Rule 16, TRIPURA BUILDING RULES — 2017: Preparation of plan and supervision of execution of work
TRIPURA BUILDING RULES — 2017 - Rule 16
Text of rule 16
Preparation of plan and supervision of execution of work
16. Preparation of plan and supervision of execution of work.-
(1) Every person who intends to erect, re-erect or add to or alter any building shall get its
plan prepared and structural work designed and supervised by an architect, / structural
engineer/licensed building Planner as required under Rule 17. While submitting the plan the
architect/ licensed building Planner/ structural engineer should certify to the effect that the site
has been personally inspected while planning the building and/or designing the structural
members, as well as has taken into account the findings of/or recommendations of stability
analysis as well as examined the Soil Tests Reports as and where necessary under this rule.
(2) In all such cases, the licensed building Planner, structural engineer or geo—technical
engineer shall have to be empanelled with the ULB.
(3) The name and address and license or empanelment number of person so employed
and serial number/ registration number in the case of architect shall be stated in the application
in respect of such buildings.
(4) In case of building plans /site plans submitted by central or state government or by
organization controlled by Central or State Government, if the plans are prepared and submitted
under the signature of Government Engineer or Architect who are employees of the applicant
organization, the Rule 16 (1) and 16(3) shall not be applicable.