LawGrids logoLAWGRIDS.ORG

Form P3, MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018: Form No:P3

MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 - Form P3

Text of form P3

Form No:P3

Form No:P3 Type of Accident Previous Year Current year (RE) No. of Accidents No. of Accidents Fatal Non Fatal Total Fatal Non Fatal Total Human - - Other, if any, (please specify) - - Total - - - - - - * Pertaining to Transmission Business Only, SLDC shall file separately 96 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of the Transmission Licensee Abstract of Outages due to feeder tripping Form No: P4 SNo. Detail Previous Years Current Years Ensuing Years N o . o f fe e d e rs N o . o f trip p in g s T o ta l D u ra tio n o f T rip p in g s (h rs .) A v e ra g e d u ra tio n o f in te rru p tio n p e r fe e d e r N o . o f fe e d e rs N o . o f trip p in g s T o ta l D u ra tio n o f T rip p in g s (h rs .) A v e ra g e d u ra tio n o f in te rru p tio n p e r fe e d e r N o . o f fe e d e rs N o . o f trip p in g s T o ta l D u ra tio n o f T rip p in g s (h rs .) A v e ra g e d u ra tio n o f in te rru p tio n p e r fe e d e r 1 Feeder voltage Level (400 KV) 2 Feeder voltage Level (220 KV) 3 Feeder voltage Level (132 KV) * Pertaining to Transmission Business Only, SLDC shall file separately 97 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Major System Disturbances Form No: P5 S. No. Disturbances Previous Years Current Years Ensuing Years Number Total Duration (Hrs.) Number Total Duration (Hrs.) Number Total Duration (Hrs.) A Disturbances when DISCOM supply has been effected for more than 1 hr. i Due to 400 kV transformer failures ii Due to 400 kV transmission line outage iii Due to 400 kV sub- station equipment (CT, CVT etc.) failure iv Due to 220 kV transformer failure v Due to 220 kV transmission line failure vi Due to 220 kV sub- station equipment (CT, CVT etc). failure vii Due to 132 kV transformer failure viii Due to 132 kV transmission line failure ix Due to 132 kV sub- station equipment (CT, CVT etc). failure B Estimated unserved energy due to such interruptions C Other Transmission disturbances when DISCOM supply has got effected i ii iii iv v * Pertaining to Transmission Business Only, SLDC shall file separately 98 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Frequency Variation Form No:P6 Sl. No. Frequency Previous Years Current Years Ensuing Years No. of Hours As percentage of total hours in the year (%) No. of Hours As percentage of total hours in the year (%) No. of Hours As percentage of total hours in the year (%) 1 Above 50.5 Hz 2 50.5 - 5.2 Hz 3 50.2 - 49.8 Hz 4 49.8 - 49.5 Hz 5 49.5 - 49.0 Hz 6 49.0 - 48.5 Hz 7 Below 48.5 Hz * Pertaining to Transmission Business Only, SLDC shall file separately 99 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Voltage Fluctuation Form No: P7 Name of Sub- Station Tran sfor mati on Cap acity Reacti ve Comp ensati on provi ded Previous Year Current Year Ensuing Years Time during which voltage in an year Time during which voltage in an year Time during which voltage in an year More than upper limit in %age Between upper & lower limit Less than lower limit in %age More than upper limit in %age Between upper & lower limit Less than lower limit in %age More than upper limit in %age Between upper & lower limit Less than lower limit in %age H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e H o u rs % a g e 400 kV level i ii iii iv 220 kV Level i ii iii iv 132 kV level i ii iii * Pertaining to Transmission Business Only, SLDC shall file separately Note: Upper Limit is 420KVrms and lower limit is 360KVrms in case of 400 kv level Upper Limit is 245KVrms and lower limit is 200KVrms in case of 220 kv level . Upper Limit is 145 kVrms and lower limit is 120 KV rms in case of 132 kv level 100 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Licensee wise Load shedding carried out during the year Form No: P8 S. No. Particulars NBPDCL SBPDCL Load shedding during the Year (In Hrs.) 1 On SLDC's instructions a To control excess drawal b To control equipment damage c Under force majeure conditions 2 Due to maintenance or outage of own network 3 Any other reason Total load shedding for the Year Details to be provided for previous two years, base year and for each year of control period. 101 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Details of Overloaded Feeders Form No:P9 S.No. Voltage Level No. of feeders Feeder length (ckt. Km.) No. of feeders overloaded Line length overloaded feeders (ckt. Km.) % number of Overloade d feeders in Area % length of overloade d feeders in Area Previous Year 1 400 KV 2 220 KV 3 132 KV Current Year 1 400 KV 2 220 KV 3 132 KV * Pertaining to Transmission Business Only, SLDC shall file separately Note: Equipment considered as overloaded if carrying more than 110% of rated load for average 1 hour per day. Details to be provided for previous two years, base year and for each year of control period. Signature of Petitioner 102 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission licensee Details of over loaded Transformers Form No.: P10 Sl. No. Rated Voltage Previous Years Current Years Ensuing Years R a te d C a p a c ity A c tu a l L o a d o n T ra n s fo rm e r % o f T ra n s fo rm e rs o v e r lo a d e d R a te d C a p a c ity A c tu a l L o a d o n T ra n s fo rm e r % o f T ra n s fo rm e rs o v e r lo a d e d R a te d C a p a c ity A c tu a l L o a d o n T ra n s fo rm e r % o f T ra n s fo rm e rs o v e r lo a d e d 1 400/220/33 KV Transformers Capacity i ii iii iv Total - - - - - - - - - 2 220/132/33KV Transformers Capacity i ii iii iv Total - - - - - - - - - 3 220/132KV Transformers * Pertaining to Transmission Business Only, SLDC shall file separately i ii iii iv Total - - - - - - - - - 4 132/33KV Transformers Capacity i ii iii iv Total - - - - - - - - - Note:- Details may be submitted Area wise (Circle wise). Signature of Petitioner 103 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Failure of Transformers Form No: P11 S. No. Transformation ratio Previous Years Current Years Ensuing Years T o ta l N o . o f T ra n s fo rm e rs N o . o f fa ilu re s T o ta l D u ra tio n o f fa ilu re (h rs .) T o ta l N o . o f T ra n s fo rm e rs N o . o f fa ilu re s T o ta l D u ra tio n o f fa ilu re (h rs .) N o . o f T ra n s fo rm e rs N o . o f fa ilu re s T o ta l D u ra tio n o f fa ilu re (h rs .) 1 400/220/33 KV Transformers Capacity i ii iii iv Total - - - - - - - - - 2 220/132/33KV Transformers Capacity i ii iii iv Total - - - - - - - - - 3 220/132KV Transformers * Pertaining to Transmission Business Only, SLDC shall file separately i ii iii iv Total - - - - - - - - - 4 132/33KV Transformers Capacity i ii iii iv Total - - - - - - - - - 104 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Key Ratios Form No: P12 S.No Particulars Previous Year Current Year Ensuing Years A Financial & Material Management 1 Annual capital expenditure/net book value 2 Total Transmission cost/Energy Transmitted 3 Employee cost as a percentage of total cost 4 Operating expenses / Revenue from Transmission of power 5 Cost of capital invested 6 Debt Service Coverage Ratio 7 Cost of total Stores Inventory/100 Km of transmission lines 9 Working Capital to Revenue from Transmission of power B HR Management 1 Energy Transmitted (MU) per Employee 2 Total line length/employee (Km.) 3 Connected Load per Employee (MVA) 4 Transmission Income per Employee 5 Training participation days per employee C Operational Performance 1 Unplanned outage/total outage (Fault breakdown / total outage) * Pertaining to Transmission Business Only, SLDC shall file separately Signature of Petitioner ———— PUBLISHED AND PRINTED BY THE SUPERINTENDENT, BIHAR SECRETARIAT PRESS, PATNA. Bihar Gazette (Extra) 803—571+400—Egazette Website: http://egazette.bih.nic.in

Previous and next

All provisions of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018

Questions people ask

Is form P3 of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 still in force?

No repeal of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 is recorded.