Text of form For Mobile Tower Permission
Form For Mobile Tower Permission
Form For Mobile Tower Permission
Annexure-IV
..
- 130 -
Bank Draft No.--------------------------------------
- Name of Bank ---------------------------------------
-------------------------Date--------------------------
Fee as per Jharkhand
Communication Tower and
12 Related Structures Policy,
2015 for 8111. height/more than
8111. hei ht Non refundable .
D D
Affidavit enclosed or not by
TSPs/IPs in context of self
certificate produced before
TERM CELL of DOT with
re ard to EMR.
- 131 -
Construction As Per
Element Building Plan Remark Stage Yes No
Plan check All, pecially structural calculation, fire
safety, area of glazing
Assessment of existing lintels, foundations,
beams
Commencement Trial Hole
Check for encroaching trees, made up of
ground, etc
Access for fire service
Excavations (Depth/width, distance to tree
& drain)
Movement of Joints, anti-heave protection,
Foundation & clearance to drain
Excavations Piling
Steel Enforcement
Ground Preparation for raft
Basement/ Tanking for below ground walls & floor
tanking Retaining wall
Ground Floor preparation (hardcore etc.)
Suspended timber ground floor preparation
Pre cast concrete beams/floor (ventilation &
DPC)
Over site DPC
DBM
Gas Protection - landfill, radon etc
Floor insulation
Site level for disabled access
Sewer branches to the site
Drainage laid prior to coverage
Ground percolations tests ( septic tanks and
Drainage (before /or soak-aways )
back fill) Excavated Soak-away pits
Exposure of main sewer
Rerouting of main sewer/ relocation of main
sewer
Frame-concrete reinforcement or steel or
timber
Floor joists and beams and connections
Construction at first floor level, eg block
work and wall ties
Super Structure Construction at 2'"' and subsequent floor
levels
Dormer framework prior to boarding over
Roof timbers, restrains straps, bracing
Roof breather membrane
Staircase installed
Vehicle Barriers/bay
Annexure V
Inspection Checklist During the Construction
- 132 -
Fire protection applied to structural
members
Cavity barriers/fire stonnina
Fire dampers and fire collars
Means of escape
Super Structure Space separation & comoartmentation
Glazing
Opening to conservatories etc
Area of Glazing
Thermal elements (cavity walls etc)
Access
Sound insulation in walls, floors and stairs
Insulation in walls and roof
Bare walls, beams, lintels
Pre Plaster
Fire door
First fix electrical (dwellings only)
Ventilation system
Hygiene (sanitary convenience & washing
facilities - nines etc)
Drainage water tightness test
Internal lighting, appliance (C02 emission
rate (DER/BER)
Heating system, incl thermostatic control
Sound insulation test
Gas tightness test to flues
Completion Electrical installations (dwellings only)
Combustion appliance & fuel system
storage
Air leakage test
Hygiene (sanitary conveniences & washing
facilities)
Test of emergency lighting and fire alarms
- 133 -
technical personnel and the builder/owner/applicant. ...
;'?~__;!
Registration no.
Note- In case the building has been constructed with deviation a statement of such
deviation together with line drawings indicating the extent of deviation shall
be submitted along with the completion certificate, duly signed by the
Date:
Address:
2. Signature of the Builder/Owner/Applicant;
Name:
............................................................................................. (in
block letters)
Address of licensed Architect /Engineerffown
Planner/Draftsman/Group .
....................................................................................... Dated .
1. Signature of Licensed ..
Architect/Engineerffown
Planner/Draftsman/Group .
Name of Licensed Architect/Licensed Town/Planner/Draftsman/Group
I hereby certify that the erection, re-erection or material alteration in/of building No .
.. or the development of land of Khesra no ..
on/in Plot no City has been supervised
by me and has been completed on according to the plans sanctioned,
vide on Dated The work has been completed
to my best satisfaction, the workmanship and all the materials (type and grade) have
been used strictly in accordance with general and detailed specification. No
provisions of the building Byelaws have been violated, no requisitions made, no
conditions prescribed or orders issued there under have been transgressed in the
course of the work. The building is fit for use for which it has been erected; re-erected
or altered, constructed and enlarged. The land is fit for construction for which it has
been developed or re-developed. I request that the occupancy certificate/development
certificate for the premises may be issued.