APPENDIX - II
APPENDIX - II
Memorandum for In-Principle Approval for Financial Support from Tamil Nadu Infrastructure Development Fund.
(See rule 12)
S. No. Parameters Response
1. General
1.1 TNIDB Project ID
1.2 Name of the Project
1.3 Sector
1.4 Sponsoring Agency
2. Project Description
2.1 Brief description of the project
2.2 Justification for the project
2.3 Type of PPP
(Refer Schedule II of the Act)
(Tick the appropriate type)
O Build-Operate-Transfer (BOT)
O Build-Own-Operate (BOO)
O Build-Own-Operated-Transfer (BOOT)
O Build-Transfer-Operate (BTO)
O Design-Build-Finance-Operate-Transfer
(DBFOT)
O Management Agreement
O Lease Management Agreement
O Built-Lease-Transfer (BLT)
O Rehabilitate-Operate-Transfer (ROT)
O Rehabilitate-Own-Operate (ROO)
2.4a Estimated Total Project Value (please
refer Explanation under Section 1(3)
Rs.
2.4b Estimated total project cost (refer Rule
2(h)) with break-up under major heads of
expenditure and the basis of cost
estimation
Rs.
2.5 Phasing of investment
2.6 Project Implementation Schedule
a Probable date of bidding:
b Probable date of LOA:
c Probable date of signing of Concession
Agreement:
10
S. No. Parameters Response
d Probable date of COD:
e Duration of Concession:
3. Financing Arrangements
3.1 Has the financial model for the projects
been developed
If yes, attach a copy of the same
Yes / No
3.2 Indicate the revenue streams of the
Project (annual flows over project life).
Also indicate the underlying assumptions
a Direct recovery from the project through
user charges
Rs.
b Real estate development, if any? Rs.
c Advertisement revenue Rs.
d Others, if any (Please specify). Rs.
e Total Rs.
3.3 Resources to be raised by the
Concessionaire
a Equity base of Concessionaire of which–
1. Authorized capital Rs.
2. Equity capital structure Rs.
3. Preference share capital Rs.
b Debt to be raised of which
1. Senior Debt Rs.
2. Subordinate Debt Rs.
3. Any other Rs.
3.4 Public Financial Support expected Yes / No
3.5 Type of Public Financial Support
Expected:
a Subsidy/Capital Grant during
construction period
Rs.
b Operational grants during construction
period
Rs.
c Equity Rs.
d Loans (with interest or without) Rs.
e Government guarantee Rs.
f Escrow Account
g Development rights on land (including
tradable development rights)
11
S. No. Parameters Response
h Incentives from Government in the form
of concessions on payment of taxes,
duties and other statutory levies (Please
specify)
i Any other concession from Government
(please specify)
3.6 Sources of Public Financial Support:
a Sponsoring Agency’s internal resources Rs.
b Budgetary allocation, if any Rs.
c Eligibility for accessing Government of
India VGF
Yes / No
d Accessing Government of India VGF Yes / No
e Extent of Government of India VGF
envisage
Rs.
f Other financing arrangements, if any Yes / No
g Extent of other financing arrangements Rs.
h Sub-total Rs.
3.7 Financial support expected from TNIDF
a Support from TNIDF envisaged and
reason for seeking such support?
Yes / No
b Extent of financial support from TNIDF
envisaged?
Rs.
c Form of support
1. Subsidy/Capital Grant during
construction period
2. Operational Grant during operations
period
3. Annuity
4. Equity
5. Loan
6. Sub-total
d Is State Support including support from
TNIDF to be a tender criterion?
3.8 Indicate the revenue streams of the
Project (annual flows over project life).
Also indicate the underlying
assumptions.
1. Direct recovery from the project
through user charges.
2. Real estate development, if any?
12
S. No. Parameters Response
3. Advertisement revenue
4. Others, if any (Please specify)
3.9 Indicate the NPV of revenue streams with
discount rate
3.10 Who will fix the tariff/user charges?
Please specify the process in detail.
3.11 Will the project have predetermined user
charges/tariffs
3.12 Can the user charges/tariffs be increased
for reducing the State support? If no,
please furnish an undertaking for the
same.
3.13 Can the concession period be increased
for reducing the state support? If no,
please furnish an undertaking for the
same.
3.14 Can the total project costs be restricted
or phased out for reducing the state
support? If no, please furnish an
undertaking for the same.
4 IRR
4.1 Economic IRR (if computed)
4.2 Financial IRR, indicating various
assumptions (attach separate sheet if
necessary)
5 Clearances
5.1 Status of environmental clearances
5.2 Clearance required from the State
Government and other local bodies
5.3 Other support required from the State
Government
6 Concession Agreement
6.1 Is the Concession Agreement based on a
duly approved model concession
agreement? If yes, indicate the details
thereof (in a note to be attached).
6.2 Draft Concession Agreement been vetted
by the Board? If not enclose copy.
7. Criteria for short-listing of the private sector participant
7.1 Is short-listing to be in one stage or two
stages?
13
S. No. Parameters Response
7.2 Indicate the criteria for short-listing
(attach separate sheet if necessary)
8. Others
8.1 Remarks, if any
14
Previous and next
All provisions of TAMIL NADU INFRASTRUCTURE DEVELOPMENT RULES 2012
Questions people ask
Is appendix II of TAMIL NADU INFRASTRUCTURE DEVELOPMENT RULES 2012 still in force?
No repeal of TAMIL NADU INFRASTRUCTURE DEVELOPMENT RULES 2012 is recorded.