LawGrids logoLAWGRIDS.ORG

Form S2, MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018: Form No: S2

MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 - Form S2

Text of form S2

Form No: S2

Form No: S2 Rs Crores Particulars Current Year (i. e. RE) Ensuing years (Projection) FY (n+1) FY (n+2) FY (n+3) Assets Non-current assets ------- ------- ------- Current assets ------- ------- ------- Total Assets EQUITY AND LIABILITIES Equity ------- ------- ------- LIABILITIES ------- ------- Total Equity and Liabilities Signature of Petitioner 45 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Projected Cash Flow Statement Form No: S3 Rs Crores Particulars Current Year (i. e. RE) Ensuing years (Projection) FY (n+1) FY (n+2) FY (n+3) A Cash flows from operating activities i Net (loss) / Profit Adjustments For ii ---------- iii ---------- iv ---------- B Net Cash flows from operating activities Cash Flow from Investing Activities i ---------- ii ---------- iii ---------- C Net Cash used in Investing Activities Cash Flow from Financing Activities i ---------- ii ---------- iii ---------- Net Cash generated from Financing Activities D Total Cash generated/(lost) E Cash & Cash Equivalents as at beginning of the Financial Year F Cash & Cash Equivalents as at end of the Financial Year Signature of Petitioner 46 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Annual Revenue Requirement Form No: F1 (Rs. Crores) Particulars Previous Year Curren t Year (i. e. RE) Ensuing years (Projection) Approved in MYT/RE Actual FY (n+1) FY (n+2) FY (n+3) I. Energy Available (MU) 78700 II. Energy Transmitted/Wheeled (MU) 75812 III. Loss % 3.67% IV. Transmission Cost per unit (Rs/U) #REF! V Total Transmission System Capacity (in MW) VI. Transmission Cost per MW VII . Max Demand handled by the transmission system (in MW) A. Income from Transmission Function 1 Receipts a Transmission/Wheeling Charges at current tariff rates b Subsidy from Govt. (If any) Total Receipts ( A) B Expenditure 1 O&M Expenses i Employee Expenses ii R&M Expense iii A&G Expense iv. Share of Holding Company 47 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Expenses Total O&M expenses ( i+ii+iii+iv) 0 0 0 0 0 2 Return on Equity 3 Depreciation 4 Interest and finance charges on Loan Capital Less: IDC, if any 5 Interest on Working Capital 6 Contribution towards Contingency Reserve 7 Bad Debts Total Expenditure ( B) C Other Deductions 1 Income from other Business 2 Non tariff income 3 Revenue from Short Term transmission charges Total Other Deductions ( C) D Net ARR for Transmission Function ( B-C) E Shortfall/Excess before tariff revision impact (A-D) F Tariff Revision Impact G Shortfall/Excess after tariff revision impact (E-F) Note: The ARR of SLDC shall be filed separately by SLDC. Expenses will be net of Expenditure capitalized. Signature of Petitioner 48 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee Form No: F2 Allotted Transmission Capacity and Charges to be paid by Long Term Transmission Customers Allotted Transmission Capacity of Long Term Transmission Customers ( CL) (In MW) Particulars Previous Year Current Year (i. e. RE) Ensuing years (Projection) Approved in MYT/RE Actual FY (n+1) FY (n+2) FY (n+3) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others i. ii. B Bulk Consumers/Long Term Open Access Customers (If any) 1 2 Sum of Total Alloted Transmission Capacity to all the long term Transmission system customers (SCL) Charges to be paid by Long Term Transmission Customers/month Rs. Crore A Distribution Licensees 1 North Bihar Power Distribution Company Limited #REF! 2 South Bihar Power Distribution Company Limited #REF! 3 Others #REF! i. ii. B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 Total 49 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Projection of Sales, Connected Load and Demand Form No: F3 A) Projection of sales (MU) Particulars Previous Year Curre nt Year (i. e. RE) Ensuing years (Projection) Approve d in MYT/RE Actual FY (n+1) FY (n+2) FY (n+3) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others `------- B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL - - - - - - B) Projection of Connected Load (in KW) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others `----- B Bulk Consumers/Long Term Open Access Consumers (If any) 1 TOTAL - - - - - - C) Projection of Maximum or Peak Demand (in MW) (Unrestricted) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others `-- B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL - - - - - - 50 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 D) Projection of Minimum Demand (in MW) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others `--- B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL - - - - - - E) Projection of Average Demand (in MW) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others `-- B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL - - - - - - Signature of Petitioner 51 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018 Name of Transmission Licensee Revenue Form No: F4 At Current Tariff Rates Rs. Crores Particulars Previous Year Current Year (i. e. RE) Ensuing years (Projection) Approved in MYT/RE Actual FY (n+1) FY (n+2) FY (n+3) A Distribution Licensees 1 North Bihar Power Distribution Company Limited 2 South Bihar Power Distribution Company Limited 3 Others i. ii. TOTAL - - - - - - B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL - - - - - - Grand Total - - - - - - At Proposed Tariff Rates Ensuing years (Projection) FY (n+1) FY (n+2) FY (n+3) A Distribution Licensees 1 North Bihar Power Distribution Company Limited South Bihar Power Distribution Company Limited 3 Others i. ii. TOTAL B Bulk Consumers/Long Term Open Access Consumers (If any) 1 2 TOTAL Grand Total Less Tariff at Current Rates - Impact of Tariff Revision 52 BIHAR GAZETTE (EXTRA) 17TH JULY 2018 Name of Transmission Licensee (a) Details of Transmission Lines and Substations Form No: F5 Transmission Lines No Name of line Type of line AC/ HVDC S/C or D/C No. of Sub- conductors Voltage level kV Line length Ckt.-Km. Date of Commercial operation /Put in use 1 2 - - (b) Substations No Name of Sub- station Type of Substation Convention al / GIS Voltag e level kV No. of transform ers / Reactors/ SVC etc (with capacity) No. of Bays Date of Commer cial operatio n /Put in use Covered in this petition (Yes/No) 1 2 - *Note:- Information to be provided for Previous Year, Current Year & Ensuing Control Period (c) Details of Installed Transformer at Substation Sl.No Voltage Ratio of Transformer (kV/kV) Details of Transformers Total number Total Capacity (MVA) 1 400/220 2 400/132 3 220/132 4 220/33 132/33 Note: Information required for Previous years, current year and Ensuing years 53 BIHAR GAZETTE (EXTRA), 28TH AUGUST 2018

Previous and next

All provisions of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018

Questions people ask

Is form S2 of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 still in force?

No repeal of MULTI YEAR TRANSMISSION TARIFF AND SLDC CHARGES REGULATIONS, 2018 is recorded.