Form 5Ei, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5Ei

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5Ei

Text of form 5Ei

FORM- 5Ei

FORM- 5Ei In case there is cost over run Name of the Petitioner ______________________________________ Name of the Generating Station ______________________________________ Sl. No. Break Down Original Cost (Rs.Lakh) as approved by the Board of Members Actual/Esti mated Cost as incurred/to be incurred(Rs. Lakh) Difference Reasons for Variation(Please submit supporting computations and documents wherever applicable) Increase in soft cost due to increase in hard cost Total Cost Total Cost Total Cost Cost of Land & Site 1 Development 1.1 Land* Rehabilitation & Resettlement 1.2 (R&R) Preliminary Investigation & Site 1.3 Development Plant & 2 Equipment Steam Generator 2.1 Island Turbine 2.2 Generator Island 2.3 BOP Mechanical Fuel Handling & Storage 2.3.1 system 2.3.2 External water 2.3.3 [PART III] DELHI GAZETTE : EXTRAORDINARY 117 Sl. Break Down Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to No. (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost approved by the incurred/to be supporting computations Board of incurred(Rs. and documents wherever Members Lakh) applicable) Total Cost Total Cost Total Cost supply system DM water 2.3.3 Plant Clarification 2.3.4 plant Chlorination 2.3.5 Plant Fuel Handling & Storage 2.3.6 system Ash Handling 2.3.7 System Coal Handling 2.3.8 Plant Rolling Stock and 2.3.9 Locomotives 2.3.10 MGR Air Compressor 2.3.11 System Air Condition & Ventilation 2.3.12 System Fire fighting 2.3.13 System 2.3.14 HP/LP Piping Total BOP Mechanical 118 DELHI GAZETTE : EXTRAORDINARY [PART III] Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost approved by the incurred/to be supporting computations Board of incurred(Rs. and documents wherever Members Lakh) applicable) Sl. Total Cost Total Cost Total Cost No. Break Down 2.4 BOP Electrical Switch Yard 2.4.1 Package Transformers 2.4.2 Package Switch gear 2.4.3 Package Cables, Cable facilities & 2.4.4 grounding 2.4.5 Lighting Emergency 2.4.6 D.G. set Total BOP Electrical Control & Instrumentation (C & I) 2.5 Package Total Plant & Equipment excluding taxes & Duties 3 Initial Spares 4 Civil Works Main plant/Adm. 4.1 Building [PART III] DELHI GAZETTE : EXTRAORDINARY 119 Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost approved by the incurred/to be supporting computations Board of incurred(Rs. and documents wherever Members Lakh) applicable) Sl. Total Cost Total Cost Total Cost No. Break Down 4.2 CW system Cooling 4.3 Towers DM water 4.4 Plant Clarification 4.5 plant Chlorination 4.6 plant Fuel handling & Storage 4.7 system Coal Handling 4.8 Plant MGR &Marshalling 4.9 Yard Ash Handling 4.10 System Ash disposal area 4.11 development Fire fighting 4.12 System Township & 4.13 Colony Temp. construction & enabling 4.14 works 120 DELHI GAZETTE : EXTRAORDINARY [PART III] Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to Sl. No. Break Down (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost approved by the incurred/to be supporting computations Board of incurred(Rs. and documents wherever Members Lakh) applicable) Total Cost Total Cost Total Cost Road & 4.15 Drainage Total Civil works 5 Construction & Pre- Commissioning Expenses Erection Testing and 5.1 commissioning Site 5.2 supervision Operator's 5.3 Training Construction 5.4 Insurance 5.5 Tools & Plant 5.6 Start up fuel Total Construction & Pre- Commissioning Expenses 6 Overheads 6.1 Establishment Design & 6.2 Engineering 6.3 Audit & Account [PART III] DELHI GAZETTE : EXTRAORDINARY 121 Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost approved by the incurred/to be supporting computations Board of incurred(Rs. and documents wherever Members Lakh) applicable) Sl. Total Cost Total Cost Total Cost No. Break Down 6.4 Contingency Total Overheads Capital cost excluding IDC 7 & FC IDC, FC, FERV 8 &Hedging Cost Interest During Construction 8.1 (IDC) Financing 8.2 Charges (FC) Foreign Exchange Rate Variation 8.3 (FERV) 8.4 Hedging Coat Total of IDC, FC,FERV & Hedging Cost Capital cost including IDC, FC, FERV & 9 Hedging Cost *Submit details of Freehold and Lease hold land Note: Impact on account of each reason for Cost overrun should be quantified and substantiated with necessary documents and supporting workings. 122 DELHI GAZETTE : EXTRAORDINARY [PART III]

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 5Ei of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.