Form F5, MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018: Form No:F5
MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 - Form F5
Text of form F5
Form No:F5
Form No:F5
Rs Crores
Particulars Previous Year Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved in
MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY (n+3)
1 Capital Cost
Foreign Component
Foreign Exchange rate
considered for the admitted cost
Domestic Component
IDC including Financing Charges
Capital cost admitted as on-------
(Give reference of the BERC
relevant Order with Petition No.
& Date )
2 Less : Capital
Expenditure(CWIP)
3 Less : User contributions and
Grants
-
-
-
4 Total Capital Cost admitted
5 Increase /Decrease due to
FERV
6 Capital Cost for Purposes of
ARR*
*Must be in agreement with the figures shown in Form No: F5 (page-2), otherwise a reconciliation
statement must be accompanied.
Note
1. Copy of approval letter should be enclosed. Deviation in capital cost and scope of work if any, must
be submitted in detailed.
2. Details of IDC & Financing Charges are to be furnished as per FORM- .
(g) Financial Package of Capital cost Admitted Rs. Crores
Particulars Capital Cost as
Approved
Capital Cost
Incurred
Capital cost
Admitted
Currency Amount Currency Amount Currency Amount
Loans
Loan-I
Loan-II
and so on
Total Loan
Equity
Foreign
Domestic
Total Equity
Total Capital cost
Debt : Equity Ratio
Provide details for True-up period, Current Year and each of ensuing years separately.
55
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Name of Transmission Licensee Form No: F5
(h) Capital Cost Estimates and Schedule of
commissioning for New Projects
Particulars Present Day Cost Completed Cost
Date of approval of the Capital cost estimates:
Price level of approved estimates As of End of
________
Qtr. Of the year
_________
As on Scheduled
COD of the Station
Foreign Exchange rate considered for the Capital
cost estimates
Capital Cost excluding IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Capital cost excluding IDC, FC, FERC & Hedging
Cost (Rs. crores)
IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Total IDC, FC, FERC & Hedging Cost (Rs. crores)
Rates, taxes & duties considered
Capital cost Including IDC, FC, FERC & Hedging Cost
Foreign Component, if any (In Million US $ or the
relevant Currency)
Domestic Component (Rs. crores)
Capital cost Including IDC, FC, FERC & Hedging
Cost (Rs. crores)
Schedule of Commissioning
((Scheduled DOC elementwise))
-------------------------
-------------------------
---------------------------
COD of last Unit/ Block
Note:
1. Copy of approval letter should be enclosed.
2. Details of Capital cost are to be furnished as per
Form F5-5 or Form 14(Additional Capitalization)
as
applicable.
3. Details of IDC & Financing Charges are to be
furnished as per Form 20
Signature of Petitioner
56 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee
(i) Break-up of Project Cost for Transmission System Form No: F5
Rs. Crores
No Break Down As per
original
estimates
Actual
capital
expenditure
( Opening )
Variation
(B-C)
Reasons
for
Variation
A B C D E
A Transmission Line
1 Preliminary works
1.1 Design & Engineering
1.2 Priliminary investigation,Right of way,
forest clearance, PTCC , general civil
works etc.
Total Preliminary works - -
2 Transmission Lines material
2.1 Towers Steel
2.2 Conductor
2.3 Earth Wire
2.4 Insulators
2.5 Hardware Fittings
2.6 Conductor & Earthwire accessories
2.7 Spares
2.8 Erection, Stringing & Civil works
including foundation
Total Transmission Line Materials - -
3 Taxes and Duties
3.1 Custom Duty
3.2 Other Taxes & Duties
* Pertaining to Transmission
Business Only, SLDC shall file
separately
- -
Total -Transmission lines - -
B. Substations
4 Preliminary works & land
4.1 Design & Engineering
4.2 Land
4.3 Site preparation
Total Preliminary works & land - -
5 Civil Works
5.1 Control Room & Office Building
including HVAC
5.2 Township & Colony
5.3 Roads and Drainage
5.4 Foundation for structures
5.5 Misc. civil works
Total Civil Works - -
6 Substation Equipments
6.1 Switchgear (CT,PT, Circuit Breaker,
Isolator etc)
57
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
6.2 Transformers
6.3 Compensating Equipment (Reactor,
SVCs etc)
6.4 Control , Relay & Protection Panel
6.5 PLCC
6.6 HVDC package
6.7 Bus Bars/ conductors/Insulators
6.8 Outdoor lighting
6.9 Emergency D.G. Set
6.1 Grounding System
6.1 Structure for switchyard
Total Substation Equipments - - -
7 Spares
8 Taxes and Duties
8.1 Custom Duty
8.2 Other Taxes & Duties
Total Taxes & Duties - -
Total (Sub-station) - - -
9 Construction and pre-
commissioning expenses
9.1 Site supervision & site admn.etc.
9.2 Tools and Plants
9.3 construction Insurance
Total Construction and pre
commissioning expenses
- - -
10 Overheads
10 Establishment
10 Audit & Accounts
10 Contingency
Total Overheads - - -
11 Total Cost - -
12 IDC, FC, FERV & Hedging Cost
12 Interest During Construction (IDC)
12 Financing Charges (FC)
12 Foreign Exchange Rate Variation
(FERV)
12 Hedging Cost
Total of IDC, FC, FERV & Hedging
Cost
- -
13 Capital Cost incl. IDC, FC, FERV &
Hedging Cost
- -
Note:
1. In case of time & Cost over run, a detailed note giving reasons of such time and cost
over run should be submitted clearly bring out the agency responsible and whether such
time & cost over run was beyond the control of the transmission licensee.
2. Above statement to be provided separately for each transmission line commissioned
during the ARR period
58 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee
(j) Break-up of Construction/ Supply/ Service packages Form No: F5
SL. Particulars 1 2 3 4 5 6 ----
1 Name/ No. of Construction / Supply /
Service Package (and Schemes/plan)
2 Scope of works1 (in line with head of
cost break-ups as applicable)
3 Whether awarded through ICB/DCB/
Departmentally/ Deposit Work
4 No. of bids received
5 Date of Award
6 Actual Date of Start of work
Original Scheduled date of Start of work
7 Actual date of Completion of Work
Original Scheduled date of Completion
of work
8 Value of Award2 in (Rs. Lakhs)
9 Firm or With Escalation in prices
10 Actual capital expenditure till the
completion or up to COD whichever is
earlier for work capitalized during the
period(Rs.Cr.)
- Taxes & Duties and IEDC (included in
above)
- IDC, FC, FERV & Hedging
Cost(included in above)
11 Actual capital expenditure till the end of
the period(Rs.Cr.) for Capital work
under progress
- Taxes & Duties and IEDC (included in
above)- IDC, FC, FERV & Hedging
Cost(included in above)
12 Actual capital expenditure already
capitalized in earlier years(Rs.Cr.)
- Taxes & Duties and IEDC (included in
above)
- IDC, FC, FERV & Hedging
Cost(included in above)
13 Sub -total (10+11+12)
Note:
1. Above statement to be provided separately for each work commissioned during the
period, work under progress and part capitalization done in earlier years.
2. Statement as Per Form F5-6 to be duly reconciled with corresponding Cost Break Up
to be provided as per Form F5-5 , for each transmission line commissioned
during the True-up, Review and ARR period
* Pertaining to Transmission Business Only, SLDC shall file separately
Signature of Petitioner
59
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Name of Transmission Licensee
(k) Statement of Additional Capitalization Form No: F5
Rs. Crores
No Year Work/ Equipment
proposed to be
added after COD
up to Cut off Date/
Beyond Cut off
Date
Amount
capitalised
and
Proposed to
be
capitalised
Justification Regulations
under which
covered
Admitted
Cost1
1
2
3
4
5
6
7
8
9
10
11
12
13
Note:
1 Fill the form in chronological order year wise along with detailed justification clearly bring out
the necessity and the benefits accruing to the beneficiaries.
2 In case initial spares are purchased alongwith any equipment, then the cost of such spares
should be indicated separately.
* Pertaining to Transmission Business Only, SLDC shall file separately
60 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee
(l) Statement of Capital Works in Progress Form No: F5
Rs. Crores
Particulars Previous Year Current
Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY
(n+3)
A a Opening Capital
Expenditure(CWIP)
b Amount of IDC, FC,
FERV & Hedging cost
included in a above
B a Addition/Adjustment in
Capital
Expenditure(CWIP)
during the period
b Amount of IDC, FC,
FERV & Hedging cost
included in a above
C a Capitalization/Transfer
to Gross Fixed asset
during the period
b Amount of IDC, FC,
FERV & Hedging cost
included in a above
D a Closing Capital
Expenditure(CWIP)
b Amount of IDC, FC,
FERV & Hedging cost
included in a above
* Pertaining to Transmission Business Only, SLDC shall file separately
61
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Previous and next
All provisions of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018
Questions people ask
Is form F5 of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 still in force?
No repeal of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 is recorded.