Annexure RE -1, The Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015: ANNEX RE -1
The Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 - Annexure RE -1
Text of annexure RE -1
ANNEX RE -1
ANNEX RE -1
The format for Registering a Complaint in the Complaint Office shall be as under:-
SL. fife— & NAME. ADDRESS, NATURE COMP- REFERENCE TIME & TOTAL TIMENO. DATE OF CONTACT NO. OF 01" LAINT GUARANTEED DATE OF TAKEN FORRECEIVING COMPLAINANT COMP- NO. STANDARD REDRESSAL COMPLAINTCOMPLAINT
LAI‘NT
OF REDRESSAL
COMPLAINT (1N DAYS!
HRS/MTS)
mi
REERTINQ FQRMAT§ - GEARANTEED STANDQRDS
1. The following format shall be used by Licensee for reporting the Performance Levels for Guaranteed Standardson a quarterly basis to the Commission:-
GUARANTEED GUARANTEED PREVIOUS COWLAI'NTS TOTAL NO. or COMPLAINTS REDRESSED IN THE PENDHE
STANDARD STANDARD QUARTER RECEIVED m COMPLAINTS QUARTER (No.1 CpMP-
REFERENCE PWTER PENDING THE (No) WITHIN MORE [ TOTAL LAlNTS'
N0. COWLAINTS QUARTER STANDARD THAN THE commm (NO)(NO) (NO) TIME STANDARD REDRESSED
TIME
'
1. Fuse Blown Urban Area
:3); ”CB Rural Area
Remote Area
h2. Service Line Urban Area
or Snapped
from Pole Rural Area
Remote Area
3. Fault in
Distribution
System
4. HT Main
Failure
5. Breakdown of
underground
Cables
[em m—eme 4] . mum : mar - ' 39
6. Distribution Urban Area
Transformer
failure/ Burnt Rural Area
Remote Area
7. Problem in
Grid
Substation
8. Failure of 1
Power
Transformer
9. Period of
Scheduled
outages
10. (i). Voltage
fluctuations
in case fault
is identified ' '_
to a local _ ' .-
_ problem on
the
Transformer
10.(ii).(a). Voltage
fluctuation in
case no
expansion
augmentation
of network
requ ired
10.(ii).(b). Voltage
fluctuations
. in case
expansion
augmentation
of network
required
11.(i). Accuracy
testing of
Meter
l 1.(ii). Defective!
stuck Meter
11.(iii). Burnt Meter
12.(i). Consumer’s
name change
" 12.01). Transfer of
name to legal
heir
12.(iii). Load
Reduction
12.(iv). Change of
' Category
12.(v). Shifiing of
Meter/
Service Line
BIC.
13. Complaint on. Billing
THE GAZETTE OF INDIA : EXTRAORDINARY [PARTlll—SEC.4!
Request for
Reconnection
Consumer
wanting
special
reading of‘
meter and
upto date Bill
Time limit prescribed in Schedule —- 1 will be computed from the time when the complaint is filed with the
designated offices of the Licensee or at the Call Centre.
2. The quarterly information regarding the compensation shall be submitted by Licensee to the Commission in
the following format for individual complaints where compensation has been paid.
SLNO. COMPLAINT DATE OF CONSUMER NAME AND NATURE OF REFERENCE AMOUNT OF DATE OF
NO. FILING OF NO. ADDRESS COWLAI'NT GUARANTEED COMPENSATION PAYMENTOF
COMPLAINT OF STANDARD PAID (RS) mm
CONSUMER
‘-.
.‘i
l
l'
W
RE RTIN F TS — V ALL TA ARD
1. Licensee shall furnish the infomation with respect to the overall standards every quarter to the Commission in the
following format:-
OVERALL OVERALL NO. OF TOTAL NO. TOTAL NO. TOTAL NO. NO. OF
STANDARDS STANDARD COMPLAINTS OF 0F 0F COMPLAINTS
REFERENCE PARAMETER PENDING AS COMPLAINTS COMPLAINTS COMPLAINTS PENDING AT
NO. THE START FILED BY =tA+B) REDRESSED THE END OF
OF THE THE WITHIN THE THE
QUARTERM) CONSUMERS STIPULATED QUARTER
1N THIS TIME
QUARTER(B)
1. Normal fuse off
Cables
2. Overhead Line
Cable Breakdown
including
underground Cable
Breakdown
3. Distribution
Transformer
Failures
4. Grid Substation
problem including Power Transformer
Failure
[Inn 111-“ 4]
5. Period of Scheduled
Outages
6. Meter Complaints
7. Voltage Fluctuation '
Complaints -
8. Transformer of
Consumers
Connection/Services
9. Consumers Bi] ls
Complaints
10. Disconnection
Reeonnection of
Supply
2. The quarterly information regarding faulty meters shall be submitted by Licensee in the following format:-
REFERENCE NO. OF FAULTY NO. OF TOTAL NO. NO. OF METERS NO. OF FAULTY
OVERALL METERS AT FAULTY OF FAULTY RECTIFIED/REPLACED METERS
STANDARDS THE START OF METERS METERS PENDING AT
THE QUARTER ADDED THE END OF
DURING THE THE QUARTER
QUARTER
3. The proforma for submission of quarterly report on reliability indices shall be as follows:-
SL.N0. MONTH Ni= NUMBERS 0F Ai = TOTAL Ni = TOTAL =2 (A1 " Ni) SAIF1={2)I(I)
CONSUMERS OF i‘h NUMBER QF NUMBER 0? FOR ALL 11KV
FEEDER AFFECTED SUSTA'WED CONSUMERS FEEDERS
FOR EACH INTERRUT’TIONS AT l ”(V IN EXCLUDING
lNTERRUPTEON (EACH LQNGER LICENSEES AGRICULTURE
THAN 5 u AREA OF FEEDERS (2)
M1NUTES)0£1 i"‘ SUPPLY u )
FEEDER FOR
THE MONTH
1
N
TOTAL
42 THE GAZETTE 0F INDIAzEXTRAORDlNARY _ [PART lll—SEC. 4]
SLNO. norm! Ni= NUMBER OF Bi=TOTAL N1 = TOTAL =EtBi'Ni) smmamn. CONSUMERS 0? i.1 DURATION OF NUMBER OF FOR ALL nxv
FEEDER AFFECTED susumsa. CONSUMERS FEEDERS
FOR EACH INTERRUPTIONS AT IIKV m EXCLUDING
INTERRUPTION (EACH LONGER LICENSEES AGRICULTURE
THANS ' AREA or FEEDERSIZ)
M1NUTES)ON i‘“ SUPPLY ( l)
FEEDER FOR
THE MONTH
[
N
TOTAL
|SL.NO. MONTH Ni- NUMBER OF Ci=Tf0TAL N1 = TOTAL =z(Ci-Ni) MA1F1={2)/(l)
CONSUMERS OF i"' NUMBEROF NUMBER OF FOR ALLIIKV
FEEDER AFFECTED MOMENTARY CONSUMERS FEEDERS
FOR EACH INTERRUPTIONS AT llkv IN EXCLUDING
INTERRUPTION (EACH LESS LlCENSEES AGRICULTURE
THANOR AREA OF FEEDERS(2)
EQUAL TO 5 SUPPLY (1;
MINUTES ON 1'"
FEEDER FOR
THE MONTH
1
N
TOTAL
Printed by the Manager. Government of India Press, Ring Road, Mayapuri.‘New Delhi-l 10064
and Published by the Controller of Publications, Delhi-l 10054.
Previous and next
Questions people ask
Is annexure RE -1 of the Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 still in force?
No repeal of the Joint Electricity Regulatroy Commission for the state of Goa and UT(Standard of Performance for Distribution licensees)Regulation,2015 is recorded.