LawGrids logoLAWGRIDS.ORG

Appendix 1, Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017: APPENDIX-1

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 - Appendix 1

Text of appendix 1

APPENDIX-1

APPENDIX-1 DEPRECIATION SCHEDULE Sr. No. Asset Particulars Useful Life (years) Depreciation Rate for 12 years Depreciation Rate Beyond 12 years till Useful Life A B C=[90%-(12*B)]/ (A-12) 1 Land owned under full title Infinity 2 Land held under lease (A) For investment in land The period of lease or the period remaining unexpired on the Assignment of the lease Rate based on the period of lease (B) For cost of clearing site The period of lease remaining unexpired at the date of clearing the site [PART III] DELHI GAZETTE : EXTRAORDINARY 69 Sr. No. Asset Particulars Useful Life (years) Depreciation Rate for 12 years Depreciation Rate Beyond 12 years till Useful Life A B C=[90%-(12*B)]/ (A-12) 3 Assets Purchased New Depreciation Rate shall be computed based on the balance depreciable value spread over remaining Useful Life of asset (A) Plant and machinery in generating stations including plant foundations (i) Steam-electric NHRS & Waste Heat Recovery Boilers / Plants 25 5.83 (ii) Diesel electric & Gas plant 25 5.83 (B) Cooling towers and circulating water systems 25 5.83 (C) Buildings (i) Offices, showrooms and residential buildings 50 1.80 (ii) Buildings other than Offices & showrooms 30 3.00 (III) Temporary erection such as wooden structures 0 100 Depreciation Rate shall be computed based on the balance depreciable value spread over remaining Useful Life of asset (IV) Roads other than Kutcha roads 50 1.80 (V) Others 30 3.00 (D) Transformers, Kiosk, sub-station equipment & other fixed apparatus (including plant foundations) 25 5.83 (E) Switchgear including cable connections 25 5.83 (F) Lightning arrestor (i) Station type 25 5.83 (ii) Pole type 25 5.83 (iii) Synchronous condenser 25 5.83 (G) Batteries 5 18.00 (H) Underground cable including joint boxes and disconnected boxes 35 5.83 (I) Overhead lines including cable supports 25 5.83 (j) Meters 15 6.00 (K) Vehicles 10 9.00 (L) Air Conditioning Plants (i) Static 25 5.83 (ii) Portable 10 9.00 (M) Office furniture and related equipments 10 9.00 (N) Communication equipment (i) Radio and high frequency carrier system 15 6.00 (ii) Telephone lines, Fibre Optic and telephones 15 6.00 (O) I. T Equipment including software (salvage value for IT equipment and software shall be considered as NIL and 100% value of the assets shall be considered depreciable) 6 16.67 Depreciation Rate shall be computed based on the balance depreciable value spread over remaining Useful Life of asset Any other assets not covered above As per Companies Act 2013 amended from time to time. Note: The useful life for AC & DC substations and Gas Insulated Sub-station including switchgears for which Notice Inviting Tender is floated on or after 01.02.2017 shall be considered as 35 years. 70 DELHI GAZETTE : EXTRAORDINARY [PART III]

Previous and next

All provisions of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017

Questions people ask

Is appendix 1 of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 still in force?

No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2017 is recorded.