Rule 14, The Rajasthan Legal Metrology (Enforcement) Rules, 2011: Verification and inspection of weights or measures
The Rajasthan Legal Metrology (Enforcement) Rules, 2011 - Rule 14
Text of rule 14
Verification and inspection of weights or measures
14. Verification and inspection of weights or measures.–
(1) Every person using any weight or measure in any transaction or
for protection shall present such weight or measure for
verification/ re-verification, at the office of the Legal Metrology
Officer or at such other place as the Legal Metrology Officer may
specify in this behalf on or before the date on which the
verification falls due:
Provided that where any weight or measure is such that it
cannot, or should not be moved from its location, the person using
such weight or measure shall report to the Legal Metrology Officer
at least thirty days in advance of the date on which the verification
falls due.
(2) Where any weight or measure is such that it cannot, or
should not, be moved from its location, Legal Metrology Officer
shall take necessary steps for the verification of such weight or
measure at the place of its location.
(3) For the verification of weight or measure referred to in
sub-rule (2) the user shall provide such facilities as may be
specified by the Controller.
(4) Every weight or measure presented for verification shall
be complete in itself.
(5) Every weight or measure shall be verified in a clean
condition, and if necessary, the Legal Metrology Officer shall
19¼64½ jktLFkku jkt&i=] ebZ 4] 2011 Hkkx 4 ¼x½
require the owner or user to make necessary arrangement for the
purpose.
(6) A Legal Metrology Officer may visit, as frequently as
possible during the period specified in the Legal Metrology
(General) Rules 2011, every premise within the local limits of his
jurisdiction to inspect and test any weight or measure which is
being or is intended or likely to be used in any transaction or for
protection.
(7) The Legal Metrology Officer shall obliterate the stamp
on any weight or measure, if it is found during inspection that:-
(a) Any weight or measure which being due for re-
verification has not been submitted for such re-
verification.
(b) Any weight or measure which does not conform to
the Standards established by or under the Act:
Provided that where the Legal Metrology Officer is of
opinion that the defect or error in such weight or measure is not
such as to require immediate obliteration of the stamp, he shall
inform the user, of the defect or error found in the weight or
measure and call upon user to remove the defect or error within
such time, not exceeding eight days and shall-
(i) if user fails to remove the defect or error within that
period, obliterate the stamp, or
(ii) if the defect or error is so removed as to make the
weight or measure conform to the standards established
by or under the Act, verify and stamp such weight or
measure.
Explanation: The obliteration of the stamp on any weight or
measure shall not take, away or abridge the power of
the Legal Metrology Officer to seize such weight or
measure in accordance with the provisions of the Act.
Previous and next
All provisions of The Rajasthan Legal Metrology (Enforcement) Rules, 2011
Questions people ask
Is rule 14 of the Rajasthan Legal Metrology (Enforcement) Rules, 2011 still in force?
No repeal of the Rajasthan Legal Metrology (Enforcement) Rules, 2011 is recorded.