LawGrids logoLAWGRIDS.ORG

Regulation 38, Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017: Repeal and savings

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 - Regulation 38

Text of regulation 38

Repeal and savings

38. Repeal and savings.— Save as otherwise provided in these regulations, Bihar Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Solar Energy Sources) Regulations, 2010 read with its amendments are hereby repealed. By Order of the Commission, PARMANAND SINGH, Secretary. 18 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 Form-1.1: Form Template for Solar PV including Rooftop Solar PV/Solar Thermal S. No Assumption Head Sub-Head Sub-Head(2) Unit Parameter 1 Power Generation Capacity Installed Power Generation Capacity Capacity Utilization Factor Commercial Operation Date Useful Life MW % mm/yyyy years 2 Project Cost Capital Cost/MW Normative Capital Cost Capital Subsidy If any Net Capital Cost Rs. Lakh/MW Rs. Lakh Rs. Lakh Rs. Lakh 3 Financial Assumptions Debt Equity Debt Component Equity Component Depreciation Incentives Tariff Period Debt Equity Total Debt Amount Total Equity Amount Loan Amount Moratorium Period Repayment Period (include Moratorium) Interest Rate Equity amount Return on Equity for first 10 years Return on Equity 11th year onwards Discount Rate Depreciation Rate for 1st 10 Yrs. Depreciation Rate 11th years onward Generation Based Incentives. If any Period for GBI Years % % % Rs. Lakh Rs. Lacs Years Years % Rs. Lakh %p.a %p.a % % % Rs. L p.a. Years 4 Operation & Maintenance Normative O&M expense O&M expanse per annum Escalation factor for O&M expense Rs. Lakh/MW Rs. Lakh % 5 Working Capital O&M expense Receivables Interest on Working Capital Month Month % p.a 19 BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017 Form-1.2: Form Template for (Biomass Power, Municipal Solid Waste, Refuse Derived Fuel or Non-fossil fuel based Co gen) S. No Assumption Head Sub-Head Sub-Head(2) Unit Parame ter 1 Power Generation Capacity Installed Power Generation Capacity Auxiliary Consumption factor PLF (during stabilisation upto 6 months) PLF (during 1st year stabilisation) PLF (2nd year onwards) Commercial Operation Date Useful Life MW % % % % mm/yyyy years 2 Project Cost Capital Cost/MW Normative Capital Cost Capital Cost Capital Subsidy, If any Net Capital Cost Rs.Lakh/ MW Rs. Lakh Rs. Lakh 3 Financial Assumptions Debt Equity Debt Component Equity Component Depreciation Incentives Tariff Period Debt Equity Total Debt Amount Total Equity Amount Loan Amount Moratorium Period Repayment Period (include Moratorium) Interest Rate Equity amount Return on Equity for first 10 years Return on Equity 11th year onwards Discount Rate Depreciation Rate for 1st 10 Yrs. Depreciation Rate 11th years onward Generation Based Incentives. If any period for GBI Years % % % Rs. Lakh Rs. Lacs Years Years % Rs.Lakh %p.a %p.a % % % Rs. L p.a. Years 4 Operation & Maintenance Normative O&M expense O&M expanses per annum Escalation factor for O&M expense Rs. Lakh/MW % 5 Working Capital O&M expense Receivables Interest on Working Capital Rs.Lakh Month % p.a 6 Fuel related assumptions Station Heat Rate During stabilisation post stabilisation Biomass fuel type-1 kCal/Kwh kCal/Kwh % 20 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 S. No Assumption Head Sub-Head Sub-Head(2) Unit Parame ter Fuel Type & mix Biomass fuel type-2 Municipal Solid Waste fuel Refuse Derived Fuel fossil fuel (coal) GCV of Biomass fuel type-1 GCV of Biomass fuel type-2 GCV of Municipal Solid Waste fuel GCV of Refuse Derived Fuel GCV of fossil fuel (coal) Biomass Price (fuel type-1) yr-1 Biomass Price (fuel type-2) yr-1 Municipal Solid Waste Price/yr-1 Refuse Derived Fuel Price/yr-1 fuel price escalation factor % % % % kCal/Kwh kCal/Kwh kCal/Kwh kCal/Kwh kCal/Kwh Rs/MT Rs/MT Rs/MT Rs/MT %p.a 21 BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017 Form-2.1: Form Template for (Solar PV/Solar thermal) : Determination of Tariff Components Units Generation Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 Installed Capacity MW Net Generation MU Units Generation Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 Installed Capacity MW Net Generation MU Tariff Components (Fixed charge) Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 O&M Expenses Rs Lakh Depreciation Rs Lakh Interest on term loan Rs Lakh Interest on working Capital Rs Lakh Return on Equity Rs Lakh Total Fixed Cost Rs Lakh Tariff Components (Fixed charge) Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 O&M Expenses Rs Lakh Depreciation Rs Lakh Interest on term loan Rs Lakh Interest on working Capital Rs Lakh Return on Equity Rs Lakh Total Fixed Cost Rs Lakh Per Unit Tariff components Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 PU O&M Expenses Rs/kWh PU Depreciation Rs/kWh PU Interest on term loan Rs/kWh PU Interest on working Capital Rs/kWh PU Return on Equity Rs/kWh PU Tariff Components Rs/kWh Levellised Tariff Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 Discount Factors Discounted Tariff components Rs/kWh Levellised Tariff Rs/kWh Per Unit Tariff components Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 PU O&M Expenses Rs/kWh PU Depreciation Rs/kWh PU Interest on term loan Rs/kWh PU Interest on working Capital Rs/kWh PU Return on Equity Rs/kWh PU Tariff Components Rs/kWh Levellised Tariff Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 Discount Factors Discounted Tariff components Rs/kWh Levellised Tariff Rs/kWh 22 BIHAR GAZETTE (EXTRA) 24TH OCTOBER 2017 Form-2.2: Form Template for (Biomass Power, Municipal Solid Waste, Refuse Derived Fuel or Non-fossil fuel based Cogen) : Determination of Tariff Component Form-2.2: contd. Units Generation Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Y+++++ +++++++ +++++++ ++++++ …r-10 Yr-11 Yr-12 Yr-13 Installed Capacity MW Net Generation MU Tariff Components (Fixed charge) Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 O&M Expenses Rs Lakh Depreciation Rs Lakh Interest on term loan Rs Lakh Interest on working Capital Rs Lakh Return on Equity Rs Lakh Total Fixed Cost Rs Lakh Tariff Components (Variable charge) Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 Biomass fuel type-1 Rs Lakh Biomass fuel type-2 Rs Lakh Fossil fuel (coal) Rs Lakh Municipal Solid Waste Rs Lakh Refuse Derived Fuel Rs Lakh Sub-total (Fuel Costs) Rs Lakh Fuel cost allocable to power % Total Fuel Costs Rs Lakh Per Unit Tariff components (fixed) Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 PU O&M Expenses Rs/kWh PU Depreciation Rs/kWh PU Interest on term loan Rs/kWh PU Interest on working Capital Rs/kWh PU Return on Equity Rs/kWh PU Tariff Components (Fixed) Rs/kWh PU Tariff Components (Variable) Rs/kWh PU Tariff Components (Total) Rs/kWh Levellised Tariff Unit Yr-1 Yr-2 Yr-3 Yr-4 Yr-5 Yr-6 Yr-7 Yr-8 Yr-9 Yr-10 Yr-11 Yr-12 Yr-13 Discount Factors Discounted Tariff components (fixed) Rs/kWh Discounted Tariff components (variable) Rs/kWh Discounted Tariff components (total) Rs/kWh Levellised Tariff (fixed) Rs/kWh Levellised Tariff (variable) Rs/kWh Levellised Tariff (total) Rs/kWh 23 BIHAR GAZETTE (EXTRA), 24TH OCTOBER 2017 ———— PUBLISHED AND PRINTED BY THE SUPERINTENDENT, BIHAR SECRETARIAT PRESS, PATNA. Bihar Gazette (Extra) 997—571+400—Egazette Website: http://egazette.bih.nic.in Units Generation Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 Installed Capacity MW Net Generation MU Tariff Components (Fixed charge) Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 O&M Expenses Rs Lakh Depreciation Rs Lakh Interest on term loan Rs Lakh Interest on working Capital Rs Lakh Return on Equity Rs Lakh Total Fixed Cost Rs Lakh Tariff Components (Variable charge) Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 Biomass fuel type-1 Rs Lakh Biomass fuel type-2 Rs Lakh Fossil fuel (coal) Rs Lakh Municipal Solid Waste Rs Lakh Refuse Derived Fuel Rs Lakh Sub-total (Fuel Costs) Rs Lakh Fuel cost allocable to power % Total Fuel Costs Rs Lakh Per Unit Tariff components (fixed) Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 PU O&M Expenses Rs/kWh PU Depreciation Rs/kWh PU Interest on term loan Rs/kWh PU Interest on working Capital Rs/kWh PU Return on Equity Rs/kWh PU Tariff Components (Fixed) Rs/kWh PU Tariff Components (Variable) Rs/kWh PU Tariff Components (Total) Rs/kWh Levellised Tariff Unit Yr-14 Yr-15 Yr-16 Yr-17 Yr-18 Yr-19 Yr-20 Yr-21 Yr-22 Yr-23 Yr-24 Yr-25 Discount Factors Discounted Tariff components (fixed) Rs/kWh Discounted Tariff components (variable) Rs/kWh Discounted Tariff components (total) Rs/kWh Levellised Tariff (fixed) Rs/kWh Levellised Tariff (variable) Rs/kWh Levellised Tariff (total) Rs/kWh

Previous and next

All provisions of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017

Questions people ask

Is regulation 38 of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 still in force?

No repeal of Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2017 is recorded.