Rule 30, The Karnataka Cinemas (Regulation) Rules, 2014.: Application for approval
The Karnataka Cinemas (Regulation) Rules, 2014. - Rule 30
Text of rule 30
Application for approval
30. Application for approval.- On receipt of the No Objection Certificate, the applicant
shall submit an application for approval of the plan of the building to be constructed on the
approved site to the Licensing Authority. Such application shall be accompanied by,-
(i) a copy of the no objection certificate granted under rule 27;
(ii) a copy of the approved site plan;
(iii) complete plan, elevation and sections in quadruplicate in original printed on
tracing film and also in digital format with four prints of the premises and of all
erections and buildings thereon drawn correctly to a scale of not less than 1:100 on
prints taken out of any of the standard size tracings and showing clearly,-
(a) all dimensions in millimeters and materials of construction indicating the
different materials in distinguishing colours and giving in figures dimensions the
width and depth of walls, beams, scantlings and trusses;
(b) the width of all staircases and the number of steps in each flight with the rise
and tread of steps the clear width of corridors, passages, openings, aisles and
gangways as well as the height and constructions of all galleries, tiers, balconies
and stages; and fire resistance rate of staircases shall be one hour. No gas
pipeline or electrical lines shall be attached to it. Anti slippery nosing shall be
installed for the steps. One metre height of handrail be provided.
(c) the sizes of all doors, windows and ventilators indicating their construction and
the way in which they open and the proposed system of ventilation;
(d) the proposed seating arrangement;
(e) the plinth area of each building in square meters separately for ground floor and
upper floors and in tiers, galleries or balconies;
(f) staircases;
(g) water closets and urinals;
(h) levels at the different parts of the building in plans and sections; and
(i) details and positions of projectors, screen, sound box and other plants and
equipment;
(iv) detailed specifications of the works in triplicate to be executed, sufficiently
describing the material to be employed and the mode of construction to be adopted with
calculations, in triplicate showing the loads coming and stresses occurring in all foundations,
piers, columns, stanchions, lintels, beams, slabs, joists and trusses, such calculations being
certified to be correct by a graduate engineer or a design engineer or a design practitioner or a
qualified architect
31. Procedure for approval of plans, etc._ (1) On receipt of the application and
particulars specified in rule 30, the Licensing Authority shall simultaneously forward the
applications and particulars to the Town Planning Officer of City Corporation / Urban
Development Authority/ Planning Authority / Assistant Director Town and Country Planning
as to verify whether the building plans satisfy the requirements of these rules and whether
the building proposed to be built is suitable for a cinema and to submit a report to the
Licensing Authority within fifteen days.
(2) On receipt of the report under sub-rule (1), the Licensing Authority shall forward
the connected records to the executive engineer, Public works Department of the district. The
executive engineer, Public works, Ports and inland transport Department shall examine the
design calculations and if he is satisfied after scrutiny that the building if constructed as per
the specifications and designs would be sound enough, he shall within fifteen days forward his
report to the Licensing Authority, attaching a certificate that the specifications and designs are
acceptable.
(3) On receipt of the acceptance of design and specification by the executive engineer
Public works, Ports and inland transport Department, the Licensing Authority shall direct the
applicant to submit the plan, elevation and electrical drawings in quadruplicate in blue print or
computer print and also in digital format showing the location of the cinematograph apparatus
and complete electrical installations wiring diagram indicating all wiring, light- points,
switches, plugs, distribution boards and other electric machinery indicating different circuits in
different colours and earthing details to the Electrical Inspector.
(4) Thereafter, the Electrical Inspector shall examine the designs pertaining to the
cinematograph plant, the electrical installations along with electrical wiring diagram and plan
details showing the electrical system submitted by the applicant and if he is satisfied after
scrutiny, that they are in accordance with the provisions of these rules relating to safety of
electrical installation, he shall forward his report to the Licensing Authority within fifteen
days.
Previous and next
← Rule 29Application for construction of additional cinema within the licensed premises of a Permanent cinema buildingRule 32 →Grant or refusal of approval of plan
All provisions of The Karnataka Cinemas (Regulation) Rules, 2014.
Questions people ask
Is rule 30 of the Karnataka Cinemas (Regulation) Rules, 2014. still in force?
No repeal of the Karnataka Cinemas (Regulation) Rules, 2014. is recorded.