Regulation 3, Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018: Applicability of the Regulations
Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 - Regulation 3
Text of regulation 3
Applicability of the Regulations
3. Applicability of the Regulations—These Regulations shall apply to all Solar
(excluding roof top solar covered under UPERC RSPV Regulations) and Wind Energy
Generation plant in the State of Uttar Pradesh connected to the intra-State Transmission
System and having an installed capacity of 5 MW. or above. The Solar or Wind generation
plant of installed capacity of 5 MW or more, using the power generated for self-
consumption shall also be covered by these Regulations:
Provided that the charges payable for deviation from schedule by the Solar/Wind
generators, supplying power outside the State, shall be accounted for and settled in
accordance with the provisions of the Central Electricity Regulatory Commission (Deviation
Settlement Mechanism and related matters) Regulations, 2014 as amended from time to
time.
PART-2
ROLE OF QUALIFIED COORDINATING AGENCY (QCA)
4. The Qualified Coordinating Agency (QCA) as defined at Clause 2 (1) (q) shall be
nominated based on consensus and mutually agreed terms and conditions from amongst
the Solar/Wind generators. The registration of QCA with SLDC shall be in accordance with
the detailed procédure prescribed by the SLDC. SLDC shall submit the detailed procedure
with the Commission for approval within 45. days of promulgation of this Regulation. SLDC
shall place the detailed procedure on their website within next 7 days after the approval.
The QCA shall register themselves with SLDC within next 30 days. The Solar and Wind
generators shall also inform the State Commission to this effect.The QCA will act as agent of
the Wind/ Solar generators and have to follow the directions issued by SLDC as per Section
33(2) of the Electricity Act, 2003.QCA shall be the single point of contact with SLDC ‘on
behalf of its coordinated generator (s) connected to a pooling station for the following
purposes:
(1) Submit one-time details to the SLDC as per Annexure - 1.
(2) Provide schedules with periodic revisions as per these Regulatiohs on
behalf of all the Solar/Wind Generators connected to the pooling station as per
Annexure 2.
(3) For coordination with STU/SLDC and other agencies for metering, data
collection and its transmission and communication.
(4) Provide real time availability and generation data as per Annexure -3.
(5) Under take commercial settlements on behalf of the generators, of such
charges pertaining to generation deviations only including payments to the State
pool account through the concerned SLDC.
(6) Under take de-pooling of payments received on behalf of the generators
from the State Pool account and settling them with the individual generators in
accordance with these Regulations.
(7) Under take commercial settlement of any other charges on behalf of the
generators as mandated from time to time.
QCA shall be treated as an intra-State entity for the purpose of these Regulations.
5. Each pooling station having minimum combined installed capacity of 5 MW shall
have one QCA. However, in case a particular solar or wind generator having a capacity of 50
MW or more, then such generator shall act as a QCA provided that such generator is
connected alone to a pooling station.
Provided that in case only one generator is connected to a pooling station then such
generator will actas QCA.
6. Notwithstanding the appointment of a QCA, the onus of complying with the
relevant provisions of these Regulations shall remain’ that of the concerned Generators, and
the commercial and other arrangements between them and their QCA shall be governed by
their infer-se agreements or terms of engagement.
7. The Generators at a Pooling Sub-Station may appoint one amongst themselves or
any other entity as a QCA:
8. The QCA shall be appointed with the approval of at least 51% of the Generators at
a Pooling Sub- Station, in terms of their combined installed capacity.
9. The Generators shall satisfy themselves that the QCA is technically and financially
competent to undertake on their behalf the designated functions and discharge the
obligations specified in these Regulations.
10. The terms of engagement of the QCA shall-include provisions on the following
aspects:
(a) The respective roles and responsibilities of the QCA and Generators;
(b) The metering, billing and energy accounting arrangements;
(c) The modalities for recovery of Deviation Charges from the Generators
and their settlement, including the principles for de-pooling;
(d) The payment security mechanism and related provisions;
(e) The events of default and their mitigation.
11. Once generator has achieved COD as per UPERC CRE Regulations, QCA cannot
discriminate amongst the generators connected to Pooling Station.
FORECASTING AND SCHEDULING:
12. These Regulations provide methodology for day-ahead scheduling of Solar and
Wind energy generators which are connected to the State grid and the methodology of
handling deviations of such wind and solar energy generators. Appropriate meters shall be
provided by STU at the cost of generator/ QCA for energy accounting.
Telemetry/Communication system & Data Acquisition System as required by SLDC shall
also be provided by the generator concerned for transfer of information to the SLDC.
13. Forecasting shall be done by individual solar/wind generators connected to the
State Grid through the QCAs on their behalf, The SLDC shall also undertake forecasting of
Solar and Wind power that is expected to be injected into the State grid. The forecast by the
SLDC shall be with the objective of ensuring secure grid operation by planning for there
requisite balancing resources. The forecast by the QCA or Solar and Wind generator, as the
case may be, shall be generator centric. The QCA or solar and wind generators will have the
option of accepting the SLDC’s forecast for preparing its available capacity or providing
SLDC with available capacity based on their own forecast. The QCA shall coordinate the
aggregation of available capacities of all generators connected to a pooling station and
communicate it to the SLDC.
Provided that,"if the QCA opts to adopt the forecast of the SLDC, the consequences of any
error in such forecast which results in a deviation from scheduling shall be bdme by the
concerned Generators through their QCA.
Provided the existing Solar and Wind generators or QCA on their behalf shall
establish the forecasting tools for day-ahead forecasting and scheduling to be furnished to.
SLDC within three months from the date of coming into effect of these Regulations.
However, all the new Solar and Wind generators or QCA on their behalf shall establish
forecasting arrangements before commissioning of the plant and connecz‘ing to the State
Grid.
14, The QCA or the wind and solar generator shall submit available capacity on day-
ahead basis for each pooling station or each generating station, as the case may be. Day-
ahead scliedule shall contain wind or solar energy generation schedule at intervals of 15
minutes (time-block) fot the next day, starting from 00:00 hours of the day, and prepared
for all 96 time-blocks.
Provided that the wind and solar generators, as the case may be, having multiple
transaction under Power Purchase Agreement and intra-state and/or inter-state’Open
Access with a common interface meter shall submit available capacity with respect to such
approved capacities allocated and such capacities alone shall be treated as available
capacities (AVCs) for the purpose of transactions under this Regulation.
15. The schedule of Solar and Wind generators connected to the State grid
(excluding collective transactions) may be revised by giving advance notice to the SLDC.
Such revisions shall be effective from 4th time block, the first being the time-block in which
notice was given. There may be only one revision for each time slot of one and half hours
starting from 00:00 hours of a particular day. This will bé subjected to a maximum of 16
revisions during the day for wind generators and a maximum of 8 revisions during the day
for solar generators.
16. Any commercial impact on account of deviation from schedule shall be borne by
the wind and solar generator, either directly or transacted via the representing QCA.
17.Treatment for mis-declaration of Available Capacity:
(a) Any intentional mis-declaration of Available Capacity to the SLDC by
QCA/ generator for its own undue commercial gain or that of a Generator shall
constitute a breach of these Regulations.
(b) The QCA/generator shall be liable to pay a penalty of three times the
Deviation Charges that would have been applicable had the Available Capacity been
correctly declared.
(c) The amount of penalty shall be payable by the QCA to the State Deviation
Settlement Mechanism (DSM) Pool, through the SLDC.
(e) The SLDC may, after giving due notice and as stipulated in the Detailed
Procedure, cancel the registration of the QCA upon repeated events of mis-
declaration.
PART-3
METERING, TELEMETRY AND DATA COMMUNICATION
18. Wind and Solar generators covered under these Regulations shall be governed
by interface metering with a provision for recording and storing all the load survey and
billing parameters for every15-minute time block as specified in the CEA Regulations
governing metering. Monthly meter readings shall be forwarded to the SLDC in addition to
data acquisition through SCADA for energy accounting.
19. Data telemetry shall be adopted at the turbine/inverter or plant level as
considered appropriate by beginning and whenever there is any change. The data relating
to power system output & parameters as
20. A penalty will be imposed in case of failure of Generator/ QCA to provide data as
directed by * SLDC or error in the data provided as per the table below:
Percentage of unavailability/Error on day to
day basis.
Penalty
Less than 5%
15% to 10%
10% to 15%
15% and above
Nil
Rs. 200 per day per MW
Rs. 1000 per day per MW
Rs. 2,000 per day per MW
In case of failure of the generators/ QCA comply with the above timelines, penalty
of Rs. 25,000/~ per day will be levied.
21. The plan for data télemetry, communication requirement, formats of forecast
submission and other details in this regard shall be provided in the Detailed Procedure
prepared by SLDC.
22. The detailed procedure shall address the following aspects:
• The procedure and requirements, including the payment of fees and penalties for
the registration and de-registration of QCAs by the SLDC and payment security
mechanism.
• The information and data, and the formats, required by the SLDC from the QCAs and
to be provided by the SLDC to them.
• The mode and protocol of communication for exchange of information and data
between the QCAs and the SLDC.
• The guidelines for energy and deviation accounting of ‘Solar and Wind energy
transactions under the State energy accounting framework, with illustrative
examples, in accordance with the principles specified in these Regulations.
• The mechanism for monitoring compliance of the Forecasting and Scheduling Code
by the QCAs.
• The default conditions in the State Pool Settlement by QCAs and their treatment.
• Set out the protocol for communication and exchange of information between the
QCA and the SLDC, including with regard to the following aspects:
(a) Communication of the Day-ahead and Intra-day Schedule and any
revisions to the SLDC.
(b) Communication of the real-time generation at the Pooling Sub-station or
by the stand-alone Generator.
(c) Communication of Grid constraints and curtailments by the SLDC to the
QCA.
23. The detailed procedure shall be approved by the Commission.
PART-4
COMMERCIAL AND DEVIATION SETTLEMENT
24. The Deviation Settlement Mechanism (DSM) specified under these Regulations
shall be applicable to all Solar and Wind generators covered under these Regulations. and
connected to the State Grid/ Pooling Station.
25. The wind or solar generators connected to the State Grid/ Pooling Station and
selling power within the State shall be paid by the buyer as per actual energy supplied
irrespective of quantum of energy scheduled by it. However, the wind and solar generators
connected to the State Grid and selling power outside the State shall be paid by the buyer as
per scheduled generation.
26. Schedule given by SLDC to the QCA shall be used as reference for deviation
settlement.
27. The QCA shall undertake commercial. settlements related to deviations on behalf
of the generator(s) connected to the respective pooling station(s) on a monthly basis. Any
discrepancy communicated by the QCA within 15 days shall be corrected forthwith by the
SLDC after verification within next 15 days.
28. In the event of actual generation for sale or self consumption of power within
the State by a generating station or a pooling station, as the case may be, béing less or more
than the scheduled generation as per Clause 26 above, the deviation charges shall be
applicable for wind and solar generator or the QCA, as the case may be, as prescribed in
Table-I below:
Table-I: Deviation charges payable by Solar/Wind Generating Stations in case of
under/over injection to the State DSM Pool:
TABLE
Sl no. Absolute error in the 15-
minute time block 4
Deviation charges payable to
State DSM Pool
1
2
3
4
<=15%
>15% but <=25%
>25% but <=35%
>35%
Nil
(Nil for the short fall/excess
energy for absolute error
upto (15%) + (10% of the
fixed rate for balance energy
beyond . 15% and upto
25%).
(Nil for the shortfall/excess
energy for absolute error
upto (15%) + (10% of the
fixed rate for balance energy
beyond 15% and upto 25%)
+ (20% of the fixed rate for
balance energy beyond 25%
and upto 35%).
(Nil for the shortfall/excess
energy for absolute error
upto (15%) + (10% of the
fixed rate for balance energy
beyond 15% and upto 25%)
+ (20% of the fixed rate for
balance energy beyond 25%
and upto 35%) + (30% of the
fixed rate for balance energy
beyond 35%).
Provided that deviation charges for under or over injection by wind or solar
generator connected to the State Grid and selling power outside the State shall be accounted
for and settled in accordance with the provisions of the CERC (Deviation Settlement
Mechanism and Related Matters) Regulations, 2014 as amended from time to time.The
accounting for this purpose shall be done by the SLDC.
29. The QCA shall also de-pool the energy deviations as well as deviation charges to
each generator on the basis of the deviation of each generator or any other
methodology/criteria mutually agreed between QCA and generators.
30. Monthly accounts as mentioned above shall be prepared by the SLDC. The wind
and/or solar or QCA or SLDC, as the case may be shall separately account the deviations for
multiple transactions under PPA and/or intra-State and/or inter-State Open Access. B
31 The State Load Dispatch Centre shall maintain separate records and account of
time-block-wise schedules, actual generation and deviations for all pooling stations.
32. The QCA shall maintain separate records and account of time-block-wise
schedules, actual generation and deviations for all generators connected at the pooling
station.
33. The guidelines-in respect of payment mechanism, payment security, curtailment
and other matters incidental to these Regulations shall be as provided in the detailed
procedure provided by SLDC under Clause 22 of these Regulations.
34 The SLDC shall equip itself with the necessary- Information Technology (IT)-
enabled communication platform and software for communication between it and the QCA.
35. The QCA shall provide the IT-enabled communication software log-in details to enable
the SLDC to access live data of all Schedules and deviations and facilitate the timely billing
and payment of Deviation Charges.
36. The IT-enabled communication platform and software should enable the SLDC
and QCA to exchange information, including with regard to the following:
(a) Site characteristics and details of the ‘Wind Turbines, Solar Inverters, etc.;
(b) Schedules and generation handled by the QCA;
(c) Generator outages and their reasons;
(d) Deviation charges payable by/to the QCA. .
37. The methodology for deviation settlement for the State shall be as follows:
(a) The SLDC shall compute the absolute error as defined in Clause 2(1)(a), in
respect of each QCA for each Pooling Station, and shall accordingly determine the amounts
payable/receivable on account of the deviation charge in accordance with clause 28. ‘ :
(b) Any shortfall in the aggregate amount of deviation charge payable by Solar
and Wind Energy Generators shall be paid by the respective QCAs in proportion to their
deviation reflected. The SLDC shall compute the deviations from the Schedule, “determine
the deviation charges payable and bill the QCA accordingly.
The QCA shall pay the amount of deviation charges to the-SLDC, and collect it from the
concerned Generators in proportion to their actual generation.
The deviation charges shall be paid within ten days from the issue of the accounts and
billing by the SLDC, failing which a late payment surcharge amounting to 1.25% per month
shall be levied for the period of delay.
Any curtailment imposed on the energy injection for reliable and secure Grid Operation in
emergency situations shall be -communicated by the SLDC to the QCA through an IT-
enabled communication, and no deviation charges shall be payable for any consequent
deviations. In case of any curtailment planned and communicated by the' SLDC due to line
maintenance or other reasons in certain time blocks of a day, the QCA shall be responsible
for curtailing the generation at site and amending the Schedule accordingly, failing which
the SLDC shall revise the Schedule as required.
PART-5
MISCELLANEOUS
38. Power to Relax-The Commission may by general or special order, for reasons to
be recorded in writing, and after giving an opportunity of hearing to the parties likely to be
affected by grant of relaxation, may relax any of the provisions of these regulations on its
own motion or on an application made before it by an aggrieved person.
Previous and next
Questions people ask
Is regulation 3 of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 still in force?
No repeal of Uttar Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations 2018 is recorded.