Appendix A-14, MP Investment Region Development and Management Rules 2016: APPENDIX- A-14
MP Investment Region Development and Management Rules 2016 - Appendix A-14
Text of appendix A-14
APPENDIX- A-14
APPENDIX- A-14
[See rule 97(4)]
RAINWATERHAR~TINGTHROUGHPEBBLEBED(Building
Complexes)
PEBBLE BEDOF 1.M. WIDE
AND 1 M. DEEP TRENCH
FILLED WITH 5 CM TO 7.5
CM PEBBLE
On the three sides along the inner periphery adjoining the compound wall, dig
lm. wide pit to a depth of 1.5 m. and fill it with 5 to 7.5 cm. sized pebbles let
the rain water failing on the terrace flow into this pebble bed.
i:r~ ~, ~ 14 1=frcf 2016