Rule 30, MP Investment Region Development and Management Rules 2016: Licensing of Engineer, etc
MP Investment Region Development and Management Rules 2016 - Rule 30
Text of rule 30
Licensing of Engineer, etc
30. Licensing of Engineer, etc:-(1) The Agency may issue licenses in form
VII to the .. structural Engineers, Engineers, Supervisors· and Town
Planner, who possess the minimum qualifications as laid down in sub
. rule (2).
(2) The minimum Qualification prescribed for the issue of license to an
Engineer etc. is given in column (2) :-
Designation
(1)
1. Architect
2. Structural
Engineer
3. Engineer
4. Supervisor
Minimum Qualification
(2)
An architect, who is duly registered with the
council of Architect under the Architects Act,
1972. Such Architect shall not require any separate
license from Agency.
Graduate in Civil Engineering of recognized Indian
or Foreign University and/ or Chartered Engineer
or Associate Member m Civil Engineering
Division of Institution of. Engineers (India) or
equivalent Overseas Institution with three years •
experience in Structural Engineering practice with
designing and field work:
Provided that the three years experience shall be
relaxed to,-
( a) two years in case of post-graduate degree of
recognized Indian or Foreign University with
branch of Structural Engineering;
(b) one year m case of Doctorate. in Structural
Engineering.
The Corporate Membership (Civil) of the
Institution of Engineers (India) or such Degree or
.Diploma • in Civil, Municipal or Structural
Engineering which makes him eligible for such
membership.
(a) three years Architectural Assistantship or
Intermediate in Architecture or Diploma in Civil
Engineering with two years experience under an
Architect or an Engineer; or,
222 (192) i:r~ ~. ~ 14 i:rri:l 2016
Designation Minimum Qualification
(1) (2)
(b) draftsman in Civil Engineering from Industrial
Training Institute with five years of experience
under an Architect or an Engineer.
5. Town Planner Graduate in Architecture or Civil engineering ·or·
physical planning with post graduation in To~
Planning or Urban Planning or Regional Planning
or Housing Planning or Transport Planning or
Urban Design or Landscaping Architecture
(3) Any person desirous of getting a license under this rule shall apply
to the Agency with attested copies of certificates on which the claim
is based and also receipt in token of payment of license fees:-
(i) certificates on which the claim is based; and
(ii) receipt in token of payment of license fee.
(4) The Agency· granting a license shall maintain a register entering
therein the details of the person to whom license is issued .or
renewed.
( 5) The license shall be valid permanently unless_ cancelled by the
Agency.
(6) Fee - • The fee for grant of license shall be as under:-
1- Structural Engineer, Engineer and Town planner Rs. 1500.00
_ 2- Supervisor Rs. 750.00
3 - Group or Agency Rs. 3600.00
(7) A license may be ren~wed for similar period after the expiry of the
period of the original license on payment of fee prescribed in sul?
rule (6).
(8)
(9)
Licensee shall work in accordance with the terms of his license.
An Architect or a licensed Structural engineer/ Engineer/
Supervisor/ Town Planner shall be competent to perform the duties
indicated herein below.
(A) Architect-Competence.-An Architect who is registered
with the council shall be competent to carryout work related
to the permission for building and shall be entitled to
submit:-
(i) all plans and information connected with permission for
~ ~. ~ 14 +JTi:£ 2016
all building irrespective of size and height;
(ii) structural details and calculations for residential
buildings on plot up to 500 square meters and up to·
three storey's or 12.50 meters in height;
(iii) certificate of supervision and completion of all
buildings;
(iv) all plans and related information connected with
permission for development of area up to 4 hectare; and
(v) certificate of supervision for developme.ot of land area
up to 4 hectare.
(B) Structural Engineer-Competence.- The licensed Structural
Engineer shall be competent to carry out the work relating to
permission ofbuiiding, and shall be entitled to submit:-
(i) all plans and information connected with permission
for residential buildings on plots up to 500 Sq m. and
up to three stories or 12.50 m in height.
(ii) the structural details and calculation for all buildings;
(iii) certificate of supervision and completion of all
buildings;
(iv) all plans and related information connected with
permission for development of area up to one hectare;
( v) certificates of supervision for development of land area
up to one hectare.
(q En_gineer-Competence.- The licensed Engineer sh.all be
• competent to carry out the work related to the permission for
building as given below and shall be e.otitled to submit :-
(i) all plans and information connected witli residential
building on plot up to 300 sq meter and up to two
stories or 7. 5 meter in height.
(ii) structural details and calculation for all buildings on
plots up to 500 sq m and height upto four Stories
(15m);
(iii) certificate of Supervision and completion for all
buildings;
(iv) all plans and related information connected with
permission for development of area up to 1 hectare;
and
(v) certificate of supervision for development of land area
up to 1 hectare.
(D) Supervisor-competence.-The licensed Supervisor shall be
222 (193)
• 222 (194) ll~ ~, ~ 14 llRr 2016
entitled to submit:-
(i) all plans and related information connected with the
• permission for residential buildings on plots tip to 200
sq m. and up to two stories or 7.5 meters height;
(ii) certificate of supervision for buildings in (i) above .
(E) Town Planner-competence. - The licensed Town Planner
shall be entitled to submit:-
• (i) all plans and related information connected with
permission for development irrespective of the size of
land; and
(ii) certificate of supervision for development of land as in
(i) above
(F) Group ·- When a group of qualified architects, engineers,
town planners is practicing, then the qualification and
competence of work shall be equivalent to the highest
competency of individual iti the group.
Previous and next
All provisions of MP Investment Region Development and Management Rules 2016
Questions people ask
Is rule 30 of MP Investment Region Development and Management Rules 2016 still in force?
No repeal of MP Investment Region Development and Management Rules 2016 is recorded.