Rule 58, MP Investment Region Development and Management Rules 2016: Additional provisions for buildings with height above 12.5 meters
MP Investment Region Development and Management Rules 2016 - Rule 58
Text of rule 58
Additional provisions for buildings with height above 12.5 meters
58. Additional provisions for buildings with height above 12.5 meters. -
(1) Planning Norms for the buildings having height above 12.5 meters
and up to 30 meters shall be as given in Table No 4.
Sr
No.
(1)
1.
2.
3.
"l{~ ~. ~ 14 i:rr;:f 2016 222 (211)
TABLENo.4 .
[See rule 58(1 )]
DEVELOPMENTNORMSFORPLOTS/LANDSONWHICH
BUILDING(S) WfnIHEIGHf ABOVE 12.S M AND UPTO 30 MIS_
PROPOSED:
Road Minimum Frontage FAR_ Ground Building Front Sides/
Width plot/ laµd (in meters Coverage Height M.O.S Rear
(in
.
in (in meters) • 'in MOS area \.
meters) ( in oercentage meters) (in meters)
Sq.m.)
(2) (3) (4) (5) (6) . (7) (8) (9)
12m 1000 sq.m 18m 1:1.50 30 Upto 18 7.5 6.0
and meter
above
18m & 1500 sqm 21 m 1:1.75 30 Upto24 9.0 6.0
above
24m 2000 sqm 30m 1:2.00 30 Upto30 12.0m 7.5m
~d meter
above
Note: Where • the use premises is commercial, the grourid coverage
mentioned in column 6 above shall be read as 40.
(2) For High Rise Buildings as defined in rule 2(38):· For high rise
building Planning Norms shall be as given in Table No 5.
s ..
No.
(1)
1.
TABLENo.S
[See rule-58 (2) above]
DEVELOPMENT NORMS FOR PLOTS/ LANDS ON wmcH
IDGH RISE BUILDING(S) IS PROPOSED
Road Min. Frontage FAR Ground Building M.O.S front MOS
width plot/land in meters Coverage in Height side in sides/
in size (area % in meters rear
meters in Sq.M.) meters
(2) (3) (4) (5) (6) (7) (8) (9)
30m 2500 30m 1:2.25 30 Upto45 15.00 m 7.5m
and meters
above
222 (212) l=j'~ ~. ~ 14 l=Jft:f 2016
s. Road Min. Frontage FAR Ground Building M.O.Sfron1 MOS
No. width plot/land in meters Coverage in ·Height side in sides/
in size (area % in meters rear
meters in Sq. M.) meters
(1) (2) (3) • (4) (5) (6) (7) (8) (9)
2. 36m 3000 40m 1:2.50 30 Upto60 18.00 m 9.0m
~d meters
above
~. ~Sm 3500 45m 1:2.75 30 . Upto-75 21.0m 9.0m
and meters
above
4. 60m 4000 50m 1:3.0 30 Upto90 24.00 10m
and meters
above
5. 75m 4500 60m 1:3.0 30. above90 30.00 12m
and meters
above
(3) For building having height more than 12.5 meters the necessary drawings
and details shall be submitted to the Agency incorporating all the fire
fighting measures recommended in National Building Code Part-IV.
The occupancy permit shall be issued only after ensuring that all fire
fighting measures are physically in place.
(4) For ·all high rise buildings site clearance under sub-rule (2) of Rule 18.
shall be necessary. After site clearance by. the committee composite
building permission from-the Agency shall be necessary.
( 5) The approach to the building and. open spaces on its all sides shall be as
hard as is required to bear the weight of fire engine. The said open §pace
shall be kept free of obstruction and shall be motor-able. •
( 6) Main entrance to the plot shall be of adequate width to allow easy access
to the fire engine and·in no case it shall measure less than 6.0 meters. The
entrance gate shall fold back against the compound wall of the premises,
thus leaving the exterior access way within the plot free for movement of
fire service vehicles. If the main entrance at the boundary wall is built
over, the minimum clearance shall be 4.5 mete.rs.
590 Cul-De-Sacs.- Cul-de-sacs giving access to plots will be allowed
provided that cul-de-sacs would be permissible only on straight roads and
the turning space shall not be less than 121 square meters in area with no
dimension being less than 11 meters.
Previous and next
← Rule 57Additional provisions for buildings other than residential buildings . For building other than residential buildings the following additional provisions of means of access shall be ensuredRule 60 →Alley
All provisions of MP Investment Region Development and Management Rules 2016