Form S2, MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018: Form No: S2
MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 - Form S2
Text of form S2
Form No: S2
Form No: S2
Rs Crores
Particulars Current
Year
(i. e. RE)
Ensuing
years (Projection)
FY
(n+1)
FY
(n+2)
FY
(n+3)
Assets
Non-current assets
-------
-------
-------
Current assets
-------
-------
-------
Total Assets
EQUITY AND LIABILITIES
Equity
-------
-------
-------
LIABILITIES
-------
-------
Total Equity and Liabilities
Signature of Petitioner
45
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Name of Transmission Licensee
Projected Cash Flow Statement Form No: S3
Rs Crores
Particulars Current
Year
(i. e. RE)
Ensuing
years (Projection)
FY
(n+1)
FY
(n+2)
FY
(n+3)
A Cash flows from operating activities
i Net (loss) / Profit
Adjustments For
ii ----------
iii ----------
iv ----------
B Net Cash flows from operating
activities
Cash Flow from Investing Activities
i ----------
ii ----------
iii ----------
C Net Cash used in Investing Activities
Cash Flow from Financing Activities
i ----------
ii ----------
iii ----------
Net Cash generated from Financing
Activities
D Total Cash generated/(lost)
E Cash & Cash Equivalents as at
beginning of the Financial Year
F Cash & Cash Equivalents as at end
of the Financial Year
Signature of Petitioner
46 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee
Annual Revenue Requirement Form No: F1
(Rs. Crores)
Particulars Previous Year Curren
t Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY
(n+3)
I. Energy Available (MU) 78700
II. Energy Transmitted/Wheeled
(MU)
75812
III. Loss % 3.67%
IV. Transmission Cost per unit
(Rs/U)
#REF!
V Total Transmission System
Capacity (in MW)
VI. Transmission Cost per MW
VII
.
Max Demand handled by the
transmission system (in MW)
A. Income from Transmission
Function
1 Receipts
a Transmission/Wheeling
Charges at current tariff rates
b Subsidy from Govt. (If any)
Total Receipts ( A)
B Expenditure
1 O&M Expenses
i Employee Expenses
ii R&M Expense
iii A&G Expense
iv. Share of Holding Company
47
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Expenses
Total O&M expenses (
i+ii+iii+iv)
0 0 0 0 0
2 Return on Equity
3 Depreciation
4 Interest and finance charges
on Loan Capital
Less: IDC, if any
5 Interest on Working Capital
6 Contribution towards
Contingency Reserve
7 Bad Debts
Total Expenditure ( B)
C Other Deductions
1 Income from other Business
2 Non tariff income
3 Revenue from Short Term
transmission charges
Total Other Deductions ( C)
D Net ARR for Transmission
Function ( B-C)
E Shortfall/Excess before
tariff revision impact (A-D)
F Tariff Revision Impact
G Shortfall/Excess after tariff
revision impact (E-F)
Note: The ARR of SLDC shall be filed separately by SLDC. Expenses will be net of
Expenditure capitalized.
Signature of Petitioner
48 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee Form No: F2
Allotted Transmission Capacity and Charges to be paid by Long Term Transmission
Customers
Allotted Transmission Capacity of Long Term Transmission Customers ( CL)
(In MW)
Particulars Previous Year Current
Year
(i. e. RE)
Ensuing
years (Projection)
Approved
in MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY
(n+3)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
i.
ii.
B Bulk Consumers/Long Term
Open Access Customers (If
any)
1
2
Sum of Total Alloted
Transmission Capacity to all
the long term Transmission
system customers (SCL)
Charges to be paid by Long Term Transmission Customers/month
Rs. Crore
A Distribution Licensees
1 North Bihar Power Distribution Company
Limited
#REF!
2 South Bihar Power Distribution
Company Limited
#REF!
3 Others #REF!
i.
ii.
B Bulk Consumers/Long Term Open
Access Consumers (If any)
1
2
Total
49
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Name of Transmission Licensee
Projection of Sales, Connected Load and Demand Form No: F3
A) Projection of sales (MU)
Particulars Previous Year Curre
nt
Year
(i. e.
RE)
Ensuing
years (Projection)
Approve
d in
MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY
(n+3)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
`-------
B Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL - - - - - -
B) Projection of Connected Load (in KW)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
`-----
B Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
TOTAL - - - - - -
C) Projection of Maximum or Peak Demand (in MW) (Unrestricted)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
`--
B Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL - - - - - -
50 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
D) Projection of Minimum Demand (in MW)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
`---
B Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL - - - - - -
E) Projection of Average Demand (in MW)
A Distribution Licensees
1 North Bihar Power Distribution
Company Limited
2 South Bihar Power Distribution
Company Limited
3 Others
`--
B Bulk Consumers/Long Term
Open Access Consumers (If
any)
1
2
TOTAL - - - - - -
Signature of Petitioner
51
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Name of Transmission Licensee
Revenue Form No: F4
At Current Tariff Rates Rs. Crores
Particulars Previous Year Current
Year
(i. e.
RE)
Ensuing
years (Projection)
Approved
in
MYT/RE
Actual FY
(n+1)
FY
(n+2)
FY
(n+3)
A Distribution Licensees
1 North Bihar Power
Distribution Company
Limited
2 South Bihar Power
Distribution Company
Limited
3 Others
i.
ii.
TOTAL - - - - - -
B Bulk Consumers/Long
Term Open Access
Consumers (If any)
1
2
TOTAL - - - - - -
Grand Total - - - - - -
At Proposed Tariff Rates
Ensuing
years (Projection)
FY (n+1) FY (n+2) FY (n+3)
A Distribution Licensees
1 North Bihar Power Distribution Company
Limited
South Bihar Power Distribution Company
Limited
3 Others
i.
ii.
TOTAL
B Bulk Consumers/Long Term Open
Access Consumers (If any)
1
2
TOTAL
Grand Total
Less Tariff at Current Rates -
Impact of Tariff Revision
52 BIHAR GAZETTE (EXTRA) 17TH JULY 2018
Name of Transmission Licensee
(a) Details of Transmission Lines and Substations Form No: F5
Transmission Lines
No Name
of line
Type of line
AC/ HVDC
S/C or
D/C
No. of Sub-
conductors
Voltage
level kV
Line
length
Ckt.-Km.
Date of
Commercial
operation
/Put in use
1
2
-
-
(b) Substations
No Name
of Sub-
station
Type of
Substation
Convention
al / GIS
Voltag
e level
kV
No. of
transform
ers /
Reactors/
SVC etc
(with
capacity)
No. of
Bays
Date of
Commer
cial
operatio
n /Put in
use
Covered in
this petition
(Yes/No)
1
2
-
*Note:- Information to be provided for Previous Year, Current Year & Ensuing Control
Period
(c) Details of Installed Transformer at Substation
Sl.No Voltage Ratio of
Transformer (kV/kV)
Details of Transformers
Total number Total Capacity (MVA)
1 400/220
2 400/132
3 220/132
4 220/33
132/33
Note: Information required for Previous years, current year and Ensuing years
53
BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018
Previous and next
All provisions of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018
Questions people ask
Is form S2 of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 still in force?
No repeal of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 is recorded.