Rule 18, MP Investment Region Development and Management Rules 2016: Permission for development or for construction
MP Investment Region Development and Management Rules 2016 - Rule 18
Text of rule 18
Permission for development or for construction
18. Permission for development or for construction. -
(1) Development or construct1on with the permission of the Agency:
No person shall carry out any development or erect, re-erect or
make alterations or demolish any building or cause the same to be
done without obtaining a prior permission in writing in this regard
from the Agency; .
Provided that no permission shall be required for,-
(a) opening and closing of a window or door or ventilator;
(b) providing inter-communication doors;
( c) providing or removing internal partitions;
( d) providing or removing false ceilings;
( e) gardening;
(f) white washing;
(g) painting;
(h) re-tiling and repairing of roof;
(i) plastering and patch work;
G) re-flooring;
(k) constructions of sun shades on one's own land;
(l) re-erection of portions of buildings damaged by earthquake
or other natural calamities, to the same extent and
specifications as existed prior to such damage;
(m.) re-erection of portion of buildings damaged by any other
calamity, notified by the District Collector with the previous
approval of the State Government, to the same extent and
specification as existed prior to damage.
(n) carrying out works in compliance with any order or directions
made by any Agency under any law· for the time being in
force;
( o) carrying out works by any Agency in exercise of its powers
under any law for the time being in force; •
(p) any. work carried out by the Central or the State Government
or any local Agency,-
(a) required for the maintenance or improvement of a
highway, road or public street, being works carried
out on land within the boundaries of such highway,
road or public street;
(b) for the purpose of inspecting, repairing or renewing
222 (176)
(q)
(r)
(s)
(t)
(u)
l=f~ ~. ~ 14 l'.{ftf 2016
any drains, sewers, mains, pipes, cables, telephone or
other apparatus including the breaking open of any
street or other land for that purpose: •
Provided that no work which would entail
breaking open any street shall be undertaken without
prior intimation to the Agency.
the erection (including wells) made in the ordinary course of
agricultural operation. • .
the construction of a road· intended to give access to land
solely for agricultural purpose;
the normal use of land which has been used temporarily for
other purpose like marriage pandals or for festive
occasions;
in case of land, normally used for no purpose or
occasionally used for any purpose, the use of land for the
other purpose or occasions not involving permanent
diversion or diversion for substantial period.
In case of construction of boundary wall and or fencing in
order to secure the periphery of land.
(2) In the case of a high rise development and/or building permission
shall be granted by the Chief Executive Officer ( CEO ) of the
Agency, after getting site clearance from the Site Clearance
·• Committee, to be constituted by the State Government in· this .·
regard.
(3) Both the permission for development and also the permission for
building shall be necessary for commencement of building
activities involving development of land as a composite building
scheme.
19. Development/ Building • permission • issued prior to these rules -
Any permission, sanction or approval given or order passed or any action
taken or anythmg done in respect of the matters covered by these rules
under any law. or rule in force immediately before the commencement of
these rules shall be governed in accordance with the provisions of law or
rules under which such sanction or approval was given, order was. passed •
or • ariy action was taken or anything was done, as· if these rules have not
come into force:
Provided that at the time of application for renewal of such
.. permission "fresh sanction under these rules shall be required for that
part of the work which was not started and the same may be granted.
.:r~ ~, ~ 14 1-lRt 2016 222 (177)
Previous and next
All provisions of MP Investment Region Development and Management Rules 2016
Questions people ask
Is rule 18 of MP Investment Region Development and Management Rules 2016 still in force?
No repeal of MP Investment Region Development and Management Rules 2016 is recorded.