Form 20, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: Form-20
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Form 20
Text of form 20
Form-20
Form-20
(Rs. Cr.)
Category Status Previous Year Current
Year
Y1 Y2 Y3 Y4 Y5 Y6 Y7
EHV Schemes Submission No of Schemes
Cost in RsCrs
Approval No of Schemes
Cost in RsCrs
Distribution Schemes Submission No of Schemes
Cost in RsCrs
Approval No of Schemes
Cost in RsCrs
Other Schemes Submission No of Schemes
Cost in RsCrs
Approval No of Schemes
Cost in RsCrs
Deposit Schemes Submission No of Schemes
Cost in RsCrs
Approval No of Schemes
Cost in RsCrs
Total Submission No of Schemes
Cost in RsCrs
Approval No of Schemes
Cost in RsCrs
Total Schemes % Approval (Cost Only)
*This contains IT & Communication DPR & Meters &
Accessories
District-wise AT&C Losses
F
o
rm
2
1
S
l. N
o
.
Particul
ars
Actual (Previous Year) Estimated (Current Year) Projected (Ensuing Year)
86 DELHI GAZETTE : EXTRAORDINARY [PART III]
E
n
erg
y
In
p
u
t (M
U
)
E
n
erg
y
B
illed
to
th
e C
o
n
su
m
ers
(M
U
)
D
istrib
u
tio
n
L
o
ss (M
U
)
A
m
o
u
n
t B
illed
(R
s C
r)
A
v
era
g
e B
illin
g
R
a
te (R
s / U
n
it)
A
m
o
u
n
t R
ea
lized
(R
s/C
r)
A
v
era
g
e R
ea
liza
tio
n
ra
te (R
s / U
n
it)
U
n
its R
ea
lized
(M
U
)
A
T
&
C
L
o
ss (%
)
E
n
erg
y
In
p
u
t (M
U
)
E
n
erg
y
B
illed
to
th
e C
o
n
su
m
ers
(M
U
)
D
istrib
u
tio
n
L
o
ss (M
U
)
A
m
o
u
n
t B
illed
(R
s C
r)
A
v
era
g
e B
illin
g
R
a
te (R
s / U
n
it)
A
m
o
u
n
t R
ea
lized
(R
s/C
r)
A
v
era
g
e R
ea
liza
tio
n
ra
te (R
s / U
n
it)
U
n
its R
ea
lized
(M
U
)
A
T
&
C
L
o
ss (%
)
E
n
erg
y
In
p
u
t (M
U
)
E
n
erg
y
B
illed
to
th
e C
o
n
su
m
ers
(M
U
)
D
istrib
u
tio
n
L
o
ss (M
U
)
A
m
o
u
n
t B
illed
(R
s C
r)
A
v
era
g
e B
illin
g
R
a
te (R
s / U
n
it)
A
m
o
u
n
t R
ea
lized
(R
s/C
r)
A
v
era
g
e R
ea
liza
tio
n
ra
te (R
s / U
n
it)
U
n
its R
ea
lized
(M
U
)
A
T
&
C
L
o
ss (%
)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Projection of Sales, Customers & Connected load for metered consumers
Form No:
F22
S. No Category PY CY EY
Actual Estimated Projection
Sales
(MU)
No. of
Consumers
Connected
Load
(MW)
Projection
of Sales
(MU)
Projection
of no. of
Consumers
Projection
of
Connected
Load
(MW)
Projection
of Sales
(MU)
Projection
of no. of
Consumers
Projection
of
Connected
Load
(MW)
1 Domestic
1.1 Domestic
1.1.1 Upto 2 KW Connected
Load
Slab wise
1.1.2 Between 2 KW to 5 KW
Connected Load
Slab wise
1.1.3 Above 5 KW Connected
Load
Slab wise
1.2 Single Delivery Point on
11 KV CGHS
Slab wise
1.3 Hospital
1.4 Worship
1.4 DVB Staff
1.5 Misuse (Domestic)
[PART III] DELHI GAZETTE : EXTRAORDINARY 87
1.6 Theft (Domestic)
2 Non Domestic
2.1 Non Domestic Low
Tension
Slab wise
2.2 Non Domestic High
Tension (NDHT)
2.3 Misuse (Non Domestic)
2.4 Theft (Non Domestic)
3 Industrial
3.1 Small Industrial Power
(SIP)
Slab wise
3.2 Industrial Power on
11kV SPD for SIP Group
3.3 Large Industrial Power
(LIP)
3.4 Misuse (Industrial)
3.5 Theft (Industrial)
4 Agriculture
4.1 Agriculture
4.2 Misuse (Agriculture)
4.3 Theft (Agriculture)
.
5 Mushroom Cultivation
5.1 Mushroom Cultivation
5.2 Misuse (Mushroom
Cultivation)
5.3 Theft (Mushroom
Cultivation)
6 Public Lighting
6.1 Street Light (Metered)
6.2 Street Light (Unmetered)
6.3 Signals & Blinkers
(Metered)
6.4 Signals & Blinkers
(Unmetered)
7 Delhi Jal Board (DJB)
7.1 DJB-Supply at LT
Slab wise
7.2 DJB (Supply at 11 KV
and above)
8 Delhi International
Airport Limited (DIAL)
88 DELHI GAZETTE : EXTRAORDINARY [PART III]
9 Railway Traction
10 DMRC supply Voltage
wise
11 Temporary Supply
11.1 for the Period of
11.1.a Less than 16 Days
11.1.b More than or Equal to 16
Days
11.2 For Residential Cooperative group husing connections and other residential connections
11.3 For religious functions of traditional and established characters and cultural activities
11.4 For major construction
projects
11.5 For threshers
11.5.a During the threshing
season for 30 days
11.5.b For extended period
12 Advertisement and
Hoardings
13 Self Consumption
14 TOTAL
Revenue from Proposed Tariff & Charges
Form
F-23
S. No Particulars Ensuing Year (FY 2015-16)
Consumers
(Nos.)
Connected
Load
(KW)
Sales
(MU)
Fixed
Charges
(Rs/kW)*
Variable
Charges
(Rs/Kwh)*
Revenue
from
Fixed
Charges
(Rs.
Crs.)
Revenue
from
Variable
Charges
(Rs.
Crs.)
Total
Revenue
(Rs.
Crs.)
1 Domestic
1.1 Domestic
1.1.1 Upto 2 KW Connected Load
Slab wise
1.1.2 Between 2 KW to 5 KW Connected Load
Slab wise
1.1.3 Above 5 KW Connected Load
Slab wise
1.2 Single Delivery Point on 11 KV CGHS
Slab wise
1.3 Hospital
1.4 Worship
1.4 DVB Staff
1.5 Misuse (Domestic)
1.6 Theft (Domestic)
2 Non Domestic
2.1 Non Domestic Low Tension
Slab wise
2.2 Non Domestic High Tension (NDHT)
2.3 Misuse (Non Domestic)
2.4 Theft (Non Domestic)
[PART III] DELHI GAZETTE : EXTRAORDINARY 89
3 Industrial
3.1 Small Industrial Power (SIP)
Slab wise
3.2 Industrial Power on 11kV SPD for SIP Group
3.3 Large Industrial Power (LIP)
3.4 Misuse (Industrial)
3.5 Theft (Industrial)
4 Agriculture
4.1 Agriculture
4.2 Misuse (Agriculture)
4.3 Theft (Agriculture)
.
5 Mushroom Cultivation
5.1 Mushroom Cultivation
5.2 Misuse (Mushroom Cultivation)
5.3 Theft (Mushroom Cultivation)
6 Public Lighting
6.1 Street Light (Metered)
6.2 Street Light (Unmetered)
6.3 Signals & Blinkers (Metered)
6.4 Signals & Blinkers (Unmetered)
7 Delhi Jal Board (DJB)
7.1 DJB-Supply at LT
Slab wise
7.2 DJB (Supply at 11 KV and above)
8 Delhi International Airport Limited (DIAL)
9 Railway Traction
10 DMRC supply Voltage wise
11 Temporary Supply
11.1 for the Period of
11.1.a Less than 16 Days
11.1.b More than or Equal to 16 Days
11.2 For Residential Cooperative group husing connections and other residential connections
11.3 For religious functions of traditional and established characters and cultural activities
11.4 For major construction projects
11.5 For threshers
11.5.a During the threshing season for 30 days
11.5.b For extended period
12 Advertisement and Hoardings
13 Self Consumption
14 TOTAL
90 DELHI GAZETTE : EXTRAORDINARY [PART III]
TARIFF FILING FORMS (GENERATING STATIONS) FOR DETERMINATION OF TARIFF
Checklist of Forms and other information/ documents for tariff filing for
Generating Stations
Form No. Title of Tariff Filing Forms (Generating Stations)
Previous and next