LawGrids logoLAWGRIDS.ORG

Form 2, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: FORM-2

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 2

Text of form 2

FORM-2

FORM-2 Plant Characteristics Name of the Petitioner : _______________________________________ Name of the Generating Station : _______________________________________ Unit(s)/Block(s)/Parameters Unit-I Unit-II Unit-III …. Installed Capacity ( MW) Schedule COD as per Investment Approval Actual COD /Date of Taken Over (as applicable) Pit Head or Non Pit Head Name of the Boiler Manufacture Name of Turbine Generator Manufacture Main Steams Pressure at Turbine inlet (kg/Cm 2 ) abs 1 . Main Steam Temperature at Turbine inlet ( o C) 1 Reheat Steam Pressure at Turbine inlet (kg/Cm 2) 1 Reheat Steam Temperature at Turbine inlet ( o C) 1 Main Steam flow at Turbine inlet under MCR condition (tons /hr) 2 Main Steam flow at Turbine inlet under VWO condition (tons /hr) 2 Unit Gross electrical output under MCR /Rated condition (MW) 2 Unit Gross electrical output under VWO condition (MW) 2 Guaranteed Design Gross Turbine Cycle Heat Rate (kCal/kWh) 3 Conditions on which design turbine cycle heat rate guaranteed % MCR % Makeup Water Consumption Design Capacity of Make up Water System Design Capacity of Inlet Cooling System Design Cooling Water Temperature ( 0 C) Back Pressure Steam flow at super heater outlet under BMCR condition (tons/hr) Steam Pressure at super heater outlet under BMCR condition) (kg/Cm 2) Steam Temperature at super heater outlet under BMCR condition (0C) Steam Temperature at Reheater outlet at BMCR condition ( 0 C) Design / Guaranteed Boiler Efficiency (%) 4 Design Fuel with and without Blending of 96 DELHI GAZETTE : EXTRAORDINARY [PART III] domestic/imported coal . Type of Cooling Tower Type of cooling system 5 Type of Boiler Feed Pump 6 Fuel Details 7 -Primary Fuel -Secondary Fuel -Alternate Fuels Special Features/Site Specific Features 8 Special Technological Features 9 Environmental Regulation related features 10 Any other special features 1: At Turbine MCR condition. 2: with 0% (Nil) make up and design Cooling water temperature 3: at TMCR output based on gross generation, 0% (Nil) makeup and design Cooling water temperature. 4: With Performance coal based on Higher Heating Value (HHV) of fuel and at BMCR) out put 5: Closed circuit cooling, once through cooling, sea cooling, natural draft cooling, induced draft cooling etc. 6: Motor driven, Steam turbine driven etc. 7: Coal or natural gas or Naptha or lignite etc. 8: Any site specific feature such as Merry-Go-Round, Vicinity to sea, Intake /makeup water systems etc. scrubbers etc. Specify all such features 9: Any Special Technological feature like Advanced class FA technology in Gas Turbines, etc. 10: Environmental Regulation related features like FGD, ESP etc., Note 1: In case of deviation from specified conditions in Regulation, correction curve of manufacturer may also be submitted. Note 2: Heat Balance Diagram has to be submitted along with above information in case of new stations. Note 3: The Terms – MCR, BMCR, HHV, Performance coal, are as defined in CEA Technical Standards for Construction of Electric Plants and Electric Lines Regulations – 2010 notified by the Central Electricity Authority Note 4: The copy of Certificate shall be submitted (Petitioner) [PART III] DELHI GAZETTE : EXTRAORDINARY 97

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 2 of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.