Form FOR OCCUPANCY CERTIFICATE, .lharkhand Building Bye-laws 2016: FORM FOR OCCUPANCY CERTIFICATE
.lharkhand Building Bye-laws 2016 - Form FOR OCCUPANCY CERTIFICATE
Text of form FOR OCCUPANCY CERTIFICATE
FORM FOR OCCUPANCY CERTIFICATE
FORM FOR OCCUPANCY CERTIFICATE
Annexure VII
- 135 -
Date .
Registration No ..
Name .
(In Block letters)
Address: .
Signature of
Builder/Owner/Applicant
Date .
Registration No .
Name .
(In Block letters)
Address: .
Signature of Licensed Architect/Engineer/Supervisor
Yours faithfully,
with the sanctioned plan.
permission
accordance
The construction up to plinth/column up to plinth level ha
been completed in Building on/in Plot
No....................... Road/Street
........................ Ward in
accordance with your
No dated and is m
Sir,
The .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Authority,
To,
Information for Intimation of Completion of Work up to
Plinth Level
Anncxure-VIII
Item As Per Building Plan Remark by
Yes No on I Applicable
authorized
applicable representative
1) Structural Safety
I. Provide Design Basis Report as per the document '
2. Provide description of Sub-structure and Super-
structure as per the format given in the Ref(5&6)
enclosed.
3. Provide brief Description of Structural System
with sketches, images of drawing. etc. with specific
focus on Lateral load resisting system'.
4. Provide brief note on modeling, software used etc.
Clear mention whether infill I partition wall is
idealized as part of lateral load system?
5. Provide the height of building in meters.
6. Provide plan dimensions of the building (mt x mt)
EO Loadina Details
7. Provide following EQ loading details.
a) Zone Factor
b) Importance factor
c) Response Reduction factor
d) Soil Type
e) % LL considered in seismic
I) Time Period in the horizontal X- direction
(sec)
g) Time Period in the horizontal Z-direction
(sec)
h) Total Seismic weight (Sw) of building (kN)
i) Static Base-shear in X-direction (as% of
Sw)
j) Static Base-shear in Z-direction (as% of
Sw)
k) Table of distribution for static base shear
I) Max. deflection at roof level. (mm)
m) Max. inter storey drift./ Height
Vertical Elements Details
8. Provide following data regarding Vertical
Elements.
a) Size of maximum loaded column
b) Gravity load on max. loaded column
c) Axial stress in max. loaded column
(Gravity loads)
d) Grade or max. loaded column
e) Axial settlement in max. loaded column
f) Axial settlement in min. loaded column
g) % Base-shear resisted by all columns along
X (static)
[ h) % Base-shear resisted by all columns along
Z (static)
Dynamic Analysis
9 Provide following data from Dynamic Analysis
a) Total gravity load on floating column
(provide table if there are multiple floating
IJ) ~x - 136 -
,-r~
Checklist for Structural Safety
Annexure-IX
columns)
b) Size and pan or girders supporting floating
columns
c) Number of floors upported by lloating
columns
d) Deflection of girder under column (from
model)
e) Deflection of girder under column (from s/
action)
f) Specific details about floating columns on
cantilevergirders (Refer Table below)
10. Provide, if applicable, following data for
eachcantilever.
a) Cantilever span
b) Structural system
c) Nature of usage
d) Maximum elastic deflection under gravity
loads
11. Provide stability calculations for uplift and
ovcrturningfrnodcl extract in case of model)
12. Typical design calculations for footings
13. Typical design calculations for RCC columns
Composite Columns
14. Typical design calculations for RCC walls
15. Typical design calculations for RC beams (Or
Steel Beams)
16. Typical design calculations for RCC Girders (Or
Steel Girders/Truss)
17. Typical design calculations for Steel Bracings
18. Provide a note on special provisions suggested
for the building (like dampers etc.)
19. Soft copy of model including input and output.
Provide following data from Dynamic Analysis
Time
Modes Frequency Period in X-Participation Z-Participation
Sec
Mode I
Mode 2
Mode 3
Mode 4
Mode 5
Mode 6
Mode 7
Mode 8
Mode 9
Mode IO
Mode 11
Mode 12
Mode 13
Mode 14
Mode 15
Summation
Provide Table for lateral deflections (mm) at Terrace Level in the following format.
Load Case Dxrnax 1--1/Dx Drift-x Dzrnax 1--1/Dz Drift-z
""\
~
,?/.,¢?!} - 137 - z->
Provide Corner displacements (mm) for Torsional lrregularity(along x-direction) in the following
format.
Load Corner- I Corner- Corner-2 Corner-4 Avg- x %Max.I Avg. Case 2
Eq-x
Wl-x
Provide Corner displacements (mm) for Torsional lrregularity(along z-direction) in the following
format.
Load Corner- I Corner- Corner- 2 Corner- 4 Avg- x %
Case 2 Max.I Avg.
Eq-z
Wl-z
Provide acceleration (rng) values in the following format.
Eq-x I Eq-z I WL-x I WL-z
I I I
Ref 5
DESCRIPTION OF SUB-STRUCTURE
No. of basement
Minimum clearance between outermost basement
retaining wall and compound wall
Has a Shoring system been installed ? Submit
sectional detai I of the shoring system
Give detail of methodology used to resist uplift
pressure due to ground water for tower portion as
well as the portion outside the tower.
Description of the foundation for the tower block
Nature of Foundation
SBC assumed Tzsq.rnt.
Sub-grade Elastic Modulus
Intended Use of basements
If rock anchors are used, are they grouted after
installation and stressing?
Is structural steel used in the construction of the
sub-structure?
If yes, what are the measures taken for its fire
proofing and corrosion resistance?
Whether Expansion/
Separation joints provided'?
Whether expansion joint/ separation joint
continues through basement?
If yes, detail at Basement level & retaining wall
junction
Rcf6
DESCRIPTION OF SUPER STRUCTURE
No. of Floors & height of building in rn
Shape of Building, Plan, Elevation, Whether Symmetric in
Elevation
Maximum plan dimension in either direction in m.
'\
~ ~? ~ - 138 -
- 139 -
..,
Ratio of plan dimension
Typical Floor to floor height in 111 Maximum floor to floor height
in entire height of building in 111.
Aspect ratio ( Height of Building til 1 Terrace I Minimum
Dimension of
Building)
Type of floor slab
Average thickness of floor slab in 111111
Whether column are RCC, Composite or In structural steel
"' \\ ~x 0
- 140 -
The materials to be tested on site include cement, water, aggregates for concrete, bricks
and stones, soil for embankments, and aggregates for construction works. The list of
materials to be tested on site is given in the Table I below.
Table I List of Materials Tested on Site
Material
SI.No.
1 Cement
2 Sand I Fine Aggregates.
3 Water for Construction Works (can be tested in approved lab)
4 Bricks
5 Size Stone
6 Coarse Aggregate for Concrete Work
7 Soil/Earth/Sub-grade Material
8 Granular Sub-base (GSB) Material
9 Material for WBM I WMM
10 Metal for BM/DBM/BC/Surface Drcssing/MSS/Premix Carpet
11 Binder for WBM
12 Fine Aggregate for DBM/BC
13 Lime
14 Borrow Material
15 Steel (to be procured directly form manufacture along with test certificate
Construction Quality Checklist/Testing
Annexurc-X
Item
As Per Ouilding Plan
Remark by authorized Non Yes 0 applicable Applicable representative
l. Number of floors
Building height
2.External Setbacks
3. Building Line, if any
4.Parking space provision
5. Abutting road width
6. FAR
7. Coverage percentage
8. Tree Cover
9. Water harvesting structures
10. Land if required to be surrendered
11. Lift/s, water pumps and storage tanks
12. Internal roads /pavina
13. Parking areas and external lighting
14. Lightening arrestors
15. Fire Fighting installations
16. Lifts
17 Water pump
18. Drainage and arrangement for waste water
and sewage disposal
19. Copy of agreement with the apartment
Owners' Association/Societv
20. Implementation of Life Safety provisions us
mentioned in ational Building Code
2005(Group-l Part-W Fire and Life Safetv-4)
21.NOC from Fire Service Department
Quality Checklists for Building Works
ITEM
As Per Building Plan
Remark by authorized Non Yes 0 anolicable Applicable representative
1) EXCAVATION & PCC
A. Pre Excavation
I .Construction Drawings
indicating levels available at Site
2.Proper safetv precautions taken
for site and public
3.Precautions taken for dewaterinz
and protecting site from flooding
4. Dumping ground established
Setting out and levels as per
drawings
5. Intermediate levels checked
B. Post Excavation
l . Characteristics of excavated strata
noted and deviations informed
2. Aonropriate shoring and
shuttering done
3. Final excavation levels, surface
inspected and approved
4. Anti-Termite Treatment has been
done post excavation
2) PLAIN CEMENT CONCRETE WORKS
A . Pre-concreting
l. All levels and dimensions
checked for correctness
2. Shuttering is as per plan and has no gaps in
,.....
"~()' 4 r--
~o
- 141 -
Previous and next
Questions people ask
Is form FOR OCCUPANCY CERTIFICATE of .lharkhand Building Bye-laws 2016 still in force?
No repeal of .lharkhand Building Bye-laws 2016 is recorded.