Regulation 2, The Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018: Definitions and Interpretation
The Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 - Regulation 2
Text of regulation 2
Definitions and Interpretation
2. Definitions and Interpretation.—(1) In these regulations, unless the context otherwise
requires,—
(a) ‘Act’ means the Electricity Act, 2003 (36 of 2003);
(a) ‘Actual Drawal’ in a time-block means electricity drawn by a buyer, as
computed or projected appropriately, as described in more detail in regulation
5, on the basis of the energy recorded by the Interface meters and other
related data of losses;
(c) ‘Actual Injection’ in a time-block means electricity generated or supplied by
the seller, as the case by, as computed or projected appropriately, as
described in more detail in regulation 5, on the basis of the energy recorded
by the Interface meters and other related data of losses;
(d) ‘Area Load Despatch Centre’ or ‘ALDC’ means a Load Despatch to carry
out the operating directives of the SLDC and assist the SLDC for safe Centre
established by the distribution licensee operating in the State and integrated
operation of the concerned distribution network;
1
Published in the R.H.P. dated 25
th
October, 2018 at p. 5710-5727.
2 Compendium of HPERC Regulations, March 2021
1
[(da) 'Area Clearing Price (ACP)' means the price of a time block electricity contract
established on the Power Exchange after considering all valid purchase and sale
bids in particular area(s) after market splitting, i.e. dividing the market across
constrained transmission corridor(s), as established by NLDC pursuant to Central
Electricity Regulatory Commission (Deviation Settlement Mechanism and
Related Matters) Regulations, 2014 as amended from time to time;]
(e) ‘Beneficiary’ means the person purchasing electricity generated from a
generating station;
(f) ‘Buyer’ means a person, including beneficiary and distribution licensee
purchasing electricity through a transaction scheduled in accordance with the
relevant regulations, including those applicable for short-term open access,
medium-term open access and long-term access;
(g) ‘Central Commission’ means the Central Electricity Regulatory
Commissionreferred to in sub-section (1) of section 76 of the Act;
(h) ‘Commission’means the Himachal Pradesh Electricity Regulatory
Commission referred to in sub–section (1) of section 82 of the Act.
2
[(ha) 'Daily Base DSM' means the sum of charges for deviations, as per Regulation
7, for all time blocks in a day payable or receivable as the case may be,excluding
the additional charges under Regulation 9 and Regulation 9A;
(hb) 'Day Ahead Market (DAM)' means a market where physical delivery of
electricity occurs on the next day (T+1) of the date of transaction (T) and is
governed by the Central Electricity Regulatory Commission (Power Market)
Regulations, 2010 (as amended from time to time), the Rules and Bye-Laws of
the Power Exchanges as approved by the Central Commission;]
(i) ‘Deviation’ in a time-block for a seller means its total actual injection minus
its total scheduled generation and for a buyer means its total actual drawal
minus its total scheduled drawal;
(j) ‘Gaming’ in relation to these regulations, shall mean an intentional mis-
declaration of declared capacity by any seller or buyer in order to make an
undue commercial gain through a Charge for Deviations;
(k) ‘Grid Code’ means the Grid Code specified by the Commission under clause
of sub-section (1) of Section 86 of the Act;
(l) ‘Interface Meters’ means interface meters as defined by the Central
Electricity Authority under the Central Electricity Authority (Installation
and Operation of Meters)Regulations, 2006, as amended from time to
time, or any other meter as may be relevant in specific situation;
(m) ‘Intra-State Deviation Charges’ mean charges for deviation as specified by
these regulations;
(n) ‘Open Access Consumer’ means a consumer, trader, distribution licensee or
generating company who has been granted Open Access under relevant
regulations;
1
Add. clause “(da)” for vide not. No. HPERC/428 dated 29
th
June, 2019, published in R.H.P. dated 3
rd
July, 2019 at p. 3131-3137.
2 Add clauses “(ha & hb)” for vide not. No. HPERC/428 dated 29
th
June, 2019, published in R.H.P.
dated 3
rd
July, 2019 at p. 3131-3137.
Compendium of HPERC Regulations, March 2021 3
(o) ‘Open Access Regulations’ mean the Himachal Pradesh Electricity
Regulatory (Grant of Connectivity, Long-term and Medium-term intra-
State Open Access and Related Matters) Regulations, 2010 and the Himachal
Pradesh Electricity Regulatory Commission (Short Term Open Access)
Regulations, 2010;
(p) ‘Qualified Coordinating Agency (QCA)’ means the agency/licensee co-
ordinating on behalf of RE generators and other systems, if any, connected to
a pooling station. The QCA may be one of the generator/distribution
licensee or RE generator selling power to the distribution licensee or any
other mutually agreed agency for the following purposes, namely:—
coordinate for schedules with periodic revisions on behalf of all the RE
generations connected to the pooling station(s) or selling power to the
distribution licensee;
responsible for coordination with the STU/SLDC for metering, data
collection/ transmission, communication;
where applicable, undertake commercial settlement on behalf of the
generators of such charges pertaining to generation deviations only
including payments to the Regional/State Deviation Pool Accounts
through the SLDC; and
undertake de-pooling of payments received on behalf of the generators
from the State Deviation Pool Account and settling them with the
individual generators. The QCA shall be treated as a State Entity and shall
be registered with the SLDC.
(q) ‘Scheduled Generation’ at any time or for a time block or any period
meansschedule of generation in MW or MWh ex-bus given by the State Load
Despatch Centre;
(r) ‘Scheduled drawal’ at any time or for a time block or any period time block
means schedule of despatch in MW or MWh ex-bus given by the State Load
Despatch Centre;
(s) ‘Seller’ means a person, including a generating station and distribution
license, supplying electricity through a transaction scheduled in accordance
with the relevant regulations applicable for short-term open access, medium-
term open access and long-term open access;
1[(sa) 'Simple Average Area Clearing Price (SAACP)' means the simple average
area clearing price as discovered/computed on daily basis by the NLDC for the
day ahead market segment of the Power Exchange in accordance with the
provisions of Central ElectricityRegulatory Commission (Deviation Settlement
Mechanism and Related Matters) Regulations, 2014 amended from time to time
and thereafter posted by it on their website, which shall be automatically
applicable for the purpose of these regulations also;]
(t) ‘State Entity/Constituent’ means such a person who is in the SLDC control
area and whose metering and energy accounting is done at the State level
and as described in more detail in regulation 4 of these regulations;
1 Added clause “(sa)” for vide not. No. HPERC/428 dated 29
th
June, 2019, published in R.H.P. dated
3
rd
July, 2019 at p. 3131-3137.
4 Compendium of HPERC Regulations, March 2021
(u) ‘State Load Despatch Centre’ means the centre established under sub-
section (1) of section 31 of the Act;
(v) ‘State Grid’ means the Intra-State Transmission System/ network owned by
the State Transmission Utility (STU)/transmission licensee(s) and/or the
EHV/High Voltage Distribution System/ network owned by the distribution
licensee(s) within the State;
(w) ‘State Periphery’ or ‘HP Periphery’ means, except in situations which
may warrant any other treatment in specific cases, the interconnection point
of the transmission system of the STU with the transmission system of the
CTU; or with any other inter State transmission system not owned by any
State Entity; or with the generation bus-bar of the joint sector projects from
where power is supplied to the distribution licensee through the STU
system;
(x) ‘STU Periphery’ means the interconnection point between the transmission
system of the STU with the distribution system of the distribution licensee;
(y) ‘Time-block’ means a time block of 15 minutes, for which specified
electrical parameters and quantities are recorded by special energy meter,
with first time block starting at 00.00 hrs:
Provided that the Commission may revise the duration of time block to 5
minutes, or any other duration, from the date to be notified by it from time to
time;
1[(ya) 'Time Block DSM' means the charge for deviation, as per Regulation 7, for the
specific time block in a day payable or receivable as the case may be, excluding
the additional charges under Regulation 9 and Regulation 9A;]
(z) ‘Un-Requisitioned Surplus’ or ‘(URS)’ means the reserve capacity in a
generating station that has not been requisitioned and is available for
despatch, and is computed as the difference between the declared capacity of
the generating station and its total schedule under long-term, medium-term
and short-term transactions, as per the relevant regulations of the appropriate
Commission; and
(za) ‘Week’ means a period of seven continuous days beginning at 00 hrs of each
Monday or as reckoned by the NRPC for preparing weekly deviation
accounts.
(2) The words and expressions used in these regulations and not defined herein, but
defined in the Act or the regulations issued by the Commission, shall have the meanings
assigned to them in the Act or in such regulations issued by the Commission; the words and
expressions used herein but not specifically defined in these regulations or in the Act, but
defined under any law, passed by a competent Legislature and applicable to the electricity
industry in the State, shall have the meanings assigned to them in such law; the words and
expressions used herein, but not specifically defined in the regulations or in the Act or any
law passed by a competent Legislature, shall have the meanings as are generally assigned to
them in the electricity industry.
1 Added clause “(ya)” for vide not. No. HPERC/428 dated 29
th
June, 2019, published in R.H.P. dated
3
rd
July, 2019 at p. 3131-3137.
Compendium of HPERC Regulations, March 2021 5
Previous and next
Questions people ask
Is regulation 2 of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2018 is recorded.