Form 4C, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 4C
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 4C
Text of form 4C
FORM- 4C
FORM- 4C
Abstract of Capital Cost Estimates and Schedule of Commissioning for the New Project/Element
Name of the Petitioner: ______________________________
Name of the Region: ______________________________
Name of the Project: ______________________________
Name of the Transmission Element or ______________________________
Communication system:
New Projects
Capital Cost Estimates
Board of Director/ Agency approving the Capital cost estimates:
Date of approval of the Capital cost estimates:
Present Day Cost Completed Cost
As on Scheduled
COD of the
As of End of transmission
Price level of approved estimates ______Qtr. Of the system/transmission
year _________ element/
Communication
System
Foreign Exchange rate considered for the Capital
cost estimates
Capital Cost excluding IDC, IEDC& FC
Foreign Component, if any (In Million US $ or the relevant Currency)
Domestic Component (Rs Lakh)
Capital cost excluding IDC, FC, FERV & Hedging
Cost (Rs. Cr)
IDC, IEDC, FC, FERV & Hedging Cost
Foreign Component, if any (In Million US $ or the relevant Currency)
Domestic Component (Rs Lakh)
Total IDC, FC, FERV & Hedging Cost (Rs Lakh)
Rate of taxes & duties considered
Capital cost Including IDC, IEDC, FC, FERV & Hedging Cost
Foreign Component, if any (In Million US $ or the relevant Currency)
Domestic Component (Rs Lakh)
[PART III] DELHI GAZETTE : EXTRAORDINARY 171
Capital cost Including IDC, IEDC& FC (Rs Lakh)
Schedule of Commissioning
COD of transmission system 1 /transmission element 1/Communication System 1
COD of transmission system 1/ transmission element 2/ Communication System 2
----------------
---------------
COD of last transmission system /transmission element / Communication System
Note:
1. Copy of approval letter by the Board duly certified by the Company secretary should be enclosed
2. Details of Capital Cost are to be furnished as per FORM-5 or 5A as applicable
3. Details of IDC & Financing Charges are to be furnished as per FORM-12(B).
Element wise Break-up of Project/Asset/Element Cost for Transmission System or
Communication System
Name of the Petitioner: ______________________________
Name of the Region: ______________________________
Name of the Project: ______________________________
Name of the Transmission Element or ______________________________
Communication system:
(Amount in Rs. Lakh)
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Expendi-
ture as on Liabilities/
As per Original Esti-
mates (3) Variationfor Admitted
No.Particulars (2)
COD
(4) Provisions
(1)
(5)
(6=3-4-5) VariationCost (8)
Quanti
Estimated
Actual
Rate Quantity Rate (7)
ty Amount Amount
A
TRANSMISSION
LINE
1.0
Preliminary
works
1.1
Design &
Engineering
Preliminary
Investigation,
Right
1.2
of way, forest
clearance, PTCC,
general civil works
etc.
1.3
Total Preliminary
works
172 DELHI GAZETTE : EXTRAORDINARY [PART III]
2.0
Transmission
Lines
material
2.1 Towers Steel
2.2 Conductor
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Expendi-
ture as on Liabilities/
As per Original Esti-
mates (3) Variationfor Admitted
No.Particulars (2)
COD
(4) Provisions
(6=3-4-5) VariationCost (8)
(1)
Quanti
Estimated
Actual (5)
Rate Quantity Rate (7)
ty Amount Amount
2.3 Earth Wire
2.4 Insulators
2.5
Hardware Fit-
tings
2.6
Conductor &
Earth
wire accessories
2.7 Spares
Erection, String-
ing
2.8
& Civil works
including
foundation
Total Transmis-
sion
Lines material
3.0
Taxes and Du-
ties
3.1 Custom Duty
3.2 Other Taxes &
Duties
Total Taxes &
Duties
Total -
Transmission
lines
B. SUBSTATIONS
4.0
Preliminary
works & land
4.1
Design &
Engineering
4.2 Land
[PART III] DELHI GAZETTE : EXTRAORDINARY 173
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Expendi-
ture as on Liabilities/
As per Original Esti-
mates (3) Variationfor Admitted
No.Particulars (2)
COD
(4) Provisions
(6=3-4-5) VariationCost (8)
(1)
Quanti
Estimated
Actual (5)
Rate Quantity Rate (7)
ty Amount Amount
4.3 Site preparation
Total Prelimi-
nary
works & land
5.0 Civil Works
Control Room
&
5.1 Office Building
including
HVAC
5.2
Township &
Colony
5.3
Roads and
Drainage
5.4
Foundation for
structures
5.5
Misc. civil
works
Total Civil
Works
6.0
Substation
Equipments
Switchgear
(CT,PT,
6.1 Circuit Breaker,
Isolator etc)
6.2 Transformers
Compensating
6.3
Equipment(
Reactor,
SVCs etc)
6.4
Control , Relay
&
Protection Pan-
el
6.5 PLCC
6.6 HVDC package
174 DELHI GAZETTE : EXTRAORDINARY [PART III]
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Ex-
penditure as on Liabilities/
As per Original Esti-
mates (3) Variation for Admitted
No. Particulars (2)
COD
(4) Provisions
(6=3-4-5) Variation Cost (8)
(1)
Quanti
Estimated
Actual (5)
Rate Quantity Rate (7)
ty Amount Amount
Bus Bars/
6.7 conductors/Insulat
ors
6.8 Outdoor lighting
6.9
Emergency D.G.
Set
6.10 Grounding System
6.11
Structure for
switchyard
Total Substation
Equipments
7.00 Spares
8.0 Taxes and Duties
8.1 Custom Duty
8.2 Other Taxes &
Duties
8.3
Total Taxes &
Duties
Total (Sub-station)
C
Communication
System
9.1 Preliminary Works
9.2
Communication
System equipment’s
9.3 Taxes and Duties
Total
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Expendi-
ture as on Liabilities/
As per Original Esti-
mates (3) Variationfor Admitted
No. Particulars (2)
COD
(4) Provisions
(6=3-4-5) VariationCost (8)
(1)
Quanti
Estimated
Actual (5)
Rate Quantity Rate (7)
ty Amount Amount
(Communication
[PART III] DELHI GAZETTE : EXTRAORDINARY 175
System)
Construction
and
10.0
pre-
commissioning
expenses
Site supervision
&
10.1
site administra-
tion
.etc.
10.2 Tools and Plants
10.3
construction
Insurance
Total Con-
struction
and pre
commissioning
expenses
11.0 Overheads
11.1 Establishment
11.2
Audit & Ac-
counts
11.3 Contingency
Total Over-
heads
12.0
Cost of Plant &
Machinery
13.0
Capital Cost
including Plant
&
Cost in Rs. Lakh
Reasons
Sl.
Actual Capital Expendi-
ture as on Liabilities/
As per Original Esti-
mates (3) Variationfor Admitted
No. Particulars (2)
COD
(4) Provisions
(6=3-4-5) VariationCost (8)
(1)
Quanti
Estimated
Actual (5)
Rate Quantity Rate (7)
ty Amount Amount
Machinery
13.1 Interest During
Construction
(IDC)
13.2
Financing
Charges
176 DELHI GAZETTE : EXTRAORDINARY [PART III]
(FC)
Foreign Ex-
change
13.3 Rate Variation
(FERV)
13.4 Hedging Cost
Total of IDC,
FC,
FERV &
Hedging
Cost
Capital cost
14.0
including
IDC, FC,
FERV &
Hedging
Cost
Note:
1. In case of cost variation, a detailed note giving reasons of such variation should be submitted clearly indicating wheth-
er such cost over- run was beyond the control of the transmission licensee.
2. Separate details of free hold/lease hold land should be submitted.
(Petitioner)
Previous and next
Questions people ask
Is form 4C of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?
No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.