LawGrids logoLAWGRIDS.ORG

Form 20, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: Form-20

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 20

Text of form 20

Form-20

Form-20 (Rs. Cr.) Category Status Previous Year Current Year Y1 Y2 Y3 Y4 Y5 Y6 Y7 EHV Schemes Submission No of Schemes Cost in RsCrs Approval No of Schemes Cost in RsCrs Distribution Schemes Submission No of Schemes Cost in RsCrs Approval No of Schemes Cost in RsCrs Other Schemes Submission No of Schemes Cost in RsCrs Approval No of Schemes Cost in RsCrs Deposit Schemes Submission No of Schemes Cost in RsCrs Approval No of Schemes Cost in RsCrs Total Submission No of Schemes Cost in RsCrs Approval No of Schemes Cost in RsCrs Total Schemes % Approval (Cost Only) *This contains IT & Communication DPR & Meters & Accessories District-wise AT&C Losses F o rm 2 1 S l. N o . Particul ars Actual (Previous Year) Estimated (Current Year) Projected (Ensuing Year) 86 DELHI GAZETTE : EXTRAORDINARY [PART III] E n erg y In p u t (M U ) E n erg y B illed to th e C o n su m ers (M U ) D istrib u tio n L o ss (M U ) A m o u n t B illed (R s C r) A v era g e B illin g R a te (R s / U n it) A m o u n t R ea lized (R s/C r) A v era g e R ea liza tio n ra te (R s / U n it) U n its R ea lized (M U ) A T & C L o ss (% ) E n erg y In p u t (M U ) E n erg y B illed to th e C o n su m ers (M U ) D istrib u tio n L o ss (M U ) A m o u n t B illed (R s C r) A v era g e B illin g R a te (R s / U n it) A m o u n t R ea lized (R s/C r) A v era g e R ea liza tio n ra te (R s / U n it) U n its R ea lized (M U ) A T & C L o ss (% ) E n erg y In p u t (M U ) E n erg y B illed to th e C o n su m ers (M U ) D istrib u tio n L o ss (M U ) A m o u n t B illed (R s C r) A v era g e B illin g R a te (R s / U n it) A m o u n t R ea lized (R s/C r) A v era g e R ea liza tio n ra te (R s / U n it) U n its R ea lized (M U ) A T & C L o ss (% ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Projection of Sales, Customers & Connected load for metered consumers Form No: F22 S. No Category PY CY EY Actual Estimated Projection Sales (MU) No. of Consumers Connected Load (MW) Projection of Sales (MU) Projection of no. of Consumers Projection of Connected Load (MW) Projection of Sales (MU) Projection of no. of Consumers Projection of Connected Load (MW) 1 Domestic 1.1 Domestic 1.1.1 Upto 2 KW Connected Load Slab wise 1.1.2 Between 2 KW to 5 KW Connected Load Slab wise 1.1.3 Above 5 KW Connected Load Slab wise 1.2 Single Delivery Point on 11 KV CGHS Slab wise 1.3 Hospital 1.4 Worship 1.4 DVB Staff 1.5 Misuse (Domestic) [PART III] DELHI GAZETTE : EXTRAORDINARY 87 1.6 Theft (Domestic) 2 Non Domestic 2.1 Non Domestic Low Tension Slab wise 2.2 Non Domestic High Tension (NDHT) 2.3 Misuse (Non Domestic) 2.4 Theft (Non Domestic) 3 Industrial 3.1 Small Industrial Power (SIP) Slab wise 3.2 Industrial Power on 11kV SPD for SIP Group 3.3 Large Industrial Power (LIP) 3.4 Misuse (Industrial) 3.5 Theft (Industrial) 4 Agriculture 4.1 Agriculture 4.2 Misuse (Agriculture) 4.3 Theft (Agriculture) . 5 Mushroom Cultivation 5.1 Mushroom Cultivation 5.2 Misuse (Mushroom Cultivation) 5.3 Theft (Mushroom Cultivation) 6 Public Lighting 6.1 Street Light (Metered) 6.2 Street Light (Unmetered) 6.3 Signals & Blinkers (Metered) 6.4 Signals & Blinkers (Unmetered) 7 Delhi Jal Board (DJB) 7.1 DJB-Supply at LT Slab wise 7.2 DJB (Supply at 11 KV and above) 8 Delhi International Airport Limited (DIAL) 88 DELHI GAZETTE : EXTRAORDINARY [PART III] 9 Railway Traction 10 DMRC supply Voltage wise 11 Temporary Supply 11.1 for the Period of 11.1.a Less than 16 Days 11.1.b More than or Equal to 16 Days 11.2 For Residential Cooperative group husing connections and other residential connections 11.3 For religious functions of traditional and established characters and cultural activities 11.4 For major construction projects 11.5 For threshers 11.5.a During the threshing season for 30 days 11.5.b For extended period 12 Advertisement and Hoardings 13 Self Consumption 14 TOTAL Revenue from Proposed Tariff & Charges Form F-23 S. No Particulars Ensuing Year (FY 2015-16) Consumers (Nos.) Connected Load (KW) Sales (MU) Fixed Charges (Rs/kW)* Variable Charges (Rs/Kwh)* Revenue from Fixed Charges (Rs. Crs.) Revenue from Variable Charges (Rs. Crs.) Total Revenue (Rs. Crs.) 1 Domestic 1.1 Domestic 1.1.1 Upto 2 KW Connected Load Slab wise 1.1.2 Between 2 KW to 5 KW Connected Load Slab wise 1.1.3 Above 5 KW Connected Load Slab wise 1.2 Single Delivery Point on 11 KV CGHS Slab wise 1.3 Hospital 1.4 Worship 1.4 DVB Staff 1.5 Misuse (Domestic) 1.6 Theft (Domestic) 2 Non Domestic 2.1 Non Domestic Low Tension Slab wise 2.2 Non Domestic High Tension (NDHT) 2.3 Misuse (Non Domestic) 2.4 Theft (Non Domestic) [PART III] DELHI GAZETTE : EXTRAORDINARY 89 3 Industrial 3.1 Small Industrial Power (SIP) Slab wise 3.2 Industrial Power on 11kV SPD for SIP Group 3.3 Large Industrial Power (LIP) 3.4 Misuse (Industrial) 3.5 Theft (Industrial) 4 Agriculture 4.1 Agriculture 4.2 Misuse (Agriculture) 4.3 Theft (Agriculture) . 5 Mushroom Cultivation 5.1 Mushroom Cultivation 5.2 Misuse (Mushroom Cultivation) 5.3 Theft (Mushroom Cultivation) 6 Public Lighting 6.1 Street Light (Metered) 6.2 Street Light (Unmetered) 6.3 Signals & Blinkers (Metered) 6.4 Signals & Blinkers (Unmetered) 7 Delhi Jal Board (DJB) 7.1 DJB-Supply at LT Slab wise 7.2 DJB (Supply at 11 KV and above) 8 Delhi International Airport Limited (DIAL) 9 Railway Traction 10 DMRC supply Voltage wise 11 Temporary Supply 11.1 for the Period of 11.1.a Less than 16 Days 11.1.b More than or Equal to 16 Days 11.2 For Residential Cooperative group husing connections and other residential connections 11.3 For religious functions of traditional and established characters and cultural activities 11.4 For major construction projects 11.5 For threshers 11.5.a During the threshing season for 30 days 11.5.b For extended period 12 Advertisement and Hoardings 13 Self Consumption 14 TOTAL 90 DELHI GAZETTE : EXTRAORDINARY [PART III] TARIFF FILING FORMS (GENERATING STATIONS) FOR DETERMINATION OF TARIFF Checklist of Forms and other information/ documents for tariff filing for Generating Stations Form No. Title of Tariff Filing Forms (Generating Stations)

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is form 20 of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.