Rule 25, TRIPURA BUILDING RULES — 2017: Fees for sanction of building plans

TRIPURA BUILDING RULES — 2017 - Rule 25

Text of rule 25

Fees for sanction of building plans

25. Fees for sanction of building plans. - (1) The ULB shall levy a minimum fee for sanction of building plan at such rates, specified in the following on the basis of the sanctioned total covered area in all floors - however maximum fees will not exceed 5 (five) times the minimum specified fees as given hereunder - (a) for load bearing buildings the minimum rate of fees would be Rs. 20/—(twenty) Page 26 per sq.mt. and (b) for buildings proposed to be constructed by R00 structure, the rate of fees would be Rs. 25/—(Twenty five) per sq. mt. (2) In the case of steel towers, the ULB shall levy fees at the rate of Rs.3/— (three) per cubic metre of the volume of such towers. (3) The ULB shall levy a development fee, in addition to the fees specified in sub- rule(1) or sub-rule(2), as the case may be, for passing the building whose Floor Area Ratio has been calculated on the basis of a means of access which is a National Highway, State Highway or any such access having an width of 15 metres or above, at such rates as may be determined by the ULB.

Previous and next

All provisions of TRIPURA BUILDING RULES — 2017

Questions people ask

Is rule 25 of TRIPURA BUILDING RULES — 2017 still in force?

No repeal of TRIPURA BUILDING RULES — 2017 is recorded.