Form FOR THE MINING PLAN, the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015: FORM FOR THE MINING PLAN
the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015 - Form FOR THE MINING PLAN
Text of form FOR THE MINING PLAN
FORM FOR THE MINING PLAN
FORM FOR THE MINING PLAN
INTRODUCTION
1. General:
1.1. Name and address of the applicant:-
Name of the applicant ……………………………………..
Address of the applicant …………………………………..
P.O……………………………………..
Tehsil …………………………………
District…………………………………
Pin……………..
Phone ………………
Email…………………
1.2. Status of the applicant
(Private individual/Private Company or any other):
1.3. Minerals which applicant intends to mine:
1.4. Period for which mining lease/ contract is granted
Reference of Letter of Intent (photocopy to be annexed).
1.5. Name and address of the Registered Qualified Person (herein after referred to as
(„RQP‟) preparing Mining Plan:
Address of the RQP…………………….
Name…………………..
Village………………….
P. O……………………..
Tehsil……………………
District……………………
Pin………..
Phone………….
E-mail…………..
Registration No. of RQP ………………..
Valid upto ……………………..
1.6. Name and address of the prospecting agency……………………….
Name…………………………
Village………………………..
P. O…………………………..
Tehsil…………………………
District…………………………
Pin…………..
Phone……………
Email……………
2. Location and approach of the area (Location Map to be annexed).
2.1. Toposheet Number,
Latitude and longitude of the area……………………….
Location map of the area
2.2. Location details of the area
2.2.a Detail of the area, Revenue record to be appended in the following format:-
87
Sr.
No.
Detail of Area
Khasra
number
Area Owner Kism Mauza Panchayat
1
2
Address Details
Village……………………………..
Patwar Circle……………………….
P.O…………………………………..
Tehsil…………………………………
District…………………………………
1.3. Sub- Division Office (Civil)…………………………………
Sub Division Office (Forest)………………Range office ………….
Sub Division Office (IPH)………………………
Sub Division Office (PWD) …………………….
2.4. Distance from Important places in Kms.
1.
2.
3.
2.5. Approach of the area…………………………………………………
3. Physiographical aspect of the area
3.1. General:
3.2. Altitude: General terrain description, with map and contours encompassing the
mine area.
3.3. Climate of the area:
3.4. Rainfall of the area:
3.5. Any other important physical feature:
3.6. Description of Mining Area.
PART-1
DESCRIPTION OF GEOMORPHOLOGY AND MINE DEVELOPMENT
A. In case of River Bed Mining:-
(Mining Plan must be prepared in accordance to the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of
Illegal Mining, Transportation and Storage) Rules, 2015, Metaliferous Mines Regulation 1961 and other guidelines issued from
time to time).
(1) Description of the River/Stream bed on which the mine is situated
1.1 General:
1.2 Name of river/stream in which the mine is situated:
1.3 Drainage system:
1.4 Type of drainage:
1.5 Origin of river/stream:
1.6 Altitude at origin:
1.7 Geometry of the catchment of the river impacting the replenishment of deposits.
Total area of catchment,
Area of catchment up to the mining site.
Profile of the river bed from origin to confluence.
Profile of the river bed up to the mining site.
Angle of slope of river bed near the mining site.
Cycle of erosion at mining site (Youthful, mature or old).
88
Width of river at the place of mining:
1.8. The annual deposition on river/stream bed:
1.9. The competency of river/stream at the mining site (i.e the weight of largest
fragment which is transported by stream)
(Attach a map showing boundaries of the mine, adjoining area, point of public utility
in the area/nearby (village footpath, road, school, residential house, hospital, cattle
shed, charitable building, water channel, cemetery/cremation ground, place of
worship etc., any activity of the forest department in the area such as soil
conservation works, nursery plantations check dams, taming of nallas/stream etc
type of road viz National Highway, State highway, link road, village road, any bridge
any water supply scheme such as water supply tank, water supply bore well,
Irrigation canal, water supply scheme gallery etc. boundary of nearby mine area, if
any, the area susceptible to erosion and any other important feature).
1.10 Meandering pattern of the river near mining site, including:-
The level of High Flood Level:
The level of Low Flood Level:
The thread of deepest water in the meandering:
1.11 Altitude of mining area (Give the highest and lowest contour levels).
1.12 Description of Ground water table in the mining area, before and post monsoon.
(2) Geology:
2.1. The Geology of the catchment area:
2.2. Local Geology of the area:
2.3. The nature of boulders, cobbles, Sand etc.:
2.4. The nature of rocks of the bank and their attitude:
2.5. Description of annual deposition with respect to geology of catchment area and
other factors.
(3) Reserves Estimate
3.1 Percentage wise distribution of stone, bajri (Gravel) and sand etc. in the mining
area.
(A geological map of the area with appropriate scale of mapping, showing
position of pitting, trenching etc. to be annexed)
3.2 Estimate of geological reserves of each mineral i.e. Sand,Stone, and River borne
bajri (Gravel):
3.3 Estimate of mine able reserves of Sand, Stone, and River borne bajri (Gravel) in
the lease area.
3.4 Estimated annual deposition of the mineral Sand, Stone and River borne bajri
(Gravel) in the river bed: to show that the annual replenishment of sand and
associated minerals in the mining lease area is sufficient to sustain the mining
operation at level as planned for progressive mining for five years period.
(4) Mine Development and plan of progressive mining:
Brief description of working method, development of mine (manual, semi-
mechanical, mechanical)
4.1 Development and production program for the first five years including precaution to
89
be observed to prevent haphazard excavation, over exploitation, scattering of
waste, if any:
4.2 Year wise production; with details of saleable/useable minerals, mine waste and
removal of soil cover, to be given with charts and graphs.
(Year wise plans of excavation to be annexed)
4.3 End use of Mineral. Year wise details of consumption of material for captive
crusher and for free sale.
4.4 Details of road transportation of minerals to industrial unit and market. Give details
of adequacy of road infrastructure.
B. In case of Hill Slope Mining:-
(Mining Plan must be prepared in accordance to the Himachal Pradesh Minor Minerals (Concession) and
Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015, Metaliferous Mines Regulation
1961 and other guidelines issued from time to time).
(1) Description of the area in which the mine is situated
1.1 General:
1.2 Slope angle: Description of ridges & valleys
1.3 Type of drainage in the area, if any: and description of drainage of the area (Details
of river/stream in the area),if any:
1.4 Susceptibility of area to land slide, if any:
1.5 Springs in the area if any:
1.6 Any other details:
(Attach a map showing boundaries of the mine, adjoining area, point of public utility
in the area/nearby (village footpath, road, school, residential house, hospital, cattle
shed, charitable building, water channel, cemetery/crimination ground, place of
worship etc., any activity of the forest department in the area such as soil
conservation works, nursery plantation, check dams, taming of nallas/stream etc.,
type of road viz National Highway, State highway, link road, village road, any bridge
any water supply scheme such as water supply tank, water supply bore well,
Irrigation canal, water supply scheme gallery etc., boundary of nearby lease area, if
any, the area susceptible to erosion and any other important information).
(2) Geology:
2.1 The Regional Geology of the area:
2.2 The Local Geology of the area:
2.3 Details of prospecting work undertaken in the mining area.
2.4 The nature of rocks and their attitude.
The description of characteristic and attitude of the rock (Give dip, strike, joint
pattern, hardness, specific gravity etc. of the rock:
A geological map of the area with appropriate scale of mapping, showing
pitting,trenching etc. to be annexed)
(3) Reserves:
3.1 Estimates of geological reserve of each mineral along with grade under proved,
probable and possible category and mineable reserve by standard method of
estimation supported by analytical reports:
3.2 Constraining considerations for mining, (Public roads, adjoining private land, forest,
landslide prone area, electric poles or other points of public utility) and precautions
proposed for their safety.
90
3.3 Estimated mineable deposits of the mine area.
3.4 Conceptual Scheme of Mining and life of mine.
(4) Mine Development and plan of progressive mining:
Brief description of working method of mine process (manual, semi-mechanical,
mechanical and/or if blasting to be resorted to)
4.1 Briefly describe /existing/proposed method of development/working of the
depositwith all parameters/considerations.
4.2 Development and production programme for the first five years including precaution
to be observed to prevent haphazard excavation, over exploitation, scattering of
waste scree, if any:
4.3 Year-wise production, overburden, run of mine, saleable mineral, mineral rejects/
mine waste details to be given with charts and graphs.
(Year wise plans of excavation to be annexed)
4.4 Indicate proposed rate of production when mine is fully developed and the
expected life of the mine after its opening.
4.5 Balance material available in the area after five years of progressive mining and
estimated year of mine closure.
4.6 Describe briefly the salient feature of mode of working (Manual, semi mechanical,
mechanical and use of explosives).
4.7 Extent of mechanization: Describe with details the type of machinery/ equipment to
be used.
4.8 Blasting: Describe broad parameters like charge per hole, blasting pattern, charge
per delay, manner and sequence of firing, type of explosive to be used, storage
capacity for explosives, type of magazine etc.
4.9 Mine drainage: Likely depth of water table, working expected to be above/below the
water table, surface water drainage in the area, management of ground/surface
water drains.
4.10 Waste Management: Indicate briefly the nature and quantity of top soil, overburden,
mine waste/ mine rejects likely to be generated during the planned period of five
years with details of dumping sites.
4.11 Describe the end use of minerals: Captive consumption, free sale to inter-
mediatory/consumers etc.
4.12 Details of density of road transportation of minerals to industrial unit and market.
Give details of adequacy of road infrastructure.
C. In case of Brick earth mining:
(1) Geology
1.1 The Local Geology of the area:
(A geological map of the area with appropriate scale of mapping, showing
pitting, trenching etc. to be annexed)
91
(2) Reserves:
2.1 Estimates of geological reserve of each mineral along with grade under proved &
probable
2.2 Estimated mineable deposits of the mining area.
2.3 Conceptual Scheme of Mining and life of mine.
(3) Mine Development and Plan of Progressive Mining
Brief description of working method development of mine
4.2 Year wise production, run of mine plan with details of saleable/useable minerals,
mine waste and removal of soil cover, to be given with charts and graphs.
4.3 End use of Mineral.
4.4 Balance material available in the area after five years progressive mining and
estimated year of mine closure.
(4) Waste Disposal Plan
Details of waste to be generated in five years and its method of disposal.
(5) Mine Closure and Reclamation Plan:
Describe the year wise reclamation plan, giving proposed plantation plan and other
mitigation measures.
(6) Manpower Development
Give average daily employment (skilled, semi-skilled and unskilled).
PART-II
ENVIRONMENT MANAGEMENT
(1) Base line data (Detail of land use and social aspect of area)
1.1 Details of Population distribution
1.2 Socio-economy of the villages/population.
1.3 Land use details with five kilometers radius map.
1.4 Agriculture:
1.5 Horticulture:
1.6 Animal husbandry:
1.7 Fisheries:
1.8 Flora and fauna of the area.
1.9 Climate.
(2) Environment Management Plan:
Discuss the likely impact of mining on the environment of the area and steps to be
taken for its mitigation.
2.1 Impact on air,
2.2 Impact on water (Surface as well on ground water).
2.3 Impact on noise level.
2.4 Waste disposal arrangement, if any.
2.5 Socio-economic benefits
2.6 Transportation of mined material (Discuss in detail the type of transportation to be
deployed for carriage of minerals to consuming centre/centres and its impact on
existing road/railway system).
92
PART-III
Progressive Mine Closure Plan/Reclamation Plan
(1) Describe briefly the year wise reclamation and rehabilitation plan of land affected by
abandoned and exhausted quarries/pits during the five years, giving detail of proposed
back filling and plantation program to be marked on the relevant maps with estimated cost
of reclamation.
1.1 Mine Waste Disposal:
a) Year wise generation of mine waste and soil cover.
b) Year wise disposal of waste and soil cover.
c) Cost of the mine waste disposal scheme.
1.2 Describe briefly the arrangements made for top soil utilization, if any, waste
disposal along with their respective quantity likely to be generated for the five years
indicating location on the maps.
1.3. Preventive Check dams (Wherever necessary)
a) Year wise details of check dams to be constructed.
b) Year wise cost of construction of check dams.
1.4 Plantation work (Description with location map)
a) Year wise area to be covered under forestation.
b) Year wise number of trees (Give the name of species) to be planted.
c) Year wise cost of plantation work.
d) Year wise survival rate.
(2) Strategy for protection of Point of public utility etc.(If any).
Describe briefly the strategy for protection of point of public utility in the mining and its
adjoining areas such as village footpath, road, school, residential house, hospital, cattle
shed, charitable building, water channel cemetery/crimination ground, place of worship
including any activity of the forest department in the area such as soil conservation works,
nursery plantation, check dams/walls, taming of nallas/stream etc., type of road viz.
National Highway, State Highway, link road, village road, any bridge, any water supply
scheme such as water supply tank, water supply bore well, Irrigation canal, water supply
scheme, gallery etc., boundary of nearby lease area, if any, the area susceptible to erosion
and any other important features which shall be marked on the relevant maps.
(3) Manpower Development
Give average daily employment (skilled, semi-skilled and unskilled).
(4) Use of Mineral
Describe the utilization of mineral and the type of downstream industry.
(5) Any other relevant information
93
PART-IV
Certificate
Certified that the provisions of the Himachal Pradesh Minor Minerals (Concession) and Minerals
(Prevention of Illegal Mining, Transportation and Storage) Rules, 2015 Matliferous Mines
Regulation 1961 and other guidelines issued from time to time in this regard have been complied
for the preparation of Mining Plan for (name of Mineral), mine falling in Khasra Nos. ___________
measuring __________ Hectares/Bighas, Mauza _______ Tahsil ____________ District
____________ of M/s ____________________;
While preparing the mining plan including progressive mine closer plan all statutory rules,
regulation, orders made by competent authorities of the State or Central Government or orders
passed by Courts have been taken into consideration.
The information provided and the data furnished in this Mining Plan is correct to the best of
my knowledge.
Signature of H.P. RQP
Date Registration No.
Place Address of the H.P. RQP
Declaration
This is to declare that the Mining Plan including Progressive Mine Closure Plan of
mine of (name of Mineral/Minerals) situated in Khasra Nos. ________________ Measuring
____________ Hectare/Bighas/ Kanal/Mauza __________Tehsil ____________District
______________H.P. has been prepared with my consent and approval and that we/I
shall abide by all commitment thereunder.
“The Mining Plan and „Progressive Mine Closure Plan‟ complies all statutory rules,
regulations, orders made by competent authorities of State or Central Government or
orders passed by courts have been taken into consideration and wherever specific
permission is required, shall be obtained.
We undertake to implement all the measures proposed in this Mining Plan and
Progressive Mine Closure Plan‟ in a time bound manner.
We have deposited a sum of Rs…………………. with the competent authority of
the State Government in form of Fixed Deposit Receipt as financial assurance of the
same.
In case of default on my/our part, the approval of Mining Plan may be withdrawn
and the aforesaid sum assured may be forfeited.
Date: Signature of the Applicant.
Place: Name and address.
94
FORM-„N‟
[See rule 63]
CERTIFICATE OF ARREARS OF LAND REVENUE
In exercise of the powers conferred by rule 63 of the Himachal Pradesh Minor Minerals
(Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015,
I _________________ hereby certify that a sum of Rs.
_________________________________________ is recoverable as Arrears of Land Revenue
from Sh./M/s ________________________, R/o _________
___________________________on account of the following in respect of lease or contract or
permit or other sum dues from minor mineral, namely ___________.
i) Royalty/dead rent
ii) Surface rent
iii) Contract money
iv) Other sum dues
Total ____________
Place: __________ Signature of Issuing
Date: __________ Authority with designation
95
FORM-„O‟
[See rule 68(2)]
APPLICATION FOR JOINT INSPECTION OF STONE CRUSHER SITE
To
The State Geologist
Himachal Pradesh
Shimla – 171001
1 Name of the Applicant
2 Address of the applicant / firm
Pin code ………………..
3 Place of Registration of Firm
4 Nationality of Applicant
5 Telephone No
Office Residence
6 Particulars
of the fee deposited
Rs. 2500/-
Treasury Challan/
receipt( T.R.-5) No
No…………………….
Date…………………
Deposited at ……………………………
…………… H.P.
7 The Name of the Minor Mineral
to be crushed
8 The detail of
the area
where
stone
crusher is to
be installed
Khasra number
Ownership
Kism
Area
Mauza
Gram Panchyat
Tehsil & District
9 If applying
for lease,
the
particular
of the
Kh. No
Ownership
Kism
96
area
applied for
Area
Mauza
Gram Panchayat
Tehsil & District
Date of application
Distance of
Crusher site form
the lease
10 In case of other source, the detail thereof
11 Any other information which the applicant wants to furnish
Date Signature
97
FORM-„P‟
[See rule 68(4)]
Provisional Registration
Department of Industries
Office of State Geologist
Shimla-1
-…-
Whereas Shri/Ms ________________________________ Owner of
___________________________________ Crusher/(to be established) has/have applied for
installation of Stone Crusher in khasra number _____________________ Mauza
___________________________ measuring _____________________ Gram Panchayat
_____________ P.O. ____________ Tehsil ________________ District
______________________.
The Provisional registration is hereby granted to Shri/Ms ____________ Subject to
the following conditions:-
1. The Consent to Establish from the Himachal Pradesh State Pollution Control Board
(HPSPCB) shall obtain before installation of stone crusher unit.
2. The applicant shall operate his stone crusher unit only after obtaining the COP from HP
State Pollution Control Board and Permanent Registration from Geological Wing
Department of Industries.
3. Based on mineral potential determined in approved Mining Plan, the stone crusher owner
shall install the crusher machinery accordingly.
Date of Issue: …………….. State Geologist
Himachal Pradesh
98
FORM-„Q‟
[See rule 69(1)]
APPLICATION FOR GRANT/RENEWAL OF PERMANENT REGISTRATION
OF STONE CRUSHER
To
The State Geologist
Himachal Pradesh
Shimla – 171001
1 Name of the Applicant
2 Address of the applicant/firm
Pin code ………………..
3 Place of Registration of Firm
4 Nationality of Applicant
5 Telephone No
Office Residence
6 Particulars
of the fee deposited
Rs. 2500/-
Treasury Challan/
receipt( T.R.-5) No
No…………………….
Date…………………
Deposited at ………………………………………
… H.P.
7 The Name of the Minor Mineral
to be crushed
8 The detail of
the area
where
crusher is
installed.
Kh. No
Ownership
Kism
Area
Mauza
Gram Panchyat
Tehsil & District
Date of
installation
99
9 The detail of machinery installed
viz number of Jaws/Roller, Sets
& combination of Jaw cum Roller
etc.
10 Total investment on land,
building and machinery
11 Total number of worker to be
employed.
Skilled …………….
Unskilled ……………….
12 The approximate annual
Production of Minerals in Stone
Crusher
13 The source of Mineral
a) Mining lease
b) Other sources
(a) The
particular
of lease
Kh. No
Ownership
Kism
Area
Mauza
Gram Panchyat
Tehsil & District
Date of execution
Period of lease
Distance of
Crusher site from
the lease area
(b) Detail of other source
14 The detail of First Aid facility at
stone crusher
15 The detail of steps to be taken
for ensuring compliance of the
Water ( Prevention and Control
of Pollution) Act , 1974, the Air
(Prevention and Control of
Pollution) Act, 1981 and The
Environmental Protection Act,
1986 and the rules and
notification framed or issued
thereunder.
16 Source of Water Supply
100
17 Detail of consents Date of Consent to Establish
Date of Consent to Operate
Date of Renewal of Consent
18 Any other information which the applicant wants to furnish
Date: Signature of the Applicant.
101
FORM-„R‟
[See rule 69(1)]
Permanent Registration
Department of Industries
Office of the State Geologist
Shimla-171001
Whereas Shri/Ms __________________________ Owner __________________ of
______________________________crusher has/have applied for the Permanent Registration of
Stone Crusher installed in Khasra number _________________ Mauza _____________
measuring ____________, Gram Panchayat ____________ P.O. _________ Tehsil
_____________ District ______________ vide application Dated _______ .
The Permanent Registration is hereby granted to Shri/ M/s _____________ subject to the
following conditions:-
1. The owner of the stone crusher shall observe the provisions of;
i) The Air (Prevention and Control of Pollution) Act, 1981 and rules framed
thereunder.
ii) The Water (Prevention and Control of Pollution) Act 1974 and rules framed
thereunder.
iii) The Environment (Protection) Act, 1986 and rules framed thereunder.
iv) The Noise Pollution (Regulation and Control) Rules 2000.
2. The expansion of a stone crusher shall not be allowed unless approved by Geological
Wing, Department of Industries, Himachal Pradesh.
3. The stone crusher owner shall ensure that the, emission standards are as per the Statutes
as notified by the Government vide Notification No. STE-E(3)-17/2012 dated 29.05.2014 or
amended from time to time are adhered to.
4. The stone crusher owner shall adopt pollution control measures as per Government
Notification No. STE-E(3)-17/2012 dated 29.05.2014 or as amended from time to time.
5. The stone crusher owner shall submit a return by 10th of every month to the concerned
Mining Officer, giving details of total quantity of minerals crushed, electricity consumed,
power generated in case of captive power generated run crusher, fuel consumption in case
of diesel run crusher, number of labour employed and wages paid etc. .
6. Free access shall be given to the officer/official of the Geological Wing, Department of
Industries, H.P. for the verification of plant & machinery, source/supply of raw material,
sale record and stocks of raw material and finished goods.
7. The stone crusher Owner shall immediately report to the Deputy Commissioner and Mining
officer of the district concerned about any accident which may take place during the course
of crushing operation resulting in serious bodily injury.
102
8. The stone crusher Owner shall not pay wages less than the minimum wages prescribed by
the Central or State Government from time to time under the Minimum Wages Act, 1948,
to the workers employed in the crushing unit.
9. The stone crusher Owner shall indemnify the State Government against the claim of the
third party.
10. The owner of the Stone Crusher shall apply for the renewal atleast three months before
the expiry of the registration in „Form-Q‟.
The registration is valid upto _______________.
Date of Issue ________ State Geologist
Himachal Pradesh
103
FORM-„S‟
[See rule 74(1) & 76(3)]
APPLICATION FOR REGISTRATION AS A DEALER
1. Name of applicant ……………………………………………
(In case of firm give names & address of partners and person
holding power of attorney to act on behalf of Firm)
2. Father‟s Name …………………………………………………………………….
3. Profession…………………………………………………………………………
Address – Correspondence……………………………………………………
Pin …………………… Mobile No. …………………
Permanent Address ……………………………………………………………
…………………Pin…………..Phone …………………….
4. Place of business…………………………………………………………………...
5. Specific purpose for which registration is
applied for Processing/Sorting/Selling/Trading) ……………………….
6. Name of Mineral/Ore for which registration is required………………………
7. Detail of application fee and payment receipt…………………………………
8. Period for which registration is required………………………………………
9. In case of renewal the number & date of original
registration…………………………………………………………………………
10. Any special ground for grant of registration in favour of
applicant………………………………………………………………………
DECLARATION:
I/We hereby declare that I/we have read and understood all the provisions of Himachal
Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation
and Storage) Rules, 2015 and conditions of the registration made thereunder and I agree to abide
by the same.
Date of Application:
Place: Signature of Applicant
Photograph
104
Previous and next
Questions people ask
Is form FOR THE MINING PLAN of the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015 still in force?
No repeal of the Himachal Pradesh Minor Minerals (Concession) and Minerals (Prevention of Illegal Mining, Transportation and Storage) Rules, 2015 is recorded.