Regulation 31, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011: Transmission Tariff/Charges
The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 - Regulation 31
Text of regulation 31
Transmission Tariff/Charges
31. Transmission Tariff/Charges .- (1) The transmission charges payable by the
transmission customers of the transmission system shall be designed to recover the
aggregate revenue requirement computed as annual transmission charges by the
Commission for each year of the control period:
2
[Provided that the Commission during the control period, through separate
notification in the Rajpatra Himachal Pradesh, may, after conducting a detailed study
change the existing transmission pricing framework in accordance with that adopted by the
Central Electricity Regulatory Commission.]
(2) In addition to transmission charges, charges for reactive energy, as may be
determined by the Commission in the MYT order, shall also be payable by all the
transmission customers of the system.
Previous and next
Questions people ask
Is regulation 31 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 is recorded.