Section 31, The Tripura Infrastructure Investment Fund Act,2018
The Tripura Infrastructure Investment Fund Act,2018 (6 of 2018) - Section 31
Text of section 31
31. Modification of the Scheme.
(a) The Government may, by notification in the Gazette, add to, amend or vary
the scheme either prospectively or retrospectively;
(b) Every notification under sub-section (a) shall be laid, as soon as may be
after it is issued, before the Legislative Assembly while it is in session for a
total period of fourteen days which may be in one session or in two
successive sessions, and if, before the expiry of the session in which it is so
laid or the session immediately following, the Legislative Assembly agrees in
making any modification in the notification or decides that the notification
should not be issued, the notification, shall thereafter have effect only in
such modified form or be of no effect, as the case may be, so however that
any such modification or annulment shall be without prejudice to the validity
of anything previously done under that notification.
23
Tripura Gazette, Extraordinary Issue, July 24, 2018 A. D.
First Schedule
[“See Sections 2(d), 3(f), 9(k), 9(o), 14(d)(i), 14(f), 14(j)”]
Matter for which provisions may be made in the scheme
(1) Eligibility of undertakings for assistance
(2) The purposes for which the assistance may be given
(3) Modes of assistance
(4) Interest and penal charges
(5) Security for the assistance
(6) Appraisal and sanction procedure
(7) Disbursement procedure
(8) Guidelines for memorandum of understanding/performance Contract
(9) Recovery procedure
(10) Monitoring system
(11) Investment of surplus funds
(12) Board meetings, fees and allowances to members of the Board
(13) The method of keeping accounts shall be kept, the preparation of the
budget, the audit of accounts and the submission of reports to the
Government
(14) The procedure for defraying the expenditure incurred in the
administration.
(15) Other information with respect to which a detailed study of the project
may be conducted after the decision for preliminary investment.
(16) Other information with respect to which feasibility study may be
conducted.
(17) Other powers and functions of the Board.
(18) Manner of investing surplus fund of the Board.
(19) Value for Money Test.
(20) The form and manner of publishing the details of proposed projects by
the sponsoring agency, the period in which the report shall be prepared
and submitted to the Board by the sponsoring agency in respect of the
project.
(21) Websites in which details of the project to be published.
24
Tripura Gazette, Extraordinary Issue, July 24, 2018 A. D.
Second Schedule
[See Section 2 (l)]
SECTORS
1. Agriculture Infrastructure,
2. Buildings,
3. Development of Minor Minerals,
4. Drinking and Industrial Water supply systems, Desalination Plants,
5. Education related Infrastructure,
6. Fisheries,
7. Gas and Gas Works,
8. Health Infrastructure,
9. Housing including Slum Development and Development of Satellite,
towns,
10. Industrial Estates including Industrial Parks and Special Economic Zones,
11. Information and Communication Technology related Projects,
12. Inland Navigation and Inland Waterways,
13. Irrigation including Dams, Irrigation Structures, Canals,
14. Land Reclamation Projects,
15. Ports and Harbours,
16. Power Generation, Transmission and Distribution,
l7. Roads, Bridges, including Rail over and under Bridges and By-passes,
18. Solid Waste Management,
19. Sports and Recreation Infrastructure,
20. Tourism and Hospitality Projects,
21. Transport projects including road, rail and air transport,
22. Urban Transportation System, Bus terminals. Multi-level parking facilities,
23. Waste Water, Sewerage treatment systems.
25
Tripura Gazette, Extraordinary Issue, July 24, 2018 A. D.
Third Schedule
[See Section 14(k)(iii)]
NATURE OF CONCESSION AGREEMENTS
1. Investment or Financing related Agreements
(i) Build-Operate-Transfer (BOT)- A contractual arrangement whereby the
concessionaire undertakes the construction, including financing, of a given
infrastructure facility, and the operation and maintenance thereof. The
concessionaire operates the facility over a fixed term during which they are
allowed to charge the users appropriate tolls, fees, rentals and charges as
incorporated in the contract to enable the recovery of investment in the Project.
The concessionaire transfers the facility to the Government at the end of the
fixed term that shall be specified in the Concession agreement.
(ii) Build-Own-operate (BOO)- A contractual arrangement whereby the
concessionaire is authorized to finance, construct, own, operate and maintain an
infrastructure or development facility from which the concessionaire is allowed
to recover the total investment by collecting user levies from facility users. The
ownership of the land will be vested with the Government. Under this mode, the
concessionaire owns the assets of the facility and may choose to assign its
operation and maintenance to a facility operator. The transfer of the facility to
the Government is not envisaged in this structure; however, the Government
may terminate its obligations after the specified time period.
(iii) Build-Own-Operate-Transfer (BOOT)- A contractual arrangement whereby
the concessionaire is authorized to finance, construct, maintain and operate a
Project and whereby such Project is to vest in the concessionaire for a specified
period. During the operation period, the concessionaire will be permitted to
charge user levies specified in the Concession agreement, to recover the
26
Tripura Gazette, Extraordinary Issue, July 24, 2018 A. D.
investment made in the Project. The concessionaire is liable to transfer the
Project to the Government after the expiry of the specified period of operation.
(iv) Build-Transfer-Operate (BTO)- A contractual arrangement whereby the
Government contracts out an infrastructure facility to the concessionaire to
construct the facility on a tum-key basis, assuming cost overruns, delays and
specified performance risks. Once the facility is commissioned satisfactorily, the
concessionaire is given the right to operate the facility and collect user levies
specified in the Concession agreement. The title of the facilities always vests
with the Government in this arrangement.
(v) Design-Build-Finance-Operate-Transfer (DBFOT)- A contractual arrangement
whereby the concessionaire is bestowed with the responsibility of designing,
building, financing and operating the facility before transferring the Project to
the Government after the expiry of the specified period. The concessionaire
operates the facility over a fixed term during which they are allowed to charge
the users appropriate tolls, fees, rentals and charges as incorporated in the
contract to enable the recovery of investment in the Project.
2. Operations and Maintenance related Agreements
(i) Management Agreement- A contractual arrangement whereby the
Government entrusts the operation and management of a Project to the
concessionaire for the period specified in the agreement on payment of
specified consideration. In such agreement, The Government may charge the
user levies and collect the same either by itself or entrust the collection for
consideration to any concessionaire who shall after collecting the user levies,
pay the same to the Government.
(ii) Lease Management Agreement- A contractual arrangement whereby the
Government leases a Project owned by it to the concessionaire which is
permitted to operate and maintain the Project for the period specified in the
contract. The concessionaire is allowed to charge the users appropriate fees,
27
Tripura Gazette, Extraordinary Issue, July 24, 2018 A. D.
rentals and charges as specified in the agreement to enable the recovery of
investment in the Project.
(iii) Build-Lease-Transfer (BLT)- A contractual arrangement whereby the
concessionaire undertakes to finance and construct the Project and on its
completion hands it over to the Government. The Government then gives the
facility to the same Operator on a lease arrangement for a fixed period, after
which ownership of the facility is automatically transferred to the Government.
(iv) Rehabilitate-Operate-Transfer (ROT)– A contractual arrangement whereby
an existing facility is handed over to the concessionaire to invest, refurbish,
operate and maintain for a period, at the expiry of which the facility is returned
to the Government. The concessionaire operates the facility over a fixed term
during which they are allowed to charge the users appropriate fees, rentals and
charges, as specified in the contract to enable the recovery of investment in the
Project.
(v) Rehabilitate-Own-Operate (ROO)- A contractual arrangement whereby an
existing facility is handed over to the concessionaire to invest, refurbish, operate
and maintain the development facility from which the concessionaire is allowed
to recover the total investment by collecting user levies from facility users. The
ownership of the land shall be vested with the Government. The transfer of the
facility to the Government is not envisaged in this arrangement; however, The
Government may terminate its obligations after a specified time period.
D.M. Jamatia
L.R. & Secretary, Law
Government of Tripura
Printed at the Tripura Government Press, Agartala.
28
Previous and next
All sections of The Tripura Infrastructure Investment Fund Act,2018
Questions people ask
Is section 31 of the Tripura Infrastructure Investment Fund Act,2018 still in force?
No repeal of the Tripura Infrastructure Investment Fund Act,2018 is recorded.