bank account maintained separately for this purpose to be
jointly operated by Competent Authority and Deputy Commissioner.
Previous and next
All provisions of Acquisition of Right of User in Land Rules, 2018