Regulation 41, Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018: Dispute Settlement
Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 - Regulation 41
Text of regulation 41
Dispute Settlement
41. Dispute Settlement—In case of any dispute in giving effect to these regulations,
the affected party may approach the State Commission with a proper application in
accordance with UPERC (Conduct of Business) Regulations, 2004 as amended from time to
time.
However, the disputes between the Generators and the QCA shall be settled at the
level of QCA, in accordance with the terms and conditions of the agreement between the
QCA and the Generators,
Whereas, the dispute between SLDC and the QCA shall be resolved as per the
provisions of Section 33(4) of the Electricity Act, 2003.
Annexure-I
Details of Wind/Solar generating stations connected to Pooling Station to be submitted by
the QCA / & Individual generator (if connected to other sub-station)
Source: Wind/Solar
Copy of agreement between QCA and the
generators connected to Pooling Station.
Total Installed Capacity of the generators
connected to the Pooling Station.
Total Number of Units with details
Physical location of Pooling Staticon.
Whether any PPA has been signed: (Y/N) If yes, then attach details.
Connectivity details Location /Voltage Level.
Metering details Meter No. 1.Main,
o 2.Check.
Connectivity Diagram (Please Enclose).
Static data As per attached sheet.
Contact details of the QCA Name:
Designation:
Number: Landline Number,
Mobile Number, Fax
Number,
E-Mail Address:
Contact details of the alternate person Name:
Designation:
Number: Landline Number,
Mobile Number, Fax
Number,
E-Mail Address:
Data to be submitted by the QCA for every RE Generator For Wind turbine generating plants
Sl.no Particulars
1 2
1 Type
2 Manufacturer
3 Make
4 Model
3 Capacity
6 Commissioned date
7 Hub height
8 Total height
9. RPM range
10 Rated wind speed
11 Performance Parameter
12 Rated electrical power at Rated wind speed
13 Cut in Speed
14 Cut out Speed
15 Survival speed (Max winds peed)
16 Ambient temperature for out of operation
17 Ambient temperature for in operation
18 Survival temperature
19 Low Voltage Ride through (LVRT) setting
20 High Voltage Ride Through (HVRT) setting
21 Lightning strength (KA& abcoulombs)
22 Noise power level (db)
23 Rotor
24 Hub type
25 Rotor Dia meter
26 Number of blades
27 Area swept by blades
28 Rated rotational speed
29 Rotational direction
30 Coning angle
31 Tilting angle
32 Design tip speed ratio
33 Blade
34 Length
35 Diameter
36 Material
37 Twist angle
38 Generator
39 Generator type
40 Generator no of poles
41 Generator speed
42 Winding type
43 Rated Gen. Voltage
44 Rated Gen. Frequency
45 Generator current
46 Rated temperature of generator
47 Generator cooling
48 Generator power factor
49 KW/MW @ Rated Wind speed
50 KW/MW @ peak continuous
51 Frequency converter
52 Filter generator side
53 Filter grid side
54 Transformer
55 Transformer capacity
56 Transformer cooling type
57 Voltage
58 Winding configuration
59 Weight
60 Rotor weight
61 Nacelle weight
62 Tower weight
63 Over speed protection
64 Design life
65 Design standard
66 Latitude
67 Longitude
68 COD details
69 Past Generation History from the COD to the date on which DAS facility
provided at UP SLDC/ RLDC, if applicable
70 Height above mean sea level
For Solar generating Plants Static data points:
1. Latitude.
2. Longitude.
3. Turbine Power Curve (in case of Solar Thermal based Plants).
4. Elevation and orientation angles of arraysor concentrators (In case of Solar Thermal
based Plants).
5. The generation capacity of the Generating Facility.
6. Height above mean sea level etc.
7. COD details.
8. Rated voltage.
9. Details of type of Mounting:(Tracking Technology if used, single axis or dual axis, auto or
manual).
10. Manufacturer and Model (of important components, such as turbine, concentrators,
inverter, cable, PV Module, transformer, cables). i
11. DC installed capacity.
12 Module Cell Technology.
13.1-V characteristic of the module.
14. Inverter rating at different temperature.
15.Inverter efficiency curve.
16.Transformer capacity & rating, evacuation voltage, distance form injection point.
Annexure-IT
Forecast and Schedule Data to be submitted by QCA
FORMAT: A (to be submitted a day in advance)
Installed Day Ahead
15 Min time block TIME Capacity (MW) Availability
(MW)
1 00:00-00:15
2 00:15-00:30
3 00:30-00:45 v
4 00:45-01:00
94
95
96
NOTE: The forecast should ideally factor forecasting errors. As such schedule should
ordinarily be same as forecast.
FORMAT:B (to be submitted on the day of actual generation, revision of availability and
schedule, if any,shall be done as per provisions of the relevant Regulations.
Revision No.
Current schedule Revised Available
15 Min time block TIME Capacity (MW) capacity (MW)
1 00:00-00:15
2 00:15-00:30
3 00:30-00:45
4 00:45-01:00
94
95
96
Annexure-III
Real-time Data Telemetry req ment (Suggested List)
Wind turbine generating plants :
1. Turbine Generation (MW/MVAR).
2. Wind speed (meter/second).
3. Generator status (on/off-line)-this is required for.calculation of
availability of the WTG.
4 Wind direction (degrees from true north).
5 Voltage (Volt).
6 Ambient air temperature (OC).
7 Barometric pressure (Pascal). +
8 Relative humidity (in percent).
9 Air density(kg/m3).
For Solargenerating Plants:
1. Solar Generation unit/Inverter-wise (MW and MVAR).
2. Voltage at inter connection point (Volt). ;
3. Generator/Inverter Status (on/off-line).
4 . Global horizontal irradiance (GHI)-Watt per meter square. .
5. Ambient temperature(oc).
6. Diffuse Irradiance-Watt per meter ;quare.
7. Direct Imadiance-Watt per meters quare.
8. Sun-rise and sun-set timings.
9. Cloud cover-(Okta).
10. Rain fall(mm).
11. Relative humidity (%). O ® N o w
12. Performance Ratio.
By the order of the Commission,
SANJAY KUMAR SINGH.
Secretary,
Previous and next
Questions people ask
Is regulation 41 of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 still in force?
No repeal of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 is recorded.