LawGrids logoLAWGRIDS.ORG

Form 1, Tamil Nadu Real Estate Regulatory Authority (General) Regulations, 2018: FORM 1

Tamil Nadu Real Estate Regulatory Authority (General) Regulations, 2018 - Form 1

Text of form 1

FORM 1

FORM 1 (See Regulation 7) ARCHITECT ’S CERTIFICATE (On Letter Head) (To be submitted at the time of Registration of Project and for withdrawal of Money from Designated Account) Date: To (Name & Address of Promoter). Subject: Certificate of percentage of Completion of Construction Work of _____No. of Building(s) _________ Block(s) of the _Phase of the Project (TNRERA Registration Number______________________) situated on the Survey no. / Plot no.____________demarcated by its boundaries (latitude and longitude of the end points)_____ to the North ____to the South ______ to the East to the West of Division _______________Village ____ Taluk ______District __PIN measuring sq.mts. area being developed by (Promoter’s Name) ______________. Sir, I/We________ have undertaken assignment as Architect of certifying percentage of Completion of Construction Work of the Building(s)/_________Block(s) of the______ Phase of the Project, situated on the Survey no./ Plot no. _______ of Division____ ___ Village ___ Taluk _____________District____________ P I N _ _ _ _ _ _ _ _ _ _ _ _ _ _ measuring ______________________ sq.mts. area being developed by (Promoter’s Name) ____as per the approved plan. 1. Following technical professionals are appointed by Owner/Promoter: (as applicable) (i) M/s./Thiru/Tmt._ as Engineer (ii) M/s./Thiru/Tmt._ as Structural Consultant (iii) M/s./Thiru/Tmt._ as MEP Consultant (iv) M/s./Thiru/Tmt._ as Site Supervisor/Clerk of Works Based on site inspection by undersigned on _____date and with respect to each of the Building/Block or of the plots as the case may be of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the percentage of work done for each of the building/Block of the Real Estate Project as registered vide number____ under TNRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table A and B. Table – A Building/Block Number (to be prepared separately for each Building/Block of the Project) Sl. No. Tasks/Activity Percentage of work done 1 Excavation 2 number of Basement(s) and Plinth 3 number of Podiums 4 Stilt Floor June 13, 2018] Tamil nadu government gazette 55 5 number of Slabs of Super Structure 6 Internal walls, Internal Plaster, Floorings within Flats/ Premises, Doors and Windows to each of the Flat/ Premises 7 Sanitary Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster,elevation, completion of terraces with waterproofing of the Building/Block/Tower. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Block/Tower, Compound Wall and all other requirements as may be required to obtain Completion Certificate. TABLE- B Internal & External Development Works in respect of the entire Registered Phase Sl.No. Common areas and Facilities Amenities Proposed (Yes/No) Percentage of Work Done Remarks 1 Internal Roads & Footpaths 2 Water Supply 3 Sewerage (chamber, lines, Septic Tank, STP) 4 Storm Water Drains 5 Landscaping & Tree Planting 6 Street Lighting 7 Community Buildings 8 Treatment and disposal of sewage and sullage water /STP 9 Solid Waste Management & Disposal 10 Water Conservation, Rain Water Harvesting , Percolating Well/Pit 56 Tamil nadu government gazette [Part III—Sec. 2 11 Energy Management 12 Fire Protection and Fire Safety Requirements 13 Electrical Meter Room, Sub‐station, Receiving Station 14 Others (Option to Add more) Yours Faithfully, Signature & Name (IN BLOCK LETTERS) with Stamp of Architect Council of Architects (CoA) Registration No. CA/ / Council of Architects (CoA) Registration valid till (Date) FORM – 2 (See Regulation 7) ENGINEER’ S CERTIFICATE (On Letter Head) (To be submitted at the time of Registration of Project and for withdrawal of Money from Designated Account – Project wise) Date: To (Name & Address of Promoter) Subject: Certificate of Cost Incurred for Development of (Project Name ) for Construction of building(s) Wing(s) of the phase or for the plotted project, as the case may be, (TNRERA Registration Number ) situated on the Plot n o . / Survey no./R.S. no./T.S. no., Block no., Village demarcated by its boundaries (latitude and longitude of the end points) to the North to the South to the East to the West of Village Taluk District PIN measuring sq.mts. area being developed by (Promoter) Ref: TNRERA Registration Number Sir, I/We have undertaken assignment of certifying Estimated Cost for the Real Estate Project proposed to be registered under TNRERA, being Building(s)/ Block(s) of the Phase or for the plots of the plotted project as the case may be, situated on the plot no./Survey no./ RS. no./TS. no. of Division Village Taluk District______PIN measuring sq.mts. area being developed by (Owner/Promoter). 1. Following technical professionals are appointed by Owner/Promoter: (as applicable) (i) M/s/Thiru/Tmt as Architect (ii) M/s/Thiru/Tmt as Structural Consultant (iii) M/s/Thiru/Tmt as MEP Consultant (iv) M/s/Thiru/Tmt as Quantity Surveyor* June 13, 2018] Tamil nadu government gazette 57 2. We have estimated the cost of the completion v to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawing/Plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by ______quantity Surveyor* appointed by Developer/Engineer and the site inspection carried out by us. 3. We estimate total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. _______(Total of Table A and B). The estimated total Cost of Project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining completion certificate for the building(s) from the Competent Authority under whose jurisdiction the aforesaid project is being implemented. 4. Based on site inspection by undersigned on date, the Estimated Cost Incurred till date is calculated at Rs. (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of total Estimated Cost. 5. The Balance Cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Completion Certificate from (Competent Authority) is estimated at Rs. (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below; TABLE – A Building/Block bearing Number or called (to be prepared separately for each Building / Block of the Real Estate Project) Sl. No. Particulars Amounts (in Rs.) 1 Total Estimated Cost of the building/block as on date of Registration is 2 Cost incurred as on 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be Incurred (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra Items as on ___ not included in the Estimated Cost (Table –C) 58 Tamil nadu government gazette [Part III—Sec. 2 TABLE – B Internal & External Development Works in Respect of the entire Registered Phase Sl. No. Particulars Amounts (in Rs.) 1 Total Estimated Cost of the Internal and External Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be incurred (Based on Estimated Cost) 5 Cost incurred on Additional/Extra Items as on __ not included in the Estimated Cost (Table –C) Yours Faithfully, Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer Local Body license no. if any Local Body License no. valid till (Date) *Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Completion Certificate. 2. (*) Quantity Survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Promoter, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Table –C List of Extra/Additional Items executed with Cost (Which were not part of the original Estimate of Total Cost) June 13, 2018] Tamil nadu government gazette 59

Previous and next

All provisions of Tamil Nadu Real Estate Regulatory Authority (General) Regulations, 2018

Questions people ask

Is form 1 of Tamil Nadu Real Estate Regulatory Authority (General) Regulations, 2018 still in force?

No repeal of Tamil Nadu Real Estate Regulatory Authority (General) Regulations, 2018 is recorded.