Form 4C, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 4C

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 4C

Text of form 4C

FORM- 4C

FORM- 4C Abstract of Capital Cost Estimates and Schedule of Commissioning for the New Project/Element Name of the Petitioner: ______________________________ Name of the Region: ______________________________ Name of the Project: ______________________________ Name of the Transmission Element or ______________________________ Communication system: New Projects Capital Cost Estimates Board of Director/ Agency approving the Capital cost estimates: Date of approval of the Capital cost estimates: Present Day Cost Completed Cost As on Scheduled COD of the As of End of transmission Price level of approved estimates ______Qtr. Of the system/transmission year _________ element/ Communication System Foreign Exchange rate considered for the Capital cost estimates Capital Cost excluding IDC, IEDC& FC Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs Lakh) Capital cost excluding IDC, FC, FERV & Hedging Cost (Rs. Cr) IDC, IEDC, FC, FERV & Hedging Cost Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs Lakh) Total IDC, FC, FERV & Hedging Cost (Rs Lakh) Rate of taxes & duties considered Capital cost Including IDC, IEDC, FC, FERV & Hedging Cost Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs Lakh) [PART III] DELHI GAZETTE : EXTRAORDINARY 171 Capital cost Including IDC, IEDC& FC (Rs Lakh) Schedule of Commissioning COD of transmission system 1 /transmission element 1/Communication System 1 COD of transmission system 1/ transmission element 2/ Communication System 2 ---------------- --------------- COD of last transmission system /transmission element / Communication System Note: 1. Copy of approval letter by the Board duly certified by the Company secretary should be enclosed 2. Details of Capital Cost are to be furnished as per FORM-5 or 5A as applicable 3. Details of IDC & Financing Charges are to be furnished as per FORM-12(B). Element wise Break-up of Project/Asset/Element Cost for Transmission System or Communication System Name of the Petitioner: ______________________________ Name of the Region: ______________________________ Name of the Project: ______________________________ Name of the Transmission Element or ______________________________ Communication system: (Amount in Rs. Lakh) Cost in Rs. Lakh Reasons Sl. Actual Capital Expendi- ture as on Liabilities/ As per Original Esti- mates (3) Variationfor Admitted No.Particulars (2) COD (4) Provisions (1) (5) (6=3-4-5) VariationCost (8) Quanti Estimated Actual Rate Quantity Rate (7) ty Amount Amount A TRANSMISSION LINE 1.0 Preliminary works 1.1 Design & Engineering Preliminary Investigation, Right 1.2 of way, forest clearance, PTCC, general civil works etc. 1.3 Total Preliminary works 172 DELHI GAZETTE : EXTRAORDINARY [PART III] 2.0 Transmission Lines material 2.1 Towers Steel 2.2 Conductor Cost in Rs. Lakh Reasons Sl. Actual Capital Expendi- ture as on Liabilities/ As per Original Esti- mates (3) Variationfor Admitted No.Particulars (2) COD (4) Provisions (6=3-4-5) VariationCost (8) (1) Quanti Estimated Actual (5) Rate Quantity Rate (7) ty Amount Amount 2.3 Earth Wire 2.4 Insulators 2.5 Hardware Fit- tings 2.6 Conductor & Earth wire accessories 2.7 Spares Erection, String- ing 2.8 & Civil works including foundation Total Transmis- sion Lines material 3.0 Taxes and Du- ties 3.1 Custom Duty 3.2 Other Taxes & Duties Total Taxes & Duties Total - Transmission lines B. SUBSTATIONS 4.0 Preliminary works & land 4.1 Design & Engineering 4.2 Land [PART III] DELHI GAZETTE : EXTRAORDINARY 173 Cost in Rs. Lakh Reasons Sl. Actual Capital Expendi- ture as on Liabilities/ As per Original Esti- mates (3) Variationfor Admitted No.Particulars (2) COD (4) Provisions (6=3-4-5) VariationCost (8) (1) Quanti Estimated Actual (5) Rate Quantity Rate (7) ty Amount Amount 4.3 Site preparation Total Prelimi- nary works & land 5.0 Civil Works Control Room & 5.1 Office Building including HVAC 5.2 Township & Colony 5.3 Roads and Drainage 5.4 Foundation for structures 5.5 Misc. civil works Total Civil Works 6.0 Substation Equipments Switchgear (CT,PT, 6.1 Circuit Breaker, Isolator etc) 6.2 Transformers Compensating 6.3 Equipment( Reactor, SVCs etc) 6.4 Control , Relay & Protection Pan- el 6.5 PLCC 6.6 HVDC package 174 DELHI GAZETTE : EXTRAORDINARY [PART III] Cost in Rs. Lakh Reasons Sl. Actual Capital Ex- penditure as on Liabilities/ As per Original Esti- mates (3) Variation for Admitted No. Particulars (2) COD (4) Provisions (6=3-4-5) Variation Cost (8) (1) Quanti Estimated Actual (5) Rate Quantity Rate (7) ty Amount Amount Bus Bars/ 6.7 conductors/Insulat ors 6.8 Outdoor lighting 6.9 Emergency D.G. Set 6.10 Grounding System 6.11 Structure for switchyard Total Substation Equipments 7.00 Spares 8.0 Taxes and Duties 8.1 Custom Duty 8.2 Other Taxes & Duties 8.3 Total Taxes & Duties Total (Sub-station) C Communication System 9.1 Preliminary Works 9.2 Communication System equipment’s 9.3 Taxes and Duties Total Cost in Rs. Lakh Reasons Sl. Actual Capital Expendi- ture as on Liabilities/ As per Original Esti- mates (3) Variationfor Admitted No. Particulars (2) COD (4) Provisions (6=3-4-5) VariationCost (8) (1) Quanti Estimated Actual (5) Rate Quantity Rate (7) ty Amount Amount (Communication [PART III] DELHI GAZETTE : EXTRAORDINARY 175 System) Construction and 10.0 pre- commissioning expenses Site supervision & 10.1 site administra- tion .etc. 10.2 Tools and Plants 10.3 construction Insurance Total Con- struction and pre commissioning expenses 11.0 Overheads 11.1 Establishment 11.2 Audit & Ac- counts 11.3 Contingency Total Over- heads 12.0 Cost of Plant & Machinery 13.0 Capital Cost including Plant & Cost in Rs. Lakh Reasons Sl. Actual Capital Expendi- ture as on Liabilities/ As per Original Esti- mates (3) Variationfor Admitted No. Particulars (2) COD (4) Provisions (6=3-4-5) VariationCost (8) (1) Quanti Estimated Actual (5) Rate Quantity Rate (7) ty Amount Amount Machinery 13.1 Interest During Construction (IDC) 13.2 Financing Charges 176 DELHI GAZETTE : EXTRAORDINARY [PART III] (FC) Foreign Ex- change 13.3 Rate Variation (FERV) 13.4 Hedging Cost Total of IDC, FC, FERV & Hedging Cost Capital cost 14.0 including IDC, FC, FERV & Hedging Cost Note: 1. In case of cost variation, a detailed note giving reasons of such variation should be submitted clearly indicating wheth- er such cost over- run was beyond the control of the transmission licensee. 2. Separate details of free hold/lease hold land should be submitted. (Petitioner)

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 4C of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.