Form 30, Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018: FORM -30
Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018 - Form 30
Text of form 30
FORM -30
FORM -30
AGREEMENT FORMAT
[Rule 105]
Municipality ..
----------Stamp·Paper ----------------
(Appropriate value)
An agreement made the , day of two
thousand and , between .
............ (hereafter called the "contractor") of the one part and the
Municipality (hereinafter called the "Council") of the other Part"
whereas the contractor has by tender dated , offered to provide, supply,
deliver, erect, construct, lay and maintain and all other works set out in
the schedule hereto, whereas the said tender has been accepted by the Chief Municipal
Officer/President.And whereas it is necessary that the contract so entered into shall be
embodied in a document in writing in the form hereinafter appearing:
Now, it is Agreed as follows:-
1. The contractor shall in accordance with the conditions set out below do execute
the works set out in the Schedule hereunder written in consideration of the .
payments therein set out.
2. The contract embodied in the document shall be in substitution for the contract
entered into by tender and acceptance as hereinbefore recited which contract
shall be deemed to be null and void in so far as it differs from the contract herein
contained:
Conditions
1. The work is to be carried on with due diligence and all works executed is to be
done in the most substantive and workman like manner. The materials used,
when supplied by the contractor are to be the best quality and in aUcasas are to
be subject to the approval of the Engineer/Sub-Engineer/Chief MunicipaI Officer
for the time being whose decision as to the rate of progress and quality of work of
materials shall be final.
900 (314) 11~ ~, ~ 13 .:wffif 2018
Appendix-I Forms 1To 48
3.
The quantity of work executed shall be measured and payments made on the
satisfactory completion of the work.
In the case of delay, bad work of material the supervising authority may remove
the same and have them replaced, deducting the value of the work rejected or
materials removed or the cost of replacing the same as it may think proper, from
any amount due or that may become due to the party making the tender.
The designs, drawings and instructions in writing relating to the work signed by
the Chief Municipal Officer/Engineer and lodged in his office for inspection during
office hours shall be strictly conformed to.
5. The President! the Chief Municipal Officer / the Engineer shall have power to
2.
4.
make any alterations in the original designs or instructions that may occur to him
to be necessary during the progress of work and such alterations shall be carried
out on the same condition as agreed to in respect of the main work within such
time as the President !the Chief Municipal Officer/the Engineer may in writing
when specifying the alterations direct. Extra work, if any, necessitated by such
alterations shall be paid for: ..
(a) at the rate already agreed to if it be of the same nature as specified in the
agreement;
(b) at the rates mentioned in the schedule of rates as may be applicable it is is
of a different nature and there be no rate agreed upon such work; and
(c) at the rates deemed to be reasonable by the sanctioning authority on an
analysis of the current market rates of labour and materials, if the extra
items are not included in the schedule of rates applicable to the
Municipality. Such alteration shall not invalidate the contract but the time for
completion of the work will be extended in the proportion that the extra work
bears to the original contract work.
6. If it shall appear to the Presidentlthe Chief Municipal Officer/the Engineer that any
work has been executed with unsound, imperfect or unskillful workmanship or with
materials of an inferior description. the contractor shall on demand in writing
forthwith rectify, remove or reconstruct in whole or in part, as the case may
require, without any additional charge; and in the event of his refusing to do so
within the period specified by the President/the Chief Municipal Officer/the
Engineer, as the case may be, or in the case of failure to remove from the site of
the work within a specified period any materials or articles which are considered of
unsound or inferior quality and are not in accordance with the terms of the
contract and to provide immediately suitable materials or articles in lieu of those
condemned, than damages shall be paid at the rate of one per cent on the
-40-
11~ ~, ~ 13 ~ 2018 900 (315)
amount of the estimate for every day not exceeding 10 days for failure to comply
with the written demand of the President/the Chief Municipal Officer/the En~ineer.
7. Should the sanctioning authority consider that the work although not executed in
strict accordance with the specification may be to stand it is empowered to pay for
the same at such reduced rates as it may fix but this proceeding is quite optional
on its part.
8. A deduction of 10per cent of value of work done to be made from the contractor's
bill in case the work is not completed within the time noted below.
The schedule above referred to
Name of No. of Class and Quantity Unit of Rate of Date of
Work Item Description of work to Calculation Payment Completion
of work be ,
executed
(1) (2) (3) (4) (5) (6) (7)
Dated this ..
Name and Signature of the contractor with date
Signature of the witness with date
BETWEEN
And
In Municipality
Name and Signature of the Chief Municipal
Officer of the Municipality with date
Signature of witness with date
900 (316)
Previous and next
All provisions of Madhya Pradesh Municipal Corporation (Accounts and Finance) Rules 2018