Text of appendix XVI
APPENDIX-XVI
APPENDIX-XVI
Environmental Cell at the level of Local Authority:
An Environmental Cell shall be setup at the local authority level to support compliance and monitoring of
environmental conditions in buildings. The Cell shall also provide assistance in environmental planning and capacity
building within their jurisdiction. The responsibility of this cell would be monitoring the implementation of this
notification and providing an oversight to the Third-Party Auditing process. The cell will operate under the local
authority.
Constitution of the cell:
The cell will comprise of at least 3 dedicated experts in following fields:
a) Waste management (solid and liquid)
b) Water conservation and management
c) Resource efficiency including Building materials
d) Energy Efficiency and renewable energy
e) Environmental planning including air quality management.
f) Transport planning and management.
The Cell shall induct at least two outside experts as per the requirements and background of dedicated
experts.
Existing environmental cells at the level of local authority can be co-opted and trained for this Cell.
Financial Support:
An additional fee may be charged along with processing fee for building permission for integrating
environmental conditions and it‘s monitoring. The local authority can fix and revise this additional fee from time to
time. The amount of this fee shall be deposited in a separate bank account, and used for meeting the requirement of
salary / emoluments of experts and running the system of online application, verifications and the Environmental Cell.
Functions of the Cell:
1) The cell shall be responsible for assessing and appraising the environmental concerns of the area under their
jurisdiction where building activities are proposed. The Cell can evolve and propose additional environmental
conditions as per requirements. These conditions may be area specific and shall be notified in advance from
time to time. These additional conditions shall be approved following a due consultation process. These
environmental conditions will be integrated in building permissions by the sanctioning authority.
2) Develop and maintain an online system for application and payment of fees. The Cell shall maintain an online
database of all applications received, projects approved, the compliance audit report, random inspections
made. The Cell shall maintain a portal for public disclosure of project details including self certification and
compliance audit reports filed by the Qualified Building Environment Auditors for public scrutiny of
compliance of environmental conditions by the project.
3) Monitoring the work of Environmental Audit process carried by the Qualified Building Auditors.
4) The Cell shall review the applications; finalize the additional environmental conditions if required within 30
days of the submission of the application to the local authority.
5) The Cell shall adopt risk based random selection of projects for verifying on site for certification of QBA,
compliance of environmental conditions and five yearly audit report.
6) The Cell shall recommend to the local authority for financial penalty for non-compliance of environmental
conditions by the project proponent.
7) The Cell shall recommend to the accrediting body and the local authority against any Qualified Building
Environment Auditor, if any lapse is found in their work.
Page | 87
1 3 GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS
(RECOMMENDATORY ONLY)
All buildings on various plot sizes above 100 sq.m should be encouraged to comply with the green norms and to
the requirements for sanction as mentioned in this chapter.
13.1 Provisions and Applicability
The green building provisions on various plot sizes are indicated in the table below:
Table 14.1 Provisions and applicability for various plot sizes (Residential and Non-Residential)
Plot Applicable plot area Provisions for Residential Provisions for Non- Residential
Category (sq.m)
I Up to 420 4(a) Nil
II 420 to 1,000 1(a),1(c), 2(a),2(b),3(c),4(a) 1(a),1(c),2(a),2(b),3(c),4(a)
1,000 to 3,000 1(a),1(c),1(d),2(a),2(b), 3(b), 1(a), 1(c), 1(d), 2(a), 2(b), 3(b), 3(c),
3(c), 4(a) 4(a)
III Above 3,000 1(a),1(b),1(c),1(d),2(a), 1(a), 1(b), 1(c), 1(d), 2(a), 2(b), 3(a),
2(b),3(a),3(b),3(c),4(a), 4(b) 3(b), 3(c), 4(a), 4(b)
PROVISIONS FOR SANCTION
1. Water Conservation and Management
a) Rain Water Harvesting
b) Low Water Consumption Plumbing Fixtures
c) Waste Water Recycle and Reuse d) Reduction of Hardscape
2. Solar Energy Utilization
a) Installation of Solar Photovoltaic Panels
b) Installation of Solar Assisted Water Heating Systems
3. Energy Efficiency (Concept of passive solar design of buildings)
a) Low Energy Consumption Lighting Fixtures (Electrical Appliances – BEE Star and Energy Efficient
Appliances)
b) Energy Efficiency in HVAC systems.
c) Lighting of Common areas by Solar energy/ LED devices.
4. Waste Management
a) Segregation of Waste
b) Organic Waste Management
13.2 Provisions for City And Site Level Greening
In alignment with National Sustainable Habitat Mission, the Administration/Authority shall encourage
augmentation of green cover in the city/plot, by following:
(i) Provision of minimum 1 tree / every 80sqmt of plot area for plot sizes > 100sqmt and planted within
the setback of the plot.
(ii) Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under
consideration.
(iii) Choice of species for plantation in site and abutting the road to be adopted as per Section 8 of the
Urban Green Guidelines, 2014.
(iv) The unpaved area shall be more than or equal to 20% of the recreational open spaces.
Page | 88
13.3 Water Re-Use and Recycling
i. All buildings having a minimum discharge of 10,000 Ltr. and above per day shall incorporate waste-water
recycling system. The recycled water shall be used for horticultural, flushing and cooling tower purposes.
ii. The dual pipe system shall be adopted for these buildings.
13.4 Installation of Solar Assisted Water Heating System/ Solar Photo Voltaic Power Plant in Buildings
1(a) No new building in the following categories in which there is a system of installation for supplying hot
water shall be built unless the system of the installation is also having an auxiliary solar assisted water
heating system:-
(a) Hospitals and Nursing Home.
(b) Hotels, Lodges, Guest Houses, Group Housing with a plot area of 4048 sq m.
(c) Hostels of Schools, Colleges and Training Centres with more than 100 Students.
(d) Barracks of armed forces, paramilitary forces and police.
(e) Individual residential buildings having plot area equal or more than 1 kanal (420 sq.mt).
(f) Functional Buildings of Railway Stations and Air Ports like waiting rooms, retiring rooms, rest
rooms, inspection bungalows and catering units.
(g) Community Centres, Banquet Halls, Bhawans and buildings for similar use.
1(b) As regards to residential buildings, all houses on a site of one kanal will make provisions for solar water
heating system having capacity of atleast 100 Ltr. and on a site of two kanals and above that of atleast
200 Ltr. The existing houses will provide these facilities within two years from the date these orders are
notified in the official gazette.
II) Installation of Solar Water Heating System
(a) New Buildings: Clearance of plan for the construction of new buildings of the aforesaid categories
shall only be given if they have a provision in the building design itself for an insulated pipeline
from the rooftop in the building to various distribution points where hot water is required. The
building must have a provision for continuous water supply to the solar water heating system. The
building should also have open space on the rooftop, which receives direct sun light. The load
bearing capacity of the roof should at least be 50 kg. per sq m. All new buildings of above said
categories must complete installation of solar water heating systems before obtaining necessary
license to commence their business.
(b) Existing Buildings: Installation of Solar Assisted Water Heating Systems in the existing building
shall be made mandatory at the time, if allowed, to above said category provided there is a system
or installation for supplying hot water.
(c) Capacity: The recommended minimum capacity shall not be less than 25 Ltr. per day for each
bathroom and kitchen subject to the condition that maximum of50% of the total roof area is
provided with the system.
(d) Specifications: Installation of Solar Assisted Water Heating Systems shall conform to BIS
specification IS 12933. The solar collectors used in the system shall have the BIS certification
mark.
III Installation of solar photo voltaic power plant
For installation of solar photo voltaic power plant refer Annexure - 2
Page | 89
13.5 Sustainable Waste Management
Zero Waste is a concept of waste management and planning approaches that emphasize waste prevention as
opposed to end waste management. This means restructuring production and distribution systems, designing and
managing products and processes to systematically follow the 3R rule of Reduce, Re-use and Re-cycle the
volume of waste, to conserve and recover all used resources, and therefore eliminating all discharges to landfills,
and prevent air, water and land pollution. Zero Waste/ land-fill can be achieved by adopting systematic approach
of segregation at source by planning, by collection facilitation and most importantly by creating public
awareness.
The green waste can be converted into fuel cakes, kitchen waste into manure, construction & demolition waste
into bricks, plastic waste into oil, paper, glass and steel back into the same and all residual inert materials can
also be converted into bricks. Achieving zero land-fill is more conveniently possible, if
a) The collection is made from house to house and some segregation is done at household level
and separate wet and dry bins must be provided at the ground level.
b) The recycling is done at decentralized, say, ward or even lower levels.
13.6 Provision of Energy Conservation Building Rule
Competent Authority may require a class of buildings to be compliant with Energy Conservation Building Code
ECBC Code 2007 and specify a procedure of its verification.
13.7 Suggested Sustainable Building Materials
The following supplementary building materials (derived or processed waste) may be suitably used while
constructing building in combination with conventional resources:
i. Panels, hollow slabs, hollow blocks - Conservation of materials, less water requirement.
ii. Fly Ash bricks, Portland Pozzolana cement, Fly ash concrete, phosphor gypsum based walling & roofing
panels, particle wood – Recycled use of industrial/agricultural by-products.
iii. Fly ash/ AAC (Autoclaved Aerated light weight Concrete) panels/ CLC (Cellular Light weight Concrete)
panels- Ensures thermal comfort (significant reduction in air-conditioning requirement)
iv. Use of bamboo & rapidly growing plantation timbers- Environmental benefits.
v. Compressed Soil Earth Block and Rammed Earth Walls and Vaults-Environmental friendly.
Page | 90
1 4 POWER OF RELAXATION
The Chief Administrator, U.T, Chandigarh may relax any restrictions or conditions or norms stated in these rules ,
interpret or clarify or may issue direction to revise the Rules, if the relaxation or revision is in public interest.
15 REPEAL & SAVINGS
i) The Punjab Capital (Development and Regulation Building) Rules, 1952 are hereby repealed.
ii) Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken
including any notification, order or notice made or issued or any permission, authorization or exemption granted
or any document or instrument executed or any direction given under the repealed Rules shall, in so far as it is
not inconsistent with the provision of these rules, be deemed to have been done or taken under the
corresponding provisions of these rules.
Page | 91
ANNEXURE – 1
Forms
Previous and next
Questions people ask
Is appendix XVI of Rule-2017-The Central Government may, by notification in the official Gazette, make rules for carrying out the purposes of this Act. still in force?
No repeal of Rule-2017-The Central Government may, by notification in the official Gazette, make rules for carrying out the purposes of this Act. is recorded.