LawGrids logoLAWGRIDS.ORG

Form P1, MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018: Form No: P1

MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 - Form P1

Text of form P1

Form No: P1

Form No: P1 S.No. Details Previous Year Current Year Ensuing Years A Losses in 400 KV system 1 Total Energy delivered by Generating Stations and Inter State/Intra State tie-links at the interface points of the Intra State Transmission system 2 Energy Delivered to next (Lower) Voltage level of the Transmission System 3 Sum of all the energy delivered at this voltage level to the State Distribution System 4 Transmission loss in system (A1- A2-A3) 5 Transmission loss in (Transco) system (%) {A4/A1} x 100 B Losses in 220 KV system Previous Year Current Year Ensuing Years 1 Total Energy delivered by Generating Stations and Inter State/Intra State tie-links at the interface points of the Intra State Transmission system 2 Energy Delivered to next (Lower) Voltage level 3 Sum of all the energy delivered at this voltage level to the State Distribution System 4 Transmission loss in system (B1- B2-B3) 5 Transmission loss in (Transco) system (%) {B4/B1} x 100 C Loss Calculation at 132 KV Previous Year Current Year Ensuing Years FY (n-1) FY (n) FY (n+1) * Pertaining to Transmission Business Only, SLDC shall file separately 2 Energy Delivered to next (Lower) Voltage level 3 Sum of all the energy delivered at this voltage level to the State 93 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Distribution System 4 Transmission loss in system (C1- C2-C3) 5 Transmission loss in (Transco) system (%) {C4/C1} x 100 D Total Losses in the Transmission system Previous Year Current Year Ensuing Years 1 Total Energy delivered by Generating Stations and Inter State tie-links at the interface points of the Intra State Transmission system 2 Sum of all the energy delivered by the Transmission system in to the State Distribution System 3 Transmission loss in system (D1- D2) 4 Transmission loss in (Transco) system (%) {(D3/D1) x 100} Signature of Petitioner 94 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Energy Delivered by Transmission licensee to the Distribution Licensees/ Bulk consumers at interface points

Previous and next

All provisions of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018

Questions people ask

Is form P1 of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 still in force?

No repeal of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 is recorded.