Rule 2, Rajasthan Electrical Inspectorate (Formation of Technical Committee and Grant of License, Competency Certificate to work and Permit to work) Rules, 2016: Definitions
Rajasthan Electrical Inspectorate (Formation of Technical Committee and Grant of License, Competency Certificate to work and Permit to work) Rules, 2016 - Rule 2
Text of rule 2
Definitions
2. Definitions.- (1) In these rules, unless the context
' otherwise require
s, o
a) "Act" means the Electr
icity Act, 2003 (Central Act N
o.
36 of 2003); f
(b) “Certificate™ means the certificate of competency
granted under these rules to wor
k as Supervisors or
Wiremen upon qualifying in the ex
amination conducted
by the Technical Committee or body/institution
appointed by the Governmen
t;
(c) “Chairperson™ ‘means the Chair
person of the Technical
Committee;
-
(& Scanned with OKEN Scanner
29(2) RIOIRIT XISi—03, 7§ 31, 2016 1 4 (1) J
(d) *Chartered Electrical Safety Engineer” means any
person authorize by the State Government under
regulation SA" of the Central Electricity Authority
(Measures relating to Safety and Electric Supply)
Regulations, 2010 to assist the owner or supplier;
(¢) “Contractor™ means Electrical contractor;
(D “EHT” means the voltage class exceeding 33 KV;
(g) “Electrical Installation Works™ means all electric work
on a new installation or work in any way altering th |
capacity or character of an existing installation, for th 4
generation, transmission, storage or distribution of )
electrical energy for all purposes in every type of
dwelling house, business premises, public building,
factory and its appurtenance, out houses and places of
public entertainment and gathering, whether supplied
from a public electrical supply undertaking or from
power plant owned by Government or from private
plant or any sources of generation whatsoever;
(h) “Form™ means<form appended to these rules;
(i) "Government" means the Government of Rajasthan;
() “HT” means the voltage class above 650 volts and upto
33 kV;
(k) “Licence” means the Licence granted to Electrical
Contractor by Technical committee under these rules;
(1) “*Member™ means Member of the Technical Committee;
(m)“Permit” means the permit granted to work as
Supervisor or Wiremen or Chartered Electrical Safety
Engineer upon meeting the qualifying criteria as
specified under these rules; y -
(n) “Fees” means the fees specified by the State
Government for issue or renewal etc. for Licence, -
Certificate and Permit from time to time; d
(0) “SCC” means Supervisor Competency Certificate
granted under these rules to work as Supervisor upon
successfully qualifying in the examination conducted
by the Technical Committee or body/institution
appointed by the Government;
(p) “Schedule”™ means schedule appended to these rules;
(q) “Secretary” means the Secretary of the Technical
Committee;
(& Scanned with OKEN Scanner
R
T 4 () ot Wel-UH, 1E 31, 2016
29(3)
(r) “Supervisor”
with competency certific
ate to wor
under these rules;
)
(s) “Technical ~ Committee™ means the
Committee constituted under th
ese rules;
means an Electrical Supervisor
granted
k or permit to w
ork
Technical
(1) “WCC” means Wiremen Competency Certificate
\ granted under these rules to
work as Wiremen upon
nducted
successfully qualifying in the examination €0
by the Technical Committee or body/institution
” appointed by the Government;
and
(u) “Wireman” means an
Electrical Workman grante
d with
competency certificate to w
ork or permit {0 work unde
r
these rules.
o : Haet
(2) Words and express
ions used in these rule
s but not defined in
these rules shall have the
same meanings as assig
ned to them in the
Act or Central Electri
city Authority (Measur
es relating to Safety
lations, 2010, as the c
ase may be:
and Electric Supply) Reg
u
* CHAPTERA
Grant of Licences, C
ompetency Certificat
es to work and
Permits to work, Eligibi
lity and Validity
nce gind éligilgilib{ conditions. Q
} T e;re
i 3, Contractor’s lic
en: ! ‘
ectrical Cot,lt'ractor‘s icence, as
shall be four classes of El
in column 2 of Sehedule”l: - s
oy %*},L’F,firea;‘ed 10,8 PR o0 o ik i that
Qi Ll o g o i
10 s bl
(& Scanned with OKEN Scanner
29(4) USRI o1, 78 31, 2016 T 4 (1)
(¢) It shall have solvency of the amount as specified in
column 5 of Schedule<l. The solvency certificate
shall be issued by the Tehsildar or Nationalized
bank mentioning the full name of contractor, firm or
company, with a validity of minimum period of five
years,
(3) The scope of eclectrical installation works that can be
undertaken by the contractor in the State of Rajasthan are given in
column 6 of Schedule-I,
Previous and next
Questions people ask
Is rule 2 of Rajasthan Electrical Inspectorate (Formation of Technical Committee and Grant of License, Competency Certificate to work and Permit to work) Rules, 2016 still in force?
No repeal of Rajasthan Electrical Inspectorate (Formation of Technical Committee and Grant of License, Competency Certificate to work and Permit to work) Rules, 2016 is recorded.