Regulation 2, The Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012: Definitions and Interpretation
The Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 - Regulation 2
Text of regulation 2
Definitions and Interpretation
2. Definitions and Interpretation.- (1) In these Regulations, unless the context otherwise
requires,-
(a) ‘Act’ means the Electricity Act, 2003 (36 of 2003);
(b) ‘Auxiliary energy consumption' or 'AUX' in relation to a period in case of a project
means the quantum of energy consumed by auxiliary equipment of the generating
station, and transformer losses within the generating station and/or switchyard thereof,
expressed as a percentage of the sum of gross energy generated at the renewable
energy generator terminals of all the units of the generating station;
(c) ‘Capital cost’ means the capital cost as defined in regulation 20;
(d) ‘Commission' means the Himachal Pradesh Electricity Regulatory Commission
referred to in sub-section (1) of section 82 of the Act;
(e) ‘Conduct of Business Regulations' means the Conduct of Business Regulations
specified by the Commission under sub-section (1) of section 92 of the Act;
(f) ‘Control period or review period' means the period during which the norms for
determination of tariff specified in these Regulations shall remain valid;
(g) ‘Date of commencement of operation of the project’ means the date on which the
first unit of the project is synchronized with the grid for the first time;
1
Sub. for “31.03.2017”vide Not. No. HPERC/428 dated 31
st
March, 2017 published in the R.H.P.
dated 6
th
April, 2017at p. 83-85.
Compendium of HPERC Regulations, March 2021 3
(h) ‘Renewable energy generator’ means the person(s) generating or intending to
generate energy, including cogeneration, from renewable energy sources;
(i) ‘HIMURJA’ means the Himachal Pradesh Energy Development Agency set up by
the State Government for the development of the renewables;
(j) 'Installed capacity' or 'IC', for the purpose of tariff determination, means the
summation of the name plate capacities of all the units of the generating station,
(reckoned at the renewable energy generator terminals), or the capacity for which
the renewable energy generator has executed implementation agreement with the
State Government, whichever is higher;
(k) ‘Interconnection facilities’ means all the facilities and works which shall include,
without limitation, switching equipment, protection control and metering devices etc.
and all the associated works (also including civil and electrical works), for the
incoming bay(s) for the project line(s) at the interconnecting sub-station of the
licensee and shall also include any other works like re-organisation of bays at the
interconnecting sub-station and associated civil works as may be required for
facilitating the said incoming bays;
(l) 'Inter-connection point' means the physical touch point where the project line(s)
and the allied equipments of the interconnection facilities, forming part of the
renewable energy project, are connected, or are to be connected, with the
transmission system or distribution system, in accordance with the interconnection
agreement/connectivity agreement or power purchase agreement or the power
system master plan/sub-plan of the State Transmission Utility/distribution licensee,
as may be relevant;
(m) ‘Licensee’ means a person to whom a licence has been granted or deemed to have
been granted by Commission under Section 14 of the Act;
(n) 'MNRE' means the Ministry of New and Renewable Energy of the Government of
India;
1
[(na) ‘Municipal Solid Waste’ means and includes commercial and residential wastes
generated in a municipal area or its adjoining areas in either solid or semi-solid form
excluding industrial hazardous wastes but including treated bio-medical wastes;]
(o) ‘Net saleable energy’ in relation to a period and in respect of a project, means the
quantum of energy available for sale from that project at the interconnection point in
that period, after allowing auxiliary consumption, transformation losses in the
transformers at the generating station and its switchyard, the losses in project line(s)
upto the interconnection point and free power, if any, to the State Government;
(p) ‘Non fossil fuel based co-generation’ means the process in which more than one
form of energy (such as steam and electricity) are produced in a sequential manner
1
Ins. clause (na) vide Not. No. HPERC/428 dated 11
th
April, 2016 published in the R.H.P. dated
13
th
April, 2016 at p. 235-237.
4 Compendium of HPERC Regulations, March 2021
by use of biomass provided the project may qualify to be a co-generation project if it
fulfills the eligibility criteria as specified in clause (d) of Regulation 4;
(q) 'Operation and maintenance expenses' or 'O&M expenses' means the
expenditure incurred on operation and maintenance of the project, or part thereof,
and includes, without limitation, the expenditure on manpower, establishment
(including employees expense, administrative and general expenses), repairs,
spares, consumables, insurance and overheads as well as the taxes, duties and other
levies on any or all such activities;
(r) 'Project' means a generating station alongwith generator/ step up transformers at
power house switchyard, the evacuation system upto the interconnection point,
including interconnection facilities, and in the case of a small hydro generating
station includes, without limitation, all components of generating facility such as
dam, intake water conductor system, power generating station and generating units
of the scheme, as apportioned to power generation in addition to the project line(s)
and the interconnection facilities;
(s) ‘Project line’ means the evacuation infrastructure from the generating station to the
interconnecting sub-station of the licensee, to be provided, operated and maintained
as a part of the project by the renewable energy generator(s) for the purpose of
evacuation of power from the project;
1
[(sa) ‘Refuse Derived Fuel’ means segregated combustible fraction of solid waste other than
chlorinated plastics in the form of pellets or fluff produced by drying, shredding,
dehydrating and compacting combustible components of solid waste that can be used as
fuel; and]
(t) ‘Renewable energy’ means the grid quality electricity generated from renewable
energy sources;
(u) ‘Renewable Energy Certificate mechanism’ or ‘REC mechanism’ means the
mechanism devised for the development of market in power from non-conventional
energy sources by issuance of transferable and saleable credit certificates under the
Central Electricity Regulatory Commission (Terms and Conditions for recognition
and issuance of Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010, and the Himachal Pradesh Electricity Regulatory Commission
(Renewable Power Purchase Obligation and its Compliance) Regulations, 2010;
2[(v) ‘Renewable energy sources’ mean renewable sources of energy such as small hydro,
wind, solar including its integration with combined cycle, biomass, bio fuel
cogeneration, urban or municipal waste including Municipal Solid Waste (MSW)
based power projects and Refuse Derived Fuel (RDF) based power projects and other
such sources as approved by the MNRE.]
1
Ins. clause (sa) vide Not. No. HPERC/428 dated 11
th
April, 2016 published in the R.H.P. dated 13
th
April, 2016 at p. 235-237.
2
Sub. vide Not. No. HPERC/428 dated 11
th
April, 2016 published in the R.H.P. dated 13
th
April, 2016
at p. 235-237 and before its substitution it stood as under:-
“(v) Renewable energy sources’ means renewable sources of energy such as small hydro, wind,
solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or
municipal waste and other such sources as approved by the MNRE;”
Compendium of HPERC Regulations, March 2021 5
(w) ‘Small Hydro Project' or ‘SHP’ means a hydro power project with a station
capacity up to and including 25 MW and shall also include the project line(s) and
the Interconnection Facilities.;
(x) ‘Solar PV power’ means the Solar Photo Voltaic power project that uses sunlight
for direct conversion into electricity through Photo Voltaic technology;
(y) ‘Solar thermal power’ means the solar thermal power project that uses sunlight for
direct conversion into electricity through concentrated solar power technology based
on either line focus or point focus principle;
(z) 'Tariff period' means the period for which tariff is to be determined by the
Commission on the basis of norms specified under these Regulations;
(aa) 'Useful Life' in relation to a project shall mean the useful life of the following
duration from the date of commencement of operation of the project, namely:-
(a) Wind energy power project 25 years
(b) Biomas power project, non-fossil 20 years
fuel based cogeneration
(c) SHPs 40 years
(d) Solar PV/Solar thermal power plant 25 years
(e) any other renewable energy as may be
technology approved by the MNRE; fixed under regulation 17
(ab) 'Year' means a financial year.
(2) The words and expressions used in these Regulations and not defined herein,
but defined in the Act or the regulations issued by the Commission, shall have the meanings
assigned to them in the Act or in such regulations issued by the Commission; the words and
expressions used herein but not specifically defined in these Regulations or in the Act, but
defined under any law, passed by a competent Legislature and applicable to the electricity
industry in the State, shall have the meanings assigned to them in such law; the words and
expressions used herein, but not specifically defined in the Regulations or in the Act or any
law passed by a competent Legislature, shall have the meaning as is generally assigned to
them in the electricity industry.
Previous and next
Questions people ask
Is regulation 2 of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012 is recorded.