Rule 3, Construction and Demolition Waste Management Rules, 2016: Transportation
Construction and Demolition Waste Management Rules, 2016 - Rule 3
Text of rule 3
Transportation
3. Transportation -------------------------------------------------
Existing Actually Required/Proposed number
-------------------------------------------------
Truck :
Truck-Hydraulic :
Tractor-Trailer :
Dumper-placers :
Tricycle :
13
Refuse-collector :
Others (Please specify) :
4. Whether any proposal has been made to improve Construction and Demolition waste
management practices
5. Have any efforts been made to involve PPP for processing of Construction & Demolition waste :
If yes, what is (are) the technologies being used, such as:
--------------------------------------------------------------------------------------------------
Processing / recycling Steps taken
Technology (Quantity to be processed)
-------------------------------------------------------------------------------------------------
Dry Process :
Wet Process :
Others, if any,
Please specify :
6. What provisions are available to check unauthorized operations of:
Encroachment on river bank or wet bodies :
Unauthorized filling of low line areas :
Mixing with solid waste :
Encroachment in Parks, Footpaths etc. :
7. How many slums are provided with construction and demolition waste receptacles facilities:
8. Are municipal magistrates appointed
for taking penal action for non-compliance with these rules: Yes No
[ If yes, how many cases registered & settled during last three years (give year wise details)]
Dated: Signature of Municipal
Commissioner
Form –IV
See [Rule (8)(3)]
Format of Annual Report to be submitted by the State Pollution Control Board / Committees to the
Central Pollution Control Board
To,
The Chairman,
Central Pollution Control Board,
PariveshBhawan, East Arjun Nagar,
Delhi-110032
14
1. Name of the State/Union territory :
2. Name & address of the State
Pollution Control Board/Pollution
Control Committee :
3. Number of municipal authorities
responsible for management of municipal
solid wastes in the State/Union territory
under these rules :
4. A Summary Statement on progress made
by municipal authorities in respect of
implementation of Schedule III] : Please attach as Annexure-I
5. A Summary Statement on progress made by
municipal authorities in respect of
implementation of Schedule IV : Please attach as Annexure-II
Date: Chairman or the Member Secretary
State Pollution Control Board/
Place: Pollution Control Committee
Form –V
See [ Rule14]
Accident reporting
1. Date and time of accident :
2. Sequence of events leading to accident :
3. The type of construction and demolition waste involved in accident :
4. Assessment of the effects of the accidents
a. on traffic, drainage system and the environment :
5. Emergency measures taken :
6. Steps taken to alleviate the effects
a. of accidents :
7. Steps taken to prevent the recurrence
a. of such an accident :
8. Regular monthly health checkup of workers at
15
a. Processing / recycling site shall be made
9. Any accident during the collection,
a. transportation and treatment including
b. processing and recycling should be informed
c. to the Competent Authority (Local Authority) or
d. Prescribed Authority
Date : Authorized Signatory
Place: Designation
[18-6/2014-HSMD]
Bishwanath Sinha, Joint Secretary
Previous and next
All provisions of Construction and Demolition Waste Management Rules, 2016
Questions people ask
Is rule 3 of Construction and Demolition Waste Management Rules, 2016 still in force?
No repeal of Construction and Demolition Waste Management Rules, 2016 is recorded.