Regulation 11, Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018: Eligibility to Participate under Renewable Energy Certificate Mechanism
Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018 - Regulation 11
Text of regulation 11
Eligibility to Participate under Renewable Energy Certificate Mechanism
11. Eligibility to Participate under Renewable Energy Certificate
Mechanism.—The issuance of renewable energy certificate shall be as
per the eligibility criteria specified under Central Electricity Regulatory
Commission (Terms and Conditions for recognition and issuance of
Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010 and subsequent amendments thereof;
12. Metering Arrangement
12.1 The metering system shall be as per the provisions of CEA (Installation &
operation of meters) Regulations, 2006, CEA (Measures relating to Safety
and electricity supply) Regulations, 2010 and CEA (technical standards
for Connectivity of the distributed generation resources), Regulations,
2013 as amended from time to time and in compliance with the norms
fixed by BERC/CERC from time to time.
12.2 The eligible consumer shall install Net/Gross Meter at the
interconnection point of the eligible consumer with the network of
distribution licensee. The eligible consumer shall also install solar meter
at the delivery point of the solar energy system to measure the solar
energy generated.
12.3 Check meters shall be mandatory for rooftop solar systems having
capacity more than 20 kW. For installations size of less than and equal
to 20 kW, the solar Check meters would be optional.
12.4 The Meter shall be tested, installed and sealed in accordance with the
provisions of CEA (Installation and operation of Meters) Regulations,
2006 as amended from time to time and provisions under Bihar
Electricity Supply Code, 2007 or any other relevant regulations in force.
It shall be jointly inspected and sealed by the licensee on behalf of both
the parties. It shall be tested by the licensee and installed in presence of
eligible consumer and the licensee with due acknowledgement.
Provided that the eligible consumer shall follow the metering
specifications, provisions for placement of meter as developed by the
distribution licensee from time to time and as per the Bihar Electricity
Supply Code, 2007 or any other relevant regulations in force.
Provided further that in case the eligible consumer is under the
ambit of Time of Day tariff, meters compliant of recording time of day
consumption/generation shall be employed.
12.5 The meter reading, both net/gross meter and solar meter shall be taken
by the distribution licensee and shall form the basis of commercial
settlement. The copy of the meter reading statement shall be handed
over to consumer as soon as meter reading is taken.
8 BIHAR GAZETTE (EXTRA) 3RD APRIL 2018
Previous and next
Questions people ask
Is regulation 11 of Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018 still in force?
No repeal of Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018 is recorded.