Rule 29, TRIPURA BUILDING RULES — 2017: Notice for completion of work up to plinth level

TRIPURA BUILDING RULES — 2017 - Rule 29

Text of rule 29

Notice for completion of work up to plinth level

29. Notice for completion of work up to plinth level.- (1) After the completion of the structural work up to the plinth level or up to 1(one) metre above ground level, whichever is higher, the applicant shall give a notice to the ULB in Form ‘F’ to enable him to inspect such work. (2) An officer of the ULB duly authorized in this behalf shall inspect the work at the site within 15(fifteen) days from the date of the receipt of the notice and within 7(seven) days of such inspection issue necessary direction, if any.