Regulation 41, Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018: Dispute Settlement

Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 - Regulation 41

Text of regulation 41

Dispute Settlement

41. Dispute Settlement—In case of any dispute in giving effect to these regulations, the affected party may approach the State Commission with a proper application in accordance with UPERC (Conduct of Business) Regulations, 2004 as amended from time to time. However, the disputes between the Generators and the QCA shall be settled at the level of QCA, in accordance with the terms and conditions of the agreement between the QCA and the Generators, Whereas, the dispute between SLDC and the QCA shall be resolved as per the provisions of Section 33(4) of the Electricity Act, 2003. Annexure-I Details of Wind/Solar generating stations connected to Pooling Station to be submitted by the QCA / & Individual generator (if connected to other sub-station) Source: Wind/Solar Copy of agreement between QCA and the generators connected to Pooling Station. Total Installed Capacity of the generators connected to the Pooling Station. Total Number of Units with details Physical location of Pooling Staticon. Whether any PPA has been signed: (Y/N) If yes, then attach details. Connectivity details Location /Voltage Level. Metering details Meter No. 1.Main, o 2.Check. Connectivity Diagram (Please Enclose). Static data As per attached sheet. Contact details of the QCA Name: Designation: Number: Landline Number, Mobile Number, Fax Number, E-Mail Address: Contact details of the alternate person Name: Designation: Number: Landline Number, Mobile Number, Fax Number, E-Mail Address: Data to be submitted by the QCA for every RE Generator For Wind turbine generating plants Sl.no Particulars 1 2 1 Type 2 Manufacturer 3 Make 4 Model 3 Capacity 6 Commissioned date 7 Hub height 8 Total height 9. RPM range 10 Rated wind speed 11 Performance Parameter 12 Rated electrical power at Rated wind speed 13 Cut in Speed 14 Cut out Speed 15 Survival speed (Max winds peed) 16 Ambient temperature for out of operation 17 Ambient temperature for in operation 18 Survival temperature 19 Low Voltage Ride through (LVRT) setting 20 High Voltage Ride Through (HVRT) setting 21 Lightning strength (KA& abcoulombs) 22 Noise power level (db) 23 Rotor 24 Hub type 25 Rotor Dia meter 26 Number of blades 27 Area swept by blades 28 Rated rotational speed 29 Rotational direction 30 Coning angle 31 Tilting angle 32 Design tip speed ratio 33 Blade 34 Length 35 Diameter 36 Material 37 Twist angle 38 Generator 39 Generator type 40 Generator no of poles 41 Generator speed 42 Winding type 43 Rated Gen. Voltage 44 Rated Gen. Frequency 45 Generator current 46 Rated temperature of generator 47 Generator cooling 48 Generator power factor 49 KW/MW @ Rated Wind speed 50 KW/MW @ peak continuous 51 Frequency converter 52 Filter generator side 53 Filter grid side 54 Transformer 55 Transformer capacity 56 Transformer cooling type 57 Voltage 58 Winding configuration 59 Weight 60 Rotor weight 61 Nacelle weight 62 Tower weight 63 Over speed protection 64 Design life 65 Design standard 66 Latitude 67 Longitude 68 COD details 69 Past Generation History from the COD to the date on which DAS facility provided at UP SLDC/ RLDC, if applicable 70 Height above mean sea level For Solar generating Plants Static data points: 1. Latitude. 2. Longitude. 3. Turbine Power Curve (in case of Solar Thermal based Plants). 4. Elevation and orientation angles of arraysor concentrators (In case of Solar Thermal based Plants). 5. The generation capacity of the Generating Facility. 6. Height above mean sea level etc. 7. COD details. 8. Rated voltage. 9. Details of type of Mounting:(Tracking Technology if used, single axis or dual axis, auto or manual). 10. Manufacturer and Model (of important components, such as turbine, concentrators, inverter, cable, PV Module, transformer, cables). i 11. DC installed capacity. 12 Module Cell Technology. 13.1-V characteristic of the module. 14. Inverter rating at different temperature. 15.Inverter efficiency curve. 16.Transformer capacity & rating, evacuation voltage, distance form injection point. Annexure-IT Forecast and Schedule Data to be submitted by QCA FORMAT: A (to be submitted a day in advance) Installed Day Ahead 15 Min time block TIME Capacity (MW) Availability (MW) 1 00:00-00:15 2 00:15-00:30 3 00:30-00:45 v 4 00:45-01:00 94 95 96 NOTE: The forecast should ideally factor forecasting errors. As such schedule should ordinarily be same as forecast. FORMAT:B (to be submitted on the day of actual generation, revision of availability and schedule, if any,shall be done as per provisions of the relevant Regulations. Revision No. Current schedule Revised Available 15 Min time block TIME Capacity (MW) capacity (MW) 1 00:00-00:15 2 00:15-00:30 3 00:30-00:45 4 00:45-01:00 94 95 96 Annexure-III Real-time Data Telemetry req ment (Suggested List) Wind turbine generating plants : 1. Turbine Generation (MW/MVAR). 2. Wind speed (meter/second). 3. Generator status (on/off-line)-this is required for.calculation of availability of the WTG. 4 Wind direction (degrees from true north). 5 Voltage (Volt). 6 Ambient air temperature (OC). 7 Barometric pressure (Pascal). + 8 Relative humidity (in percent). 9 Air density(kg/m3). For Solargenerating Plants: 1. Solar Generation unit/Inverter-wise (MW and MVAR). 2. Voltage at inter connection point (Volt). ; 3. Generator/Inverter Status (on/off-line). 4 . Global horizontal irradiance (GHI)-Watt per meter square. . 5. Ambient temperature(oc). 6. Diffuse Irradiance-Watt per meter ;quare. 7. Direct Imadiance-Watt per meters quare. 8. Sun-rise and sun-set timings. 9. Cloud cover-(Okta). 10. Rain fall(mm). 11. Relative humidity (%). O ® N o w 12. Performance Ratio. By the order of the Commission, SANJAY KUMAR SINGH. Secretary,

Previous and next

All provisions of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018

Questions people ask

Is regulation 41 of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 still in force?

No repeal of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 is recorded.