Verif ication and inspection of we ights or measures
14. Verif ication and inspection of we ights or measures.- (1) Every person using any
weight or measure in any transaction or for protection shall present such weight or measure
for verification I re-verification, at the office of the legal metrology officer or at such other
place as the legal metrology officer may specify in this behalf on or before the date on which
the verification falls due:
Provided that where any weight or measure is such that it cannot, or should not, be
moved from its location, the person using such weight or measure shall report to the legal
metrology officer at least thirty days in advance of the date on which the verification falls due.
(2) Where any weight or measure is such that it cannot, or should not, be moved from
its location, legal metrology officer shall take necessary steps for the verification of such
weight or measure at the place of its location.
(3) For the verification of weight or measure referred to in sub-rule (2), the user shall
provide such facilities as may be specified by the Controller.
(4) Every weight or measure presented for verification shall be complete in itself.
(5) Every weight or measure shall be verified in a clean condition , and if necessary,
the legal metrology officer shall require the owner or user to make necessary arrangement for
the purpose.
(6) A legal metrology off icer may visit. as frequently as possible during the period
specified in sub-rule (2) of rule 27 of the Legal Metrology (General) Rules, 2011, every
premise within the local limits of his jurisdiction to inspect and test any weight or measure
which is being or is intended or likely to be used in any transaction or for protection.
(7) The legal metrology officer shall obliterate the stamp on any weight or measure, if it
is found during inspection that,-
- 6 -
(a) any weight or measure which being due for re-veritlcatlon has not been
submitted for such re-verification;
(b) any weight or measure which does not conform to the standards
established by or under the Act:
Provided that where the legal metrology officer is of opinion that the defect or error
in such weight or measure is not such as to require immediate obliteration of the stamp, he
shall inform the user of the defect or error found in the weight or measure and call upon the
user to remove the defect or error within such time not exceedi ng eight days and shall,-
(i) if user fails to remove the defect or error within that period, obliterate the
stamp, or
(ii) lf the defect or error is so removed as to make the weight or measure
conform to the standards established by or under the Act, verify and
stamp such weight or mea sure.
Exptene tion: The obliteration of the stamp on any weight or measure shall not take
away or abridge the power. of the legal metrology officer to seize such weight or measure in
accordance with the provisions of the Act.
15. Stam ping of w eights or measures,- (1) The legal metrology officer snail stamp every
weight or measure, if after testing and verification, he is satisfied that such weight or measure
conforms to the standards established by or under the Act, with a stamp of uniform design
issued by the Contro ller, which shall indicate the number allotted for administrative purpose
to the legal metrology officer by whom it is stamped:
Provided that if by reason of the size or nature of any weight or measure it is not
desirable or practicable to put a stamp thereon, the legal metrology officer shall take such
action as may be directed by the Controller by a general or a special order in writing.
(2) The legal metrology officer shall also mark the year and its quarter of stamping on
every verified weight or measure except when the size or nature of such weight or measure
makes it impracticable.
Explanation : A year shall be deemed to consist of four quarters of which first quarter
shall be of the months of January, February and March which shall be marked as A, second
quarter shall be of the months of April, May and June which shall be marked as B, third
quarter shall be of the months of July. August and September which shall be marked as C
and fourth quarter shall be of the months of October, November and December which shall
be marked as D.
(3) On completion of verification and stamping, the legal metrology officer shall issue a
certificate of verification in the form set out in Schedule V III.
·7-
(4) Where a certificate of verification is lost or destroyed, the holder of the certificate of
verification shall forthwith apply to the legal metrology officer who had issued the certificate,
for the issue of a duplicate certificate of verification. Every such application for the issue of a
duplicate certificate shall be accompanied by a fee of rupees fifty.
(5) On receipt of an application under sub-rule (4), the legal metrology officer shall
issue to the applicant a duplicate copy of the certificate of verification marked 'DUPLICATE',
Previous and next
All provisions of THE TRIPURA LEGAL METROLOGY (ENFORCEMENT) RULES, 2011
Questions people ask
Is rule 14 of THE TRIPURA LEGAL METROLOGY (ENFORCEMENT) RULES, 2011 still in force?
No repeal of the TRIPURA LEGAL METROLOGY (ENFORCEMENT) RULES, 2011 is recorded.