Form 5Ei, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM- 5Ei
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 5Ei
Text of form 5Ei
FORM- 5Ei
FORM- 5Ei
In case there is cost over run
Name of the Petitioner ______________________________________
Name of the Generating Station ______________________________________
Sl. No. Break Down Original Cost
(Rs.Lakh) as
approved by
the
Board of
Members
Actual/Esti
mated
Cost as
incurred/to
be
incurred(Rs.
Lakh)
Difference
Reasons for
Variation(Please submit
supporting computations
and documents wherever
applicable)
Increase in soft cost due
to
increase in hard cost
Total
Cost Total Cost Total Cost
Cost of Land &
Site
1 Development
1.1 Land*
Rehabilitation
& Resettlement
1.2 (R&R)
Preliminary
Investigation
& Site
1.3 Development
Plant &
2 Equipment
Steam Generator
2.1 Island
Turbine
2.2 Generator Island
2.3 BOP Mechanical
Fuel Handling &
Storage
2.3.1 system
2.3.2 External water
2.3.3
[PART III] DELHI GAZETTE : EXTRAORDINARY 117
Sl. Break Down Original Cost Actual/Estimat Difference Reasons for
Increase in soft cost due
to
No. (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost
approved by
the incurred/to be supporting computations
Board of incurred(Rs. and documents wherever
Members Lakh) applicable)
Total Cost Total Cost Total Cost
supply system
DM water
2.3.3 Plant
Clarification
2.3.4 plant
Chlorination
2.3.5 Plant
Fuel Handling
& Storage
2.3.6 system
Ash Handling
2.3.7 System
Coal Handling
2.3.8 Plant
Rolling Stock
and
2.3.9 Locomotives
2.3.10 MGR
Air
Compressor
2.3.11 System
Air Condition
& Ventilation
2.3.12 System
Fire fighting
2.3.13 System
2.3.14 HP/LP Piping
Total BOP
Mechanical
118 DELHI GAZETTE : EXTRAORDINARY [PART III]
Original Cost Actual/Estimat Difference Reasons for
Increase in soft cost due
to
(Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost
approved by
the incurred/to be supporting computations
Board of incurred(Rs. and documents wherever
Members Lakh) applicable)
Sl. Total Cost Total Cost Total Cost
No. Break Down
2.4 BOP Electrical
Switch Yard
2.4.1 Package
Transformers
2.4.2 Package
Switch gear
2.4.3 Package
Cables, Cable
facilities &
2.4.4 grounding
2.4.5 Lighting
Emergency
2.4.6 D.G. set
Total BOP
Electrical
Control &
Instrumentation
(C & I)
2.5 Package
Total Plant &
Equipment
excluding taxes
& Duties
3 Initial Spares
4 Civil Works
Main
plant/Adm.
4.1 Building
[PART III] DELHI GAZETTE : EXTRAORDINARY 119
Original Cost Actual/Estimat Difference Reasons for Increase in soft cost due to
(Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost
approved by the incurred/to be supporting computations
Board of incurred(Rs. and documents wherever
Members Lakh) applicable)
Sl. Total Cost Total Cost Total Cost
No. Break Down
4.2 CW system
Cooling
4.3 Towers
DM water
4.4 Plant
Clarification
4.5 plant
Chlorination
4.6 plant
Fuel handling
& Storage
4.7 system
Coal Handling
4.8 Plant
MGR
&Marshalling
4.9 Yard
Ash Handling
4.10 System
Ash disposal
area
4.11 development
Fire fighting
4.12 System
Township &
4.13 Colony
Temp.
construction &
enabling
4.14 works
120 DELHI GAZETTE : EXTRAORDINARY [PART III]
Original Cost Actual/Estimat Difference Reasons for
Increase in soft cost due
to
Sl. No. Break Down (Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost
approved by
the incurred/to be supporting computations
Board of incurred(Rs. and documents wherever
Members Lakh) applicable)
Total Cost Total Cost Total Cost
Road &
4.15 Drainage
Total Civil
works
5
Construction
&
Pre-
Commissioning
Expenses
Erection
Testing and
5.1 commissioning
Site
5.2 supervision
Operator's
5.3 Training
Construction
5.4 Insurance
5.5 Tools & Plant
5.6 Start up fuel
Total
Construction &
Pre-
Commissioning
Expenses
6 Overheads
6.1 Establishment
Design &
6.2 Engineering
6.3
Audit &
Account
[PART III] DELHI GAZETTE : EXTRAORDINARY 121
Original Cost Actual/Estimat Difference Reasons for
Increase in soft cost due
to
(Rs.Lakh) as ed Cost as Variation(Please submit increase in hard cost
approved by
the incurred/to be supporting computations
Board of incurred(Rs. and documents wherever
Members Lakh) applicable)
Sl.
Total Cost Total Cost Total Cost
No. Break Down
6.4 Contingency
Total
Overheads
Capital cost
excluding IDC
7 & FC
IDC, FC, FERV
8 &Hedging Cost
Interest During
Construction
8.1 (IDC)
Financing
8.2 Charges (FC)
Foreign
Exchange Rate
Variation
8.3 (FERV)
8.4 Hedging Coat
Total of IDC,
FC,FERV &
Hedging Cost
Capital cost
including IDC,
FC, FERV &
9 Hedging Cost
*Submit details of Freehold and Lease hold land
Note: Impact on account of each reason for Cost overrun should be quantified and substantiated with necessary documents
and supporting workings.
122 DELHI GAZETTE : EXTRAORDINARY [PART III]
Previous and next
Questions people ask
Is form 5Ei of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?
No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.