LawGrids logoLAWGRIDS.ORG

Form FOR OCCUPANCY CERTIFICATE, .lharkhand Building Bye-laws 2016: FORM FOR OCCUPANCY CERTIFICATE

.lharkhand Building Bye-laws 2016 - Form FOR OCCUPANCY CERTIFICATE

Text of form FOR OCCUPANCY CERTIFICATE

FORM FOR OCCUPANCY CERTIFICATE

FORM FOR OCCUPANCY CERTIFICATE Annexure VII - 135 - Date . Registration No .. Name . (In Block letters) Address: . Signature of Builder/Owner/Applicant Date . Registration No . Name . (In Block letters) Address: . Signature of Licensed Architect/Engineer/Supervisor Yours faithfully, with the sanctioned plan. permission accordance The construction up to plinth/column up to plinth level ha been completed in Building on/in Plot No....................... Road/Street ........................ Ward in accordance with your No dated and is m Sir, The . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Authority, To, Information for Intimation of Completion of Work up to Plinth Level Anncxure-VIII Item As Per Building Plan Remark by Yes No on I Applicable authorized applicable representative 1) Structural Safety I. Provide Design Basis Report as per the document ' 2. Provide description of Sub-structure and Super- structure as per the format given in the Ref(5&6) enclosed. 3. Provide brief Description of Structural System with sketches, images of drawing. etc. with specific focus on Lateral load resisting system'. 4. Provide brief note on modeling, software used etc. Clear mention whether infill I partition wall is idealized as part of lateral load system? 5. Provide the height of building in meters. 6. Provide plan dimensions of the building (mt x mt) EO Loadina Details 7. Provide following EQ loading details. a) Zone Factor b) Importance factor c) Response Reduction factor d) Soil Type e) % LL considered in seismic I) Time Period in the horizontal X- direction (sec) g) Time Period in the horizontal Z-direction (sec) h) Total Seismic weight (Sw) of building (kN) i) Static Base-shear in X-direction (as% of Sw) j) Static Base-shear in Z-direction (as% of Sw) k) Table of distribution for static base shear I) Max. deflection at roof level. (mm) m) Max. inter storey drift./ Height Vertical Elements Details 8. Provide following data regarding Vertical Elements. a) Size of maximum loaded column b) Gravity load on max. loaded column c) Axial stress in max. loaded column (Gravity loads) d) Grade or max. loaded column e) Axial settlement in max. loaded column f) Axial settlement in min. loaded column g) % Base-shear resisted by all columns along X (static) [ h) % Base-shear resisted by all columns along Z (static) Dynamic Analysis 9 Provide following data from Dynamic Analysis a) Total gravity load on floating column (provide table if there are multiple floating IJ) ~x - 136 - ,-r~ Checklist for Structural Safety Annexure-IX columns) b) Size and pan or girders supporting floating columns c) Number of floors upported by lloating columns d) Deflection of girder under column (from model) e) Deflection of girder under column (from s/ action) f) Specific details about floating columns on cantilevergirders (Refer Table below) 10. Provide, if applicable, following data for eachcantilever. a) Cantilever span b) Structural system c) Nature of usage d) Maximum elastic deflection under gravity loads 11. Provide stability calculations for uplift and ovcrturningfrnodcl extract in case of model) 12. Typical design calculations for footings 13. Typical design calculations for RCC columns Composite Columns 14. Typical design calculations for RCC walls 15. Typical design calculations for RC beams (Or Steel Beams) 16. Typical design calculations for RCC Girders (Or Steel Girders/Truss) 17. Typical design calculations for Steel Bracings 18. Provide a note on special provisions suggested for the building (like dampers etc.) 19. Soft copy of model including input and output. Provide following data from Dynamic Analysis Time Modes Frequency Period in X-Participation Z-Participation Sec Mode I Mode 2 Mode 3 Mode 4 Mode 5 Mode 6 Mode 7 Mode 8 Mode 9 Mode IO Mode 11 Mode 12 Mode 13 Mode 14 Mode 15 Summation Provide Table for lateral deflections (mm) at Terrace Level in the following format. Load Case Dxrnax 1--1/Dx Drift-x Dzrnax 1--1/Dz Drift-z ""\ ~ ,?/.,¢?!} - 137 - z-> Provide Corner displacements (mm) for Torsional lrregularity(along x-direction) in the following format. Load Corner- I Corner- Corner-2 Corner-4 Avg- x %Max.I Avg. Case 2 Eq-x Wl-x Provide Corner displacements (mm) for Torsional lrregularity(along z-direction) in the following format. Load Corner- I Corner- Corner- 2 Corner- 4 Avg- x % Case 2 Max.I Avg. Eq-z Wl-z Provide acceleration (rng) values in the following format. Eq-x I Eq-z I WL-x I WL-z I I I Ref 5 DESCRIPTION OF SUB-STRUCTURE No. of basement Minimum clearance between outermost basement retaining wall and compound wall Has a Shoring system been installed ? Submit sectional detai I of the shoring system Give detail of methodology used to resist uplift pressure due to ground water for tower portion as well as the portion outside the tower. Description of the foundation for the tower block Nature of Foundation SBC assumed Tzsq.rnt. Sub-grade Elastic Modulus Intended Use of basements If rock anchors are used, are they grouted after installation and stressing? Is structural steel used in the construction of the sub-structure? If yes, what are the measures taken for its fire proofing and corrosion resistance? Whether Expansion/ Separation joints provided'? Whether expansion joint/ separation joint continues through basement? If yes, detail at Basement level & retaining wall junction Rcf6 DESCRIPTION OF SUPER STRUCTURE No. of Floors & height of building in rn Shape of Building, Plan, Elevation, Whether Symmetric in Elevation Maximum plan dimension in either direction in m. '\ ~ ~? ~ - 138 - - 139 - .., Ratio of plan dimension Typical Floor to floor height in 111 Maximum floor to floor height in entire height of building in 111. Aspect ratio ( Height of Building til 1 Terrace I Minimum Dimension of Building) Type of floor slab Average thickness of floor slab in 111111 Whether column are RCC, Composite or In structural steel "' \\ ~x 0 - 140 - The materials to be tested on site include cement, water, aggregates for concrete, bricks and stones, soil for embankments, and aggregates for construction works. The list of materials to be tested on site is given in the Table I below. Table I List of Materials Tested on Site Material SI.No. 1 Cement 2 Sand I Fine Aggregates. 3 Water for Construction Works (can be tested in approved lab) 4 Bricks 5 Size Stone 6 Coarse Aggregate for Concrete Work 7 Soil/Earth/Sub-grade Material 8 Granular Sub-base (GSB) Material 9 Material for WBM I WMM 10 Metal for BM/DBM/BC/Surface Drcssing/MSS/Premix Carpet 11 Binder for WBM 12 Fine Aggregate for DBM/BC 13 Lime 14 Borrow Material 15 Steel (to be procured directly form manufacture along with test certificate Construction Quality Checklist/Testing Annexurc-X Item As Per Ouilding Plan Remark by authorized Non Yes 0 applicable Applicable representative l. Number of floors Building height 2.External Setbacks 3. Building Line, if any 4.Parking space provision 5. Abutting road width 6. FAR 7. Coverage percentage 8. Tree Cover 9. Water harvesting structures 10. Land if required to be surrendered 11. Lift/s, water pumps and storage tanks 12. Internal roads /pavina 13. Parking areas and external lighting 14. Lightening arrestors 15. Fire Fighting installations 16. Lifts 17 Water pump 18. Drainage and arrangement for waste water and sewage disposal 19. Copy of agreement with the apartment Owners' Association/Societv 20. Implementation of Life Safety provisions us mentioned in ational Building Code 2005(Group-l Part-W Fire and Life Safetv-4) 21.NOC from Fire Service Department Quality Checklists for Building Works ITEM As Per Building Plan Remark by authorized Non Yes 0 anolicable Applicable representative 1) EXCAVATION & PCC A. Pre Excavation I .Construction Drawings indicating levels available at Site 2.Proper safetv precautions taken for site and public 3.Precautions taken for dewaterinz and protecting site from flooding 4. Dumping ground established Setting out and levels as per drawings 5. Intermediate levels checked B. Post Excavation l . Characteristics of excavated strata noted and deviations informed 2. Aonropriate shoring and shuttering done 3. Final excavation levels, surface inspected and approved 4. Anti-Termite Treatment has been done post excavation 2) PLAIN CEMENT CONCRETE WORKS A . Pre-concreting l. All levels and dimensions checked for correctness 2. Shuttering is as per plan and has no gaps in ,..... "~()' 4 r-- ~o - 141 -

Previous and next

All provisions of .lharkhand Building Bye-laws 2016

Questions people ask

Is form FOR OCCUPANCY CERTIFICATE of .lharkhand Building Bye-laws 2016 still in force?

No repeal of .lharkhand Building Bye-laws 2016 is recorded.