Form R-1, Rajasthan Real estate Regulatory authority Regulations 2017: FORM R-1
Rajasthan Real estate Regulatory authority Regulations 2017 - Form R-1
Text of form R-1
FORM R-1
FORM R-1
[see Regulation 3(4)]
: CERTIFICATE BY ARCHITECT
/ (To be uploaded by the Promoter on his webpage on the RERA website before
withdrawal ofmoney from separate account)
To,
The —_——________— (Name & Address of Promoter),
Subject: Certificate of percentage of completion of construction work of
Puilding(s) of the-—————Phase of the Project (RERA Registration Number
) situated on the Plot hearing No. ————— demarcaicd by its
boundaries (latitude and longitude of the end points} — to the North —
te the South ———— to the East —————- to the West
village —————— Tehsil ————————_ District ——————_ PIN ————
—— admeasuring —-———_——— sq.mts. Area being developed by.
[Promoter’s Name]
Sir,
I/ We ————————_ have undertaken assignment as Architect of certifying,
percentage of completion of construction work of the —-———————_ Building(s) of the
Phase of the Project, situated on the plot bearing No. village —
Tehsil ————— District —————-_ PIN ——————_— admeasuring
sq.mts. Area being developed by ————— [Promoter’s Name]
1. Based on site inspection, with respect to each of the Building of the aforesaid Real
Estate Project , 1 certify that as on the date ————, the percentage of work done for
each of the building of the Real Estate Project (registration number————— under
Rajasthan RERA), is as per TABLE-A herein below. The percentage of the work
executed with respect to each of the activity of the entire phase is detailed in TABLE-B.
TABLE-A
Building Number (to be prepared separately for each Building of the Project)
Sie Tasks /Activity Percentage of work
No. done(Approximately)
@) | @) (3)
1 Excavation
QO i eeecee ees nuinber of Basement(s) and Plinth
3 Stilt Floor
4 Percenumber of Slabs of Super Structure
5 |Internal Walls, Internal Plaster, Floorings within
Flats/Premises, Doors and Windows to each of the Flat/
Premises.
6 | Sanitary Fittings within the Flat/Premises, Electrical Fittings
within the Flat/Premises.
7 | Staircases, Lifts Wells and Lobbies at each Floor level
connecting Staircases and Lifts, Overhead and Underground
Water Tanks.
8 |The external plumbing and external plaster. elevation,
| completion of terraces with waterproofing of the Building/
10
Wing.
9 | Installation of lifts, water pumps, Fire Fighting Fittings and
, Equipment as per CFO NOC, Electrical fittings to Common
if Areas, electro, mechanical equipment, Compliance to
conditions of environment /CRZ NOC, Finishing to entrance
lobby/s, plinth protection, paving of areas appurtenant to
Buiiding, Compound Wall and all other requirements as may
be required:to obtain Completion Certificate.
TABLE-B
Internal and External Development Works in respect of the entire Registered
Phase/Project.
Sr. Common areas and Propos< Percentage Details
No. Facilities/Amenities (Yes/No) of Work
: done
Q) 2) @) (4) (3)
1 Internal Roads & Footpaths. :
2 Water Supply
3 Sewerage (chamber, lines, Septic Tank ,
STP):
Storm Water Drains
Landscaping& Tree Planting.
Community Buildings
4
5
6 Street Lighting
ih
8 Treatment and disposal of sewage and
sullage water.
9 Solid Waste management & Disposal.
10 Water conservation, Rain water harvesting.
11 Energy management ‘
12 __| Fire protection and fire safety requirements
13) Electrical meter room, sub-station,
receiving station:
14 __| Others ( Option to Add more).
Yours Faithfully,
Signature & Name
(IN BLOCK LETTERS) of
Architect
(Address i .c1-05.-2 )
Place:
Date:
11
Previous and next
All provisions of Rajasthan Real estate Regulatory authority Regulations 2017
Questions people ask
Is form R-1 of Rajasthan Real estate Regulatory authority Regulations 2017 still in force?
No repeal of Rajasthan Real estate Regulatory authority Regulations 2017 is recorded.