LawGrids logoLAWGRIDS.ORG

Form For Mobile Tower Permission, .lharkhand Building Bye-laws 2016: Form For Mobile Tower Permission

.lharkhand Building Bye-laws 2016 - Form For Mobile Tower Permission

Text of form For Mobile Tower Permission

Form For Mobile Tower Permission

Form For Mobile Tower Permission Annexure-IV .. - 130 - Bank Draft No.-------------------------------------- - Name of Bank --------------------------------------- -------------------------Date-------------------------- Fee as per Jharkhand Communication Tower and 12 Related Structures Policy, 2015 for 8111. height/more than 8111. hei ht Non refundable . D D Affidavit enclosed or not by TSPs/IPs in context of self certificate produced before TERM CELL of DOT with re ard to EMR. - 131 - Construction As Per Element Building Plan Remark Stage Yes No Plan check All, pecially structural calculation, fire safety, area of glazing Assessment of existing lintels, foundations, beams Commencement Trial Hole Check for encroaching trees, made up of ground, etc Access for fire service Excavations (Depth/width, distance to tree & drain) Movement of Joints, anti-heave protection, Foundation & clearance to drain Excavations Piling Steel Enforcement Ground Preparation for raft Basement/ Tanking for below ground walls & floor tanking Retaining wall Ground Floor preparation (hardcore etc.) Suspended timber ground floor preparation Pre cast concrete beams/floor (ventilation & DPC) Over site DPC DBM Gas Protection - landfill, radon etc Floor insulation Site level for disabled access Sewer branches to the site Drainage laid prior to coverage Ground percolations tests ( septic tanks and Drainage (before /or soak-aways ) back fill) Excavated Soak-away pits Exposure of main sewer Rerouting of main sewer/ relocation of main sewer Frame-concrete reinforcement or steel or timber Floor joists and beams and connections Construction at first floor level, eg block work and wall ties Super Structure Construction at 2'"' and subsequent floor levels Dormer framework prior to boarding over Roof timbers, restrains straps, bracing Roof breather membrane Staircase installed Vehicle Barriers/bay Annexure V Inspection Checklist During the Construction - 132 - Fire protection applied to structural members Cavity barriers/fire stonnina Fire dampers and fire collars Means of escape Super Structure Space separation & comoartmentation Glazing Opening to conservatories etc Area of Glazing Thermal elements (cavity walls etc) Access Sound insulation in walls, floors and stairs Insulation in walls and roof Bare walls, beams, lintels Pre Plaster Fire door First fix electrical (dwellings only) Ventilation system Hygiene (sanitary convenience & washing facilities - nines etc) Drainage water tightness test Internal lighting, appliance (C02 emission rate (DER/BER) Heating system, incl thermostatic control Sound insulation test Gas tightness test to flues Completion Electrical installations (dwellings only) Combustion appliance & fuel system storage Air leakage test Hygiene (sanitary conveniences & washing facilities) Test of emergency lighting and fire alarms - 133 - technical personnel and the builder/owner/applicant. ... ;'?~__;! Registration no. Note- In case the building has been constructed with deviation a statement of such deviation together with line drawings indicating the extent of deviation shall be submitted along with the completion certificate, duly signed by the Date: Address: 2. Signature of the Builder/Owner/Applicant; Name: ............................................................................................. (in block letters) Address of licensed Architect /Engineerffown Planner/Draftsman/Group . ....................................................................................... Dated . 1. Signature of Licensed .. Architect/Engineerffown Planner/Draftsman/Group . Name of Licensed Architect/Licensed Town/Planner/Draftsman/Group I hereby certify that the erection, re-erection or material alteration in/of building No . .. or the development of land of Khesra no .. on/in Plot no City has been supervised by me and has been completed on according to the plans sanctioned, vide on Dated The work has been completed to my best satisfaction, the workmanship and all the materials (type and grade) have been used strictly in accordance with general and detailed specification. No provisions of the building Byelaws have been violated, no requisitions made, no conditions prescribed or orders issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected; re-erected or altered, constructed and enlarged. The land is fit for construction for which it has been developed or re-developed. I request that the occupancy certificate/development certificate for the premises may be issued.

Previous and next

All provisions of .lharkhand Building Bye-laws 2016

Questions people ask

Is form For Mobile Tower Permission of .lharkhand Building Bye-laws 2016 still in force?

No repeal of .lharkhand Building Bye-laws 2016 is recorded.