LawGrids logoLAWGRIDS.ORG

Rule 20, The Rajasthan Legal Metrology (Enforcement) Rules, 2011: Provision of supply of Working/Secondary Standards, equipment, etc. to the Legal Metrology Officer

The Rajasthan Legal Metrology (Enforcement) Rules, 2011 - Rule 20

Text of rule 20

Provision of supply of Working/Secondary Standards, equipment, etc. to the Legal Metrology Officer

20. Provision of supply of Working/Secondary Standards, equipment, etc. to the Legal Metrology Officer.– (1) Every Legal Metrology Officer shall be provided with Working /Secondary Standards weights, Working/Secondary Standard balances, and such other equipment includes weighing and measuring devices as may be approved by the Controller from time to time. (2) Every Legal Metrology Officer shall be provided with such dies, punches, paper seal / sticker and such other equipment as may be necessary for affixing the verification stamp, the design and number of which are to be approved by the Controller. (3) Every Legal Metrology Officer shall be provided with punches of suitable sizes of eight-pointed star as shown below for obliterating stamps.

Previous and next

All provisions of The Rajasthan Legal Metrology (Enforcement) Rules, 2011

Questions people ask

Is rule 20 of the Rajasthan Legal Metrology (Enforcement) Rules, 2011 still in force?

No repeal of the Rajasthan Legal Metrology (Enforcement) Rules, 2011 is recorded.