Rule 103, Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018: Responsibility for Technical Details
Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018 - Rule 103
Text of rule 103
Responsibility for Technical Details
103. Responsibility for Technical Details.- In a" cases the Municipal Engineer and
where there is no such engineer, the officer in principal charge of the municipal public
works, establishment shall be responsible for technical details of all estimates
signed-up by him. local inspection of the site be necessary as is generally the case in
regard to estimates of bridges and causeways, etc. such inspection must be
undertaken before the final detailed estimate is framed out. It will not generally be
possible for the Superintending Engineer or the Chief Engineer to inspect proposals
on the spot and ordinarily notes by these officers shall be confined to matters which
can be dealt with or without such inspection and which indicate points which should
be attended to on the site by the Municipal Engineer or where there is no Municipal
Engineer, then the officer in principal charge of municipal public works.
ll~~, ~ 13 3l%l 2018 900 (31)
Previous and next
All provisions of Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018
Questions people ask
Is rule 103 of Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018 still in force?
No repeal of Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018 is recorded.