Regulation 31, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011: Transmission Tariff/Charges

The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 - Regulation 31

Text of regulation 31

Transmission Tariff/Charges

31. Transmission Tariff/Charges .- (1) The transmission charges payable by the transmission customers of the transmission system shall be designed to recover the aggregate revenue requirement computed as annual transmission charges by the Commission for each year of the control period: 2 [Provided that the Commission during the control period, through separate notification in the Rajpatra Himachal Pradesh, may, after conducting a detailed study change the existing transmission pricing framework in accordance with that adopted by the Central Electricity Regulatory Commission.] (2) In addition to transmission charges, charges for reactive energy, as may be determined by the Commission in the MYT order, shall also be payable by all the transmission customers of the system.

Previous and next

All provisions of The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011

Questions people ask

Is regulation 31 of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 still in force?

No repeal of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 is recorded.