Regulation 8, The Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015: l l The grading system for reporting the reliability ofthe Perfonnance Standards shall be set as under
The Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 - Regulation 8
Text of regulation 8
l l The grading system for reporting the reliability ofthe Perfonnance Standards shall be set as under
8.l l The grading system for reporting the reliability ofthe Perfonnance Standards shall be set as under:-
1 eliahility Grade Aseusment of Reliability Grade I
Based on proper records with adequate procedures
Data has significant procedural deviations
Unsatisfactory data
j
8. l2 Only if the reliability is of' the Grade A. further analysis will be carried out to measure claims on achievement.Accuracy Grading
8. l3 Based on the aecurac
Accuracy Assessed Accuracy Percentage of compensation paid to be recovered through-
Grade Level Annual Revenue Requirement
+/-2%
100% 7
+/-5%
85%
44-10%
70%
[31W 111-“ 4] ‘TRH $1m : mm 27
m ""
9. C MP AIN HANDLI M CHANISM
9.l The Licensee shall devise its own processes at Complaint Handling Centres! Call Centre (3)1’Customer Care
Centre(s) or any other customer interface channels to handle consumer complaints. The processes should
include the following:-
a. Registration of complaints by allotting a unique identification number to be called the complaint number:
b. Communication to consumer of the complaint number, dataftime of‘ registration of the complaint and
expected complaint resoluticm time to the consumer;
e. Record details of each complaint (As per Annexure — l).
d. Intimate contact details ofthe next higher authority (including his name. telephone number and address) It)
the consumer in case the consumer is not satisfied with the complaint handling or when requested by him;
and
e. Update and record feedback of the consumer on the action taken along with the total time taken for
resolutioa of the complaint.
Establishment of call centre (5)
9.2 Licensee shall within the following time limits, from the date of commencement of these regulations, establish
call centre(s) for redressal of complaints of its consumers, and such Call Centre(s) shall be accessible to its
consumers round the clock 'during all days of the week.
a. For “Urban Areas“ within 6 months;
b. For “Rural Areas” within l2 months; and
c. For “Remote Areas" within 24 months.
The Licensee shall use the existing channels for recording the consumer complaints as per the procedure
defined in Regulation 9.] till the establishment of Call Centre(s).
Every licensee shall depute adequate number of staff at its Call Centre(s) and earmark or allot or establish a
basic telephone or cellular mobile telephone number having sufficient lines or connections to be called as the
“toll free number” or “Consumer Care Number”, as the case may be.
The Licensee should ensure availability of electronic data base to record complaints as per the procedure
defined in Regulation 9.] for the Ca]! Centre(s). This data bank should also be linked with the Consumer
Billing Data Base.
Creating awareness
9.6 Every licensee shall, immediately upon establishment of its Call Centre(s). inform through a Public Notice in
information to the consumers in case of any changes in the contact numbers. information should be prepared in
English, Hindi and local languages and should be accessible to conSumers easily.
The Licensee should publish the guaranteed standards of performance along with compensation structure and
information on procedure for filing of complaints. in the bills for month of January and July. If it is not
possible to publish the same at the back of the bills. the licensee should publish it on a separate hand out and
distribute it along with the bills.
newspapers in circulation in the area of supply. The licensee should also enSure proper Circulation of
e
‘
-
r
—
—
—
—
_
.
28 THE GAZETTE OF lNDlA : EXTRQORDINARY [PART Ill—SEC.£
IO. SQ§MI§SIQN OF REPQRTS
Guaranteed Standards
10.] The Licensee shall furnish to the Commission within l5 days from the close ofeach quarter. a quarterly reporproviding the following information:
a. Performance levels achieved by the licensee with reference to the guaranteed standards (specified itSchedule — l of these regulations) in the format as provided in Annexure — ll ofthese regulations;
b. Measures taken to improve the performance; and
c. Details regarding the cases in which compensation was paid, as per format provided in Annexure — H 0these regulations.
Overall Standards
10.2
ll.
“.2
12.
I‘The Licensee shall furnish to the Commission within IS days from the close of each quarter. a quarterly reportproviding the following information:
a. Level of performance achieved with reference to the overall standards (specified in Schedule — l l oftheseregulations) in the format as provided in Annexure —« III of these regulations; and
b. Measures taken by the licensee to improve performance in the areas covered by overall standards.
LIN L N AN Ex I. IONS FEVENTS
A power interruption shall include any outage in the distribution system. extending from the distributioisubstation to the consumer meter, which may be due to the tripping of protective devices during faults or th -failure of distribution lines and / or transformers, and which results in the loss of power supply to one or moreconsumers.
The application of the Standards of Performance specified in these Regulations shall remain suspended in caseofthe following events:
a. force majeure events such as war, mutiny, civil commotion, riots, floods, cyclone, lightning. earthquake c4other force and strike, lockout, fire affecting licensee‘s installations and activities;
b. outages due to generation failure or transmission network failure;
c. outages that are initiated by the National Load Despatch Centre/Regional Load Despatch Centre/ Sta“Load Despatch Centre during the occurrence of failure of their facilities: and
d. outages due to such other events which are with the approval of the Commission afler due notice anfihearing.
'
EPEQL QED §AVINQ§
Save as otherwise provided in these Regulations, the Joint Electricity Regulatory Commission (Standards ofPerfonnance) Regulations, 2009 are hereby repealed.
[“IT'T 111-“ 4] WWW : mm! 29___———__________—_____
Notwithstanding such repeal anything done or action taken or purported to have been taken. or proceedings
initiated under such repealed Regulations, shall be deemed to have been taken under these Regulations to the
extent that the same were not inconsistent with the Act.
13. W T EM 1
If any difficulty arises in giving effect to any of the provisions of these Regulations, the Commission may, by
general or special order. do or undertake or direct the licensees to do or undertake things, which in the opinion
of the Commission are necessary or expedient for the purpose of removing the difficulties.
14. P W EN
The Commission may. at any time and on such times as it may think fit, amend. alter or modify any provisions
of these Regulations or remove any error or defect in these Regulations.
SCHEDULE - l
GUARANTEED STANDARDS OF PERFORMANCE
SLNO. Nature of cause of Powe'r Maximum Time Limit for Restoraflon
Supply Failure
1. Fuse Blown out or MCB Tripped Within 4 hours for Urban area
Within 8 hours for Rural areas
Within 12 hours in Remote Areas
2. Service Line Broken! Within 6 hours for Urban areas
Service Line snapped from the Within 12 hours for Rural areas
Pole Within 18 hours for Remote areas
3. Fault in Distribution Line I Rectification of fault and thereafter Restoration of normal power
System supply within 12 hours
Temporary Supply to be re'stored within 4 hours from alternate source.
4. HT Mains failed Rectification of fault within 12 hours.
Temporary restoration ofpower supply within 4 hours.
5. Break down of underground Rectification of fault within 24 hours of occurrence of break down
cable after obtaining clearances.
Temporai'y‘restoration of supply within 4 hours .
6. Distribution Transformer Replacement of failed Transformer: '
'Failed/Bumt Within 24 hours in Urban areas
Within 48 hours in Rural areas
Within 60 hours in Remote areas
Temporary Restoration of supply through mobile transformer or
another backup source within 8 hours in Urban areas, 12 hours in
Rural areas and 18 hours in Remote areas.
.
E
l
f
“
;
fi
_
_
_
_
l
30 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll—SEC. 4]
7. Problem in grid (33 kv or 66 kv Repair and restoration of supply within 48 hours. j
0' I '0 kv) substation Restoration of supply fi'om alternate source, within 6 hours.
Roster load shedding may be carried out to avoid overloading of
alternate source.
8. Failure of Power Transformer Rectification Action Plan to be intimated to the Commission within 72
hours.
Rectification to be completed within the time fi'ame approved by the
Commission.
Restoration of supply fi-om alternate source within 6 hours
Roster load shedding may be carried out to avoid overloading of
alternate source.
9. Period ofscheduled outages Interruption in power supply due to scheduled outages, other than the
load-shedding, shall be notified by licensee at least 24 hours in
advance and shall not exceed 12 hours in a day.
Quality of Supply
10. Voltage fluctuations Licensee shall maintain voltages at the point ofcommencement of the
supply to a consumer within the limits stipulated as under, withreference to the declared voltage:
a. 1n the case ofLow Voltage , +6% and -6%
b. 1n the case of High Voltage, +6% and «9%; and
e. In the case ofExtra High Voltage. +10% and 42.5%1 1. On receipt of a voltage fluctuation complaint, licensee shall verify if the voltage fluctuation is exceeding thelimits specified and upon confirmation, licensee shall resolve the problem within the time limits specifiedbelow:-
1. Local problem on the Within 3 days
transfonner
ii. Distribution Network a. Within 15 days for LT system and 30 days for HT system,problem where no expansion or enhancement of network is involved.
b. Within 180 days if upgradation of distribution system is
required.
12. _ In case where substation is required to be erected to resolve voltage fluctuation complaints, licensee. shall.within one month of the receipt of such complaint. submit to the Commission a proposal for erection ofsubstation, together With the time required to complete erection and commussromng of such substation andget the same approved by the Comrnlsston In such cases, licensee 15 requrred to Inform the consumer aboutthe likely time of resolution of the complaint Prowded that where such substation IS covered in thelicensee‘s capital expenditure plan approved by the Commissaon, the licensee shall complete the erectionand commissioning of such works within the time period specified in such capital expenditure plan.
13. Industrial and agricultural consumers, who are expected to install capacitors at their end, shall not be paidthe compensation ifcapacitors ofadequate capacity are not installed by them at their premises.
[W 111-“ 4] wwm:m 3|
l4. Complaints about Meters
Subject to the provisions of the Electricity Supply Code:
SLNO. Nature of Comptaint Time to be taken by Licensee
i. Complaint lodged for accuracy Within 30 days of receiving the complaint, the Licensee shall test the
test of meter meter and if needed, the‘ meter shall be replaced within 15 days
thereafter.
ii. Complaint lodged for defective / Within 15 days of reCeiving the Complaint, the Licensee shall check
stuck meter the meter and if needed, the meter shall be replaced within 15 days
thereafier.
I
iii. Complaint lodged for burnt meter The Licensee shall restore supply within 6 hours upon receipt of
complaint bypassing the burnt meter, and new meter shall be
provided within 15 days.
15. Transfer of Consumer‘s connection and conversion of services
The Licensee shall give effect to a request for transfer of consumer‘s connection. change of category andconversion of the existing services from Low Tension to High Tension and vice-versa within the following time
limits:
Nature of request Time to be taken by Licensee
i. Change of consumer’s name due to Change shall be effected in two billing cycles.
change in ownership/occupancy for
property
ii. Transfer of consumer’s name to Change shall be effected in two billing cycles.
legal heir
iii. Load reduction Licensee, after verification, shall sanction the reduced load within 30
‘ days afier receipt ofthe application.
L
1 1V. Change of category Licensee shall inspect the premises and change the category within 10
days from the date of receipt of application.
v. Shifiing of meter/service line etc. 1. One month for giving the estimated amount to the consumer
for shifting.
2. Within one month of the consumer depositing the estimated
amount as mentioned above.
I
lo. Complaints about consumer‘s bills
I SLNO. Nature ofComplaint Time to be taken by Licensee
1...
l i.
Compiaints on billing
Licensee shall acknowledge the complaint immediately, if‘ received in
person. or within 3 days from the date of receipt if received by post.
If no additional information is required, Licensee shall resolve the
complaint and intimate the result to the consumer within 7 days of
receipt of the complaint. In case any additional information is
required, the same shall be obtained, the issue resolved and result
._
_‘
__
._
..
_.
2
._
32 THE GAZETTE OF INDIA 2 EXTRAORDINARY [PART 1|1¥SF('. 4]
intimated to the consumer within 7 days of the receipt of the
additional information, whichever is later.
17. Issues relating to disconnection / reconnection ofsupply
Issue under consideration Time to be taken by Licensee
1. Non payment of dues by the Licensee to give 15 days notice to pay the dues and if not paid. the
consumer Licensee may disconnect the consumer’s installation on the expiry of
the notice period.
ii. Request for reconnection In case consumer requests for reconnection within a period of six
months afier disconnection. the Licensee shall reconnect the
consumer's installation within 5 days of payment of past dues and
reconnection charges.
However in case consumer requests for reconnection afier six months
of disconnection, the connections would be reconnected only after all
the formalities as required in the case of a new connection are
complied with by the consumer including payment of pending dues.
Service Line Charges, Security Deposit etc. as applicable, for that
Category ofConsumer.
iii. Consumer wanting upto date bill Licensee to carry out special reading and prepare final bill. including
all arrears upto the date of‘billing within 7 days.
18. The time limits prescribed in this Schedule will be computed horn the time when the complaint is filed with thedesignated officers ofthe licensee or at the Call Centres.
1: Normal fuse - on calls
593mg”: — II
P NCE
The Licensee shall maintain the percentage of fuse ofl'calls rectified within the time limits prescribed at Sl. No.1 of Schedule — l of these Regulations to total calls received at not less than 99%.
2. Line Breakdowns
The Licensee shall ensure restoration of power supply within the time limits prescribed at Sl. No. 2 to 5 ofSchedule — l ofthese Regulations. The Licensee shall achieve this standard of performance in at least 95% ofdioceses.
3. omnbuuen Transformer Failures:
The Liomsee shall maintain the percentage of distribution transformers replaced within the time limitsprescribed at 81. No. 6 of Schedule — I of these Regulations to the total distribution transfonners failures at notless than 95%.
4. Problem in Grid substations including failure of Power Transformers
The Licensee shall ensure restoration of supply within the time limit prescribed at Sl. No. 7 and Sl. No. 8 ofSchedule - I ofthese Regulations in at least 95% of such cases ofpower supply failure.
[“lT'T 111-“ 4] . llill'fil '55?m :BTWW
33
5. Period of scheduled outages: _
Interruption in power supply due to scheduled outages, other than the load-shedding has to be notifiedinadvance and shall not exceed 12 hours in a'day and in each such event, the Licensee has to ensure that thesupply is restored by 6:00 PM. The Licensee shail achieve both of these standards of performance in at least95% ofthe cases.
6. Meter Complaints:
The Licensee shall achieve the Standard of Performance as specified at 8!. No. l4 of Schedule — I of theseRegulations in at least 95% of cases.
7. ' Voltage fluctuations complaints:
The Licensee shall achieve the Standards of Performance as specified at Sl. No. l I of Schedule — l of theseRegulations in at least 95% of cases.
8. Transfer of Consumer’s connection & Conversion of Services:
The Licensee shall achieve the Standards of Perfomtance as specified at Si. No. i5 of Schedule — i of theseRegulations in at least 95% ot'ceees.
9. Complaint about Consumer’s bills:
The Licensee shall ensure Standards of Performance as Specified at 8!. No. 16 of Schedule — l of theseRegulations in at least 95% of cases.
it]. . Issues relating to Disconnection Reconnection of Supply:
The Licensee shall achieve the prescribed Standards of Performance as specified at Sl. No. 17 of Schedule — lofthese Regulations in 95% of cases.
I 1. Voltage Unbalance:
The Licensee shall ensure that the voltage unbalance does not exceed 3% at the point of commencement ofsupply; Voltage Unbalance (VU) shall be computed in the following manner: -
Voltage Unbalance = (VH-VL)NH:
Where VH and VL are highest and lowest phase Voltage for LT System or highest and lowest phase Voltagesfor HT & EHT Systems.
.1
12. Billing mistakes:
The Licensee shall maintain the percentage of bills requiring modifications following complaints to the totalnumber of bills issued, not greater than 1%.
13. Faulty Meters:
The Licensee shall maintain the percentage of defective meters to the total number of meters in service, notgreater than 3%.
14. Minimize electrical accidents:
Increase or decrease in no. of electrical accidents compared over a period of time will also be an indicator of theLicensee’s Performance. .
.3236 611/15 -5
‘
—
\
:
r
'
“
‘
_
*
‘
—
—
.
l34
THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-—SEC. 4],
I i
Reliability lndices
!15. The Commission shall impose a uniform system of recording and reporting of distribution system reliability
licensee.
i
16 Based on the information submitted by licensees, the Commissmn would notify the target levels for the
reliability induces annually Licensee shall be evaluated annually to compare Licensees’ actual performance 1
with the targets.
17. The licensee shall compute the following distribution reliability indices separately for the Urban Area, rural
feeders:
System Average Interruption Frequency Index (SAIFI): The licensee shall calculate the value as per the
formula and methodology as specified at S]. No. 18 in this Schedule.
1: lelnm Annmnn [nfqrnnnfinn nnv-afinn lnrlnv {QATnnv 'T'hn linnnc-no rI-e
vJuuu... alv—uub' Anelvlhur-Avll uunnuvu "nu". \u- nnwl’. nu. uywlluvv uformula and methodology as specified at S]. No. 18 in this Schedule.
b. Momentary Average interruption Frequency index (MAIFI): The licensee shall calculate the value as perthe formula and methodology as specified at $1. No. 18 in this Schedule./
18. The indices shall be computed for licensee as a whole by stacking, for each month all the l lkv feeders in thesupply area and then aggregating the number and duration of all interruptions in that month for each feeder.
Thelindices would then be computed using the following fonnuiae:
- n
a. SAIFI= z (A' x N')1 N‘ ‘
ll=1
n
b. SAIDI= z (B' x N‘yNI
{=1 ,
n
c. MAIF1= z (c' x N')/N' .-
i=1
' Where,
A' = Total number of sustained interruptions (each longer than 5 minutes) on i‘'1Feeder for the month.
8' = Total duration of all sustained interruptions (each longer than 5 minutes) on i"'Feeder for the month.
Ci== Total number of momentary interruptions (each less than or equal to 5 minutes) on i‘h Feeder for the .month.
N = Number of Consumers of i“1 feeder affected due to each interruption.
N;= Total number of Consumers at I lit'v feeders in licensee‘s Supply area.
.
[mIn-w 4] WWW :merm . 35
n = Number of 11 RV feeders in licensee’s supply area (excluding agricultural feeders)
Ngte: .
aa. The feeders must be segregated into Urban Area and Rural and the value of the indices must be reported 5"separately for each month.
-)
b. Licensee shall propose the target level of these indices annually at the time of submitting ARR. TheCommission would thereafter notify these indices.
SCHEDULE - III
COMPENSATION
In case of‘ failure of licensee to meet the guaranteed Standards of Performance as specified in Schedule — l ofthese regulations, compensation shall be payable to the consumer. as shown in the table below:
Performance Parameters Standard Compensation payable in case of violation of
Standard (default shall be considered from thé‘time
consumer has made complaint)
Compensation payable to Compensation
Individual consumer if the payable to Individual
event affects a single Consumer if the
consumer event affects more
than one Consumer
1. Billittggf Consumers
1.. Raising ofFinal Bill Within 2 Billing 10% of the Billed amount
Cycles subject to maximum of Rs
250/- t2. In case Bills are raised even after Rs 250/— for each case Not Applicabledisconnection on consumer’s
request
3. Resolution ofBilling Complaints Resolve within 7 Rs 50/- for each day of
days of receipt of default
complaint, if no
additional
information is
required.
If required, within 7
days of receipt of
additional
'
.3.information.
4. Consumer requiring upto date bill Licensee to carry Rs 50/- for each day of NotApplicableout special reading default .
and prepare final
bill within 7 days
11. Transfer of consumer's connection and conversion of services
fl5. Change ofconsumer’s name Within 2 Billing Not Applicabledue to change in ownership! Cycles of
occupancy for property acceptance of
3;application
- E;6. Transfer of consumer’s name Within 2 Billing ' -
'to legal heir cycles of
§-acceptance of Rs 50/— for each day of‘ ‘application default ..
an.3‘7
Z Z 6 43/15 ‘ 6
. ‘21::-
l
Tripped (in case fuse or MCB
1 belongs to Licensee i.e. pole
I or feeder pillar fuse)
for Urban areas
Within 8 hours
for Rural areas
Within 12 hours
in Remote areas.
broken service
‘ line snapped from the Pole
Service line Within 6 hours
for Urban areas
Within 12 hours for Rural areas. of default
36 THE GAZETTE OF INDIAzEXTRAORDINARY [PARTlll—SEC. 4] L. —= =—=====‘,_ = -_=."
7. Load Reduction 30 days afier
receipt of the
application
3. ChangeofCategory wmmi 10 days of
acceptance of
application
Previous and next
Questions people ask
Is regulation 8 of the Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 still in force?
No repeal of the Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 is recorded.