Form 2, The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015: FORM-2
The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 - Form 2
Text of form 2
FORM-2
FORM-2
(see sub-regulation (1) of regulation 7)
Net Metering Connection Agreement
This Agreement is made and entered into at (location)…………..on this (date) …….day of
(month)………. Between ……………………………………… who is a consumer of the
distribution licensee with sanctioned contract demand of ………. kVA at ………… and
intends to install Rooftop Solar PV Grid Interactive System at his premises
………………………….. (address)……………………………… as First party,
and.………………………. distribution Licensee (herein after called as……… (Name of
Discom) ………………. and having its registered office at
……………….(address)…………… as Second party of the agreement. And whereas, the
……………………(Name of Discom)………..agrees to facilitate the Rooftop Solar PV
Energy Generator for the electricity generated from his Rooftop Solar PV Grid Interactive
System of capacity……….watts and as per conditions of this agreement and net- metering
regulations/ orders issued by the Himachal Pradesh Electricity Regulatory Commission.
Both the party hereby agrees to as follows:
1. Eligibility
1.1 Eligibility for net- metering shall be as specified in the Himachal Pradesh Electricity
Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net
Metering) Regulations, 2015. First Party is required to be aware, in advance, of the
standards and conditions his system has to meet, for being integrated into
grid/distribution system.
2. Technical and Interconnection Requirements
2.1 First Party agrees that his Solar PV generation plant and net- metering system will
conform to the Standards and requirements mentioned in the following Regulations,
codes and any other relevant provisions and also that he shall be continued to be
governed by all such regulations, codes and other relevant provisions.-
(i) the Central Electricity Authority (Technical Standards for connectivity of the
Distributed Generating Resources) Regulations, 2013;
(ii) the Central Electricity Authority (Installation and Operation of Meters)
Regulation 2006;
(iii) the Himachal Pradesh Electricity Distribution Code, 2008;
(iv) the Himachal Pradesh Electricity Supply Code, 2009;
(v) any other provisions applicable to the electricity consumer of the distribution
licensee.
2.2 First Party agrees that he has installed or will install, prior to connection of
Photovoltaic System to Second Party’s distribution system, an isolation device
(both automatic and inbuilt within inverter in case of Solar PV Generation and
external manual relays) and agrees for the Second Party to have access to and
operation of this, if required and for repair ………………(Name of
Discom)………………………………and maintenance of the distribution system.
Compendium of HPERC Regulations, March 2021 17
2.3 First Party agrees that in case of a power outage on Second Party’s system,
Photovoltaic System will shut down, automatically and his plant will not inject
power into Licensee’s distribution system.
2.4 All the equipment connected to distribution system must be compliant with relevant
international (IEEE/IEC) or Indian standards (BIS) and installations of electrical
equipment must comply with the Central Electricity Authority (Measures of Safety
and Electricity Supply) Regulations, 2010.
2.5 First Party agrees that licensee will specify the interface/interconnection point and
metering point.
2.6 First Party and Second Party agrees to comply with the relevant CEA regulations in
respect of operation and maintenance of the plant, drawing and diagrams, site
responsibility schedule, harmonics, synchronization, voltage frequency, flicker etc.
2.7 Due to Second Party obligation to maintain a safe and reliable distribution system,
eligible consumer agrees that if is it determined by the Second Party that First Party’s
Photovoltaic System either caused damage to and/or produces adverse effects
affecting other consumers or Second Party’s assets, First Party will have to
disconnect Photovoltaic System immediately from the distribution system upon
direction from the Second Party and correct the problem at his own expense prior to
a reconnection.
3. Clearances and Approvals
3.1 First Party agrees to obtain all the necessary approvals and clearances (environmental
and grid connection related) before connecting the Photovoltaic System to the
distribution system.
4. Access and Disconnection
4.1 Second Party shall have access to metering equipment and disconnecting means of
Photovoltaic System, both automatic and manual, at all times.
4.2 In emergency or outage situation, where there is no access to a disconnecting means,
both automatic and manual, such as a switch or breaker, Second Party may
disconnect service to the premise.
5. Liabilities
5.1 First Party and Second Party will indemnify each other for damages or adverse effect
from either party’s negligence or intentional misconduct in the connection and
operation of Photovoltaic System or Second Party distribution system.
5.2 Second Party and First Party will not be liable to each other for any loss of profits or
revenues, business interruption losses, loss of contract or loss of goodwill, or for
indirect, consequential incidental or special damages, including, but not limited to,
punitive or exemplary damages, whether any of the said liability, loss or damages
arise in contract, or otherwise.
5.3 Second Party shall not be liable for delivery or realization by First Party for any
fiscal or other incentive provided by the Central/State Government beyond the
scope specified by the Commission in its relevant order.
18 Compendium of HPERC Regulations, March 2021
6. Commercial Settlement
6.1 All the commercial settlement under this agreement shall follow the Net – Metering
Regulations and relevant Orders of Himachal Pradesh Electricity Regulatory
Commission.
7. Connection Costs
7.1 The First Party shall bear all costs related to setting up of Photovoltaic System
including metering and interconnection costs. The First Party agrees to pay the
actual cost of modifications and upgrades to the service line required to connect
Photovoltaic System is case it is required.
8. Termination
8.1 The First Party can terminate agreement at any time by providing Second Party with
90 days prior notice.
8.2 Second Party has the right to terminate Agreement on 30 days prior written notice, if
eligible consumer breaches a term of this Agreement and does not remedy the breach
within 30 days of receiving written notice from Second Party of the breach
8.3 First Party agrees that upon termination of this Agreement, he must disconnect the
Photovoltaic System from Second Party’s distribution system in a timely manner and
to Second Party’s satisfaction.
In the witness, whereof of Mr………..for and on behalf of First Party and Mr……….for and
on behalf of Second Party sign this agreement in two originals.
First Party Second Party
Name Name
Address
Designation
K-Number (A/C No.) of consumer Office Address
Discom :-Distribution Licensee of the area.
Compendium of HPERC Regulations, March 2021 19
Notification and Orders issued
Under
[1
The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid
Interactive System based on Net Metering) (First Amendment) Regulations, 2018]
NOTIFICATION
Shimla, the 6
th
November, 2018
No. HPERC-H(1)-11/2015.—The Himachal Pradesh Electricity Regulatory Commission, in
exercise of the powers conferred by Section 181, read with Sections 61, 66 and 86(1) (e) of
the 2003 (36 of 2003), and all other powers enabling it in this behalf, after previous
publications, hereby makes the following amendment regulations, namely:—
REGULATIONS
1. Short title and commencement.—(1) These regulations may be called the Himachal
Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System
based on Net Metering) (First Amendment) Regulations, 2018.
(2) These regulations shall come into force from the date of their publication in the
Rajpatra, Himachal Pradesh.
By order of the Commission
Sd/-
Secretary
1
Published in R.H.P. dated 14.11.2018 at p. 6010-6010.
20 Compendium of HPERC Regulations, March 2021
1
[The Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid
Interactive System based on Net Metering) Order, 2019].
NOTIFICATION
Shimla, the 30th March, 2019
No. HPERC-H(1)-11/2017.—The Himachal Pradesh Electricity Regulatory Commission, in
exercise of the powers conferred by Section 181 and under sub-regulation (9) of Regulation
10 of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid
Interactive System based on Net Metering) Regulations, 2015 and all other powers enabling
it in this behalf, after previous publications, hereby makes the following Order, namely:—
ORDER
1. Short title.—This Order may be called the Himachal Pradesh Electricity Regulatory
Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) Order,
2019.
2. Applicability. —(i) This Order shall be applicable to such domestic supply consumers to
whom Letter of Approval for installing Rooftop Solar PV Grid Interactive System based on
Net Metering is issued after 15th November, 2018 as per the Himachal Pradesh Electricity
Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering)
Regulations, 2015 and who have thereafter installed such system.
(ii) This order shall be applicable only in such cases where the domestic supply
consumer installs the solar rooftop photovoltaic (PV) grid interactive system based on net
metering which directly convert Solar Energy into Electricity, using the crystalline silicon or
thin film technology or any other technology as approved by the Ministry of New and
Renewable Energy and are connected to the Grid.
3. (i) The distribution licensee shall compute the per kWh rate payable to domestic supply
consumers for the energy credits at the close of settlement period from their Rooftop Solar
PV Grid Interactive System based on Net Metering for each settlement period and the same
shall be equal to 30% of the weighted average per kWh rate at which it has purchased power
from the ground mounted solar PV plant upto 5 MW capacity located in the State during the
calendar year ending on 31st December falling in the relevant settlement period for which
the rate is to be determined.
(ii) This tariff/rate shall be subject to the provisions of the Himachal Pradesh Electricity
Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering)
Regulations, 2015 and the orders as may be issued by the Commission thereunder from time
to time.
1
Published in R.H.P. dated 2
nd
April, 2019 at p. 35-36.
Compendium of HPERC Regulations, March 2021 21
(iii) The distribution licensee shall make payment, as per the above mentioned tariff/rate,
to the eligible domestic consumers, for the electricity credits, if any, remaining unadjusted at
the end of settlement period during the useful life of 25 years of the rooftop solar PV system.
(iii) The distribution licensee shall workout the weighted average rate for purchase of
energy in respect of each calendar year on the above lines and upload on its website, the rate
payable for each completed settlement period by 15th day of the month of February in each
year i.e. about 45 days immediately preceding the close of the relevant settlement period for
which the rate is to be determined.
Place: Shimla. By order of the Commission
Date: 30th March, 2019 Sd/-
Secretary.
Previous and next
Questions people ask
Is form 2 of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015 is recorded.