Rule 9, Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.: Utilisation of hazardous and other wastes
Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. - Rule 9
Text of rule 9
Utilisation of hazardous and other wastes
9. Utilisation of hazardous and other wastes.- (1) The utilisation of hazardous and other
wastes as a resource or after pre-processing either for co-processing or for any other use,
including within the premises of the generator (if it is not part of process), shall be carried out only
after obtaining authorisation from the State Pollution Control Board in respect of waste on the
basis of standard operating procedures or guidelines provided by the Central Pollution Control
Board.
(2) Where standard operating procedures or guidelines are not available for specific utilisation,
the approval has to be sought from Central Pollution Control Board which shall be granting
approval on the basis of trial runs and thereafter, standard operating procedures or guidelines
shall be prepared by Central Pollution Control Board:
Provided, if trial run has been conducted for particular waste with respect to particular
utilisation and compliance to the environmental standards has been demonstrated, authorisation
may be granted by the State Pollution Control Board with respect to the same waste and
utilisation, without need of separate trial run by Central Pollution Control Board and such cases of
successful trial run, Central Pollution Control Board shall intimate all the State Pollution Control
Board regarding the same.
(3) No trial runs shall be required for co-processing of waste in cement plants for which guidelines
by the Central Pollution Control Board are already available; however, the actual users shall
8
ensure compliance to the standards notified under the Environment (Protection) Act,1986 (29 of
1986), for cement plant with respect to co-processing of waste:
Provided that till the time the standards are notified, the procedure as applicable to other
kind of utilisation of hazardous and other waste, as enumerated above shall be followed.
Previous and next
← Rule 8Storage of hazardous and other wastesRule 10 →Standard Operating Procedure or guidelines for actual users
All provisions of Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.